<strong>ERIK</strong> C. <strong>BACKUS</strong>, P.E., <strong>LEED®</strong> <strong>AP</strong>, <strong>FMP</strong><br />

5540 Hollins Lane Email: backusec@hotmail.com<br />

Burke, VA 22015<br />

Phone: (703) 323-0620<br />

Science and Technology II Renovation and Expansion<br />

Project List<br />

Location: Fairfax, Virginia<br />

Timeframe: July 2008 to January 2010<br />

Organization: <strong>George</strong> <strong>Mason</strong> <strong>University</strong><br />

Supervisor: Mr. Charles “Chuck” Fanshaw<br />

Key Tasks: Renovation and 150% expansion of an existing 100,000 sf office and classroom building into the<br />

<strong>University</strong>’s center for wet lab education. Managed the development of the College of Science Master<br />

Plan. Managed CM, CxA, and A/E teams through Design Development (Preliminary Design).<br />

Contract Value: Overall Project: $49.5 million, Construction: $40.8 million<br />

Photos/Details: Available upon request<br />

Fine Arts Building Renovation<br />

Location: Fairfax, Virginia<br />

Timeframe: November 2008 to January 2010<br />

Organization: <strong>George</strong> <strong>Mason</strong> <strong>University</strong><br />

Supervisor: Mr. Charles “Chuck” Fanshaw<br />

Key Tasks: Renovation of a 41,400 sf office and classroom building into the <strong>University</strong>’s performing arts annex. Led<br />

the reconfirmation of the College of Visual and Performing Arts Precinct Master Plan and overseeing the<br />

design with the A/E team.<br />

Contract Value: Overall Project: $9.8 million, Construction: $8 million<br />

Photos/Details: Available upon request<br />

“Village of Hope” Master Plan and Development<br />

Location: Hawr-Rajab, Iraq<br />

Timeframe: November 2007 to October 2008<br />

Organization: 20 th Engineer Brigade (C)(A)<br />

Supervisor: COL Peter “Duke” A. DeLuca<br />

Key Tasks: The complete redevelopment of a village directly south of Baghdad that was ravaged by Al Qeada.<br />

Planning, design, and executed work involving the training local citizens on trade labor skills to rebuild<br />

infrastructure, housing, and public facilities to reinvigorate their war-torn village.<br />

Contract Value: $13.1 million<br />

Photos/Details: Available upon request<br />

Al Taji Grand Canal Highway Bridge<br />

Location: Al Taji, Iraq<br />

Timeframe: August 2007 to September 2008<br />

Organization: 20 th Engineer Brigade (C)(A)<br />

Supervisor: COL Peter “Duke” A. DeLuca<br />

Key Tasks: Design for the complete reconstruction of the southbound span and the repair of the northbound span for<br />

the Iraqi Highway 1 four-lane bridge over the Grand Canal north of Baghdad. Led the design team, met<br />

with US Government (Department of State) and Iraqi Officials, and ensured the project execution.<br />

Contract Value: Approximately $4 million (project was funded through Iraqi Government Sources; in Dinar)<br />

Photos/Details: Available upon request