Construction<br />
Concrete Batch plant<br />
onsite<br />
Concrete was pumped<br />
600 ft to be poured<br />
Liquid nitrogen was<br />
used to keep the<br />
concrete cool during the<br />
day<br />
Temperatures during<br />
the summer exceeded<br />
130 degrees F