15.07.2013 Views

drilling jars and energizers - Wagenborg

drilling jars and energizers - Wagenborg

drilling jars and energizers - Wagenborg

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

WAGENBORG OILFIELD SERVICES<br />

RUSSIA<br />

“PD” Drilling Jar &<br />

Energizer<br />

NEW GENERATION DRILLING TOOLS


‘PD’ DRILLING JAR OPERATION<br />

Jarring Up<br />

To jar up apply overpull at the jar as required <strong>and</strong> wait for jar to fire,<br />

lock will automatically release when lock setting load is exceeded. The<br />

more overpull applied on the jar, the greater impact will be achieved.<br />

To repeat jarring, reset jar into locked position by applying weight on<br />

the jar which then automatically will return to it’s locked position <strong>and</strong><br />

again be ready to be fired up or down as required. Jar lock load will<br />

have to be exceeded for the lock to release <strong>and</strong> hydraulics to be engaged.<br />

Overpull in excess of Max Pre-Jarring should not be applied as it<br />

may damage the hydraulics of the jar.<br />

Jarring Down<br />

To jar down, apply weight on the jar as required <strong>and</strong> wait for jar to<br />

fire, the lock will automatically release when lock setting load is exceeded.<br />

The more weight applied on the jar, the greater impact will be<br />

achieved.<br />

To repeat to jarring, reset jar into locked position by applying overpull<br />

at the jar which then automatically will return to it’s locked position <strong>and</strong><br />

again be ready to be fired up or down as required. Jar lock load will<br />

have to be exceeded for lock to release <strong>and</strong> hydraulics to be engaged.<br />

Energizer Up <strong>and</strong> Down Operation<br />

The energizer will automatically be applied when opening the jar so<br />

fully concentrate on the loads applied on the jar <strong>and</strong> the energizer will<br />

adjust as required.<br />

The energizer will, when operated with the ‘PD’ Jar, increase acceleration<br />

of hammer weight between jar <strong>and</strong> energizer <strong>and</strong> thereby increase<br />

impacts. The impacts will also due to the two-stage design increase impacts<br />

in horizontal wells. This double action energizer will also minimize<br />

jarring shock loads on working string <strong>and</strong> topside equipment.<br />

WAGENBORG OILFIELD SERVICES


JAR SETTINGS<br />

Please note that all above loads <strong>and</strong> time delays are approximate only.<br />

WAGENBORG OILFIELD SERVICES


PUMP OPEN FORCE JAR AND ENERGIZER<br />

Pump pressure will generate a force, which will try to open the tool <strong>and</strong> thereby increase ease of<br />

opening jar lock <strong>and</strong> increase impact. For calculation please refer to Pump Force table.<br />

In horizontal wells the energizer will, due to the Pump Open Force <strong>and</strong> spring force, also assist in<br />

moving the BHA to maintain weight on bit.<br />

Pump Open Force Chart<br />

Force created pressure drop across the bit.<br />

WAGENBORG OILFIELD SERVICES


‘PD’ JAR PLACEMENT IN BHA<br />

The ‘PD’ Jar can be placed in the bottom hole assembly either in tension or compression but it is<br />

recommended that the jar is placed as close to any possible stuck point in order to achieve the<br />

highest impact where it counts. Ensure that sufficient weight (hammer weight) is placed above the<br />

jar for high impact.<br />

The energizer should be placed above the jar hammer weight <strong>and</strong> with sufficient weight above<br />

the energizer in order to ensure high down jar impact.<br />

Never place jar or energizer at the neutral point in string as it may cause excessive wear <strong>and</strong>/or<br />

damage to the tools.<br />

Never place tools at a transition point (i.e.between 8” (203mm) O.D. <strong>and</strong> 6 ½” (165mm)<br />

O.D. collars).<br />

Never place jar next to or below a stabilizer, roller reamer or similar tool.<br />

Drill collars <strong>and</strong>/or pipe connection O.D. above the jar <strong>and</strong> immediate (1-2 joints) below the jar<br />

should never be larger than the O.D. of the jar.<br />

For dual jar <strong>and</strong> energizer placement it is recommended that all notes on placement are considered<br />

<strong>and</strong> that the second jar should be placed higher up in the string again with sufficient hammer<br />

weight to fire up or down as required.<br />

Beware that if weight below the jar is greater than lock setting of the jar, the lock may release<br />

to activate jar hydraulics when string is picked up. Jar can be delivered in open position with a<br />

clamp to eliminate this problem.<br />

WAGENBORG OILFIELD SERVICES


‘PD’ JAR AND ENERGIZER SPECIAL FEATURES<br />

The ‘PD’ Drilling Jar <strong>and</strong> Drilling Energizer are a new generation of <strong>drilling</strong> tools designed <strong>and</strong><br />

manufactured for the severe <strong>drilling</strong> conditions of today, such as severe directional <strong>and</strong> horizontal<br />

<strong>drilling</strong> conditions.<br />

Ensuring secure <strong>and</strong> durable operation <strong>and</strong> providing high impact as <strong>and</strong> when required, regardless<br />

if in vertical, high angle or the horizontal section of the well.<br />

The ‘PD’ tools feature high strength steel, no chrome exposure either internal or external to <strong>drilling</strong><br />

fluids or bore hole. Low internal friction due to design <strong>and</strong> use<br />

of low friction sealing arrangement.<br />

Large internal diameter for high volume fluid passage has been<br />

achieved without sacrificing tool strength. High impacts even<br />

under low loads which can be increased considerably with<br />

the use of the two stage mechanical ‘PD’ Energizer. Also the<br />

Energizer will absorb shock waves to surface <strong>and</strong> thereby limit<br />

damage to surface equipment.<br />

WAGENBORG OILFIELD SERVICES


SPECIFICATIONS<br />

WAGENBORG OILFIELD SERVICES


CONTACTS AND SERVICES<br />

SERVICES:<br />

API Machine Shop<br />

Tubular Rental<br />

Down Hole Equipment Rental <strong>and</strong> Sales<br />

Fishing <strong>and</strong> Re-entry Equipment<br />

Rentals & Sales<br />

Stabilizers Redress<br />

RCT Services<br />

H<strong>and</strong>ling <strong>and</strong> Hoisting Equipment Rental<br />

WAGENBORG Oilfield Services, LLC<br />

629800<br />

Panel 8, Noyabrsk, Russian Federation<br />

Tel. +7 3496 354 842<br />

Fax. +7 3496 354 852<br />

info.russia@wagenborg.com<br />

www.wagenborg.com<br />

Sign of solutions.<br />

WAGENBORG OILFIELD SERVICES

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!