Appendix A of Report to Congress: National Plan of Integrated ... - FAA
Appendix A of Report to Congress: National Plan of Integrated ... - FAA
Appendix A of Report to Congress: National Plan of Integrated ... - FAA
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
City Airport<br />
Service Level Current Aircraft<br />
LocID Owner-<br />
ship Hub Current Year 5 Enplaned Based<br />
2011-2015<br />
Dev Cost<br />
St. James St James Municipal JYG PU GA GA 0 4 $1,510,789<br />
St. Paul Lake Elmo 21D PU R R 0 196 $7,530,887<br />
St. Paul St Paul Down<strong>to</strong>wn Holman Field STP PU R R 2,662 86 $10,305,000<br />
Staples Staples Municipal SAZ PU GA GA 0 15 $1,391,540<br />
Thief River<br />
Falls<br />
Thief River Falls Regional TVF PU CS CS 3,092 27 $14,111,448<br />
Tower Tower Municipal 12D PU GA GA 1 22 $2,956,638<br />
Tracy Tracy Municipal TKC PU GA GA 0 7 $2,257,000<br />
Two Harbors Richard B Helgeson TWM PU GA GA 0 29 $2,033,368<br />
Wadena Wadena Municipal ADC PU GA GA 0 12 $1,997,105<br />
Walker Walker Municipal Y49 PU GA GA 0 14 $2,687,628<br />
Warroad Warroad International Memorial RRT PU GA GA 1 12 $2,855,126<br />
Waseca Waseca Municipal ACQ PU GA GA 0 20 $3,294,289<br />
Whea<strong>to</strong>n Whea<strong>to</strong>n Municipal ETH PU GA GA 0 5 $3,550,458<br />
Willmar<br />
Willmar Municipal -<br />
John L Rice Field<br />
BDH PU GA GA 0 61 $2,287,317<br />
Windom Windom Municipal MWM PU GA GA 2 12 $2,862,947<br />
Winona<br />
Winona Municipal -<br />
Max Conrad Field<br />
ONA PU GA GA 13 46 $7,473,158<br />
Winsted Winsted Municipal 10D PU GA GA 0 44 $3,883,737<br />
Worthing<strong>to</strong>n Worthing<strong>to</strong>n Municipal OTG PU GA GA 3 22 $2,269,334<br />
<strong>National</strong> <strong>Plan</strong> <strong>of</strong> <strong>Integrated</strong> Airport Systems (2011-2015) A-55