21.07.2013 Views

Michael Sol Collection - Milwaukee Road Archive

Michael Sol Collection - Milwaukee Road Archive

Michael Sol Collection - Milwaukee Road Archive

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

6<br />

6<br />

Electrician Ted Veres is shown as he<br />

fabricates a wiring harness. Over one<br />

mile of new control wiring is installed<br />

Electrician Ted Veres is shown as he<br />

in each unit as it undergoes rebuilding.<br />

fabricates a wiring harness. Over one<br />

mile of new control wiring is installed<br />

in each unit as it undergoes rebuilding.<br />

GP-9s that were upgraded to 2,000<br />

horsepower. The financial rewards<br />

gained GP-9s inthat thewere 1970upgraded programto led 2,000 to<br />

the horsepower. decision to The go ahead financial with the rewards current<br />

gained program, in the Mr. 1970 Upton program said. led Theto<br />

experience the decision gained to go then, ahead coupled with the with cur­<br />

what rent he program, and his Mr. staff Upton have learned said. The in<br />

visits experience to other gained railroads then, enaged coupled in with locomotive<br />

what he and rebuilding, his staff is have resulting learned in in<br />

the visits production to other railroads of a unitenaged superior in to lo­<br />

anything comotive turned rebuilding, out byis the resulting shops in in<br />

the the past. production of a unit superior to<br />

anything The current turned program, out by which the shops is exin<br />

pected the past. to extend into the early part<br />

of 1973, The current has a team program, of25 experienced which is ex­<br />

rebuilders pected to assigned extend into to the it, including early part<br />

machinists, of 1973, has electricians, a team of25 boilermak­ experienced<br />

ers, rebuilders carpenters, assigned pipe fitters to it, and including laborers.<br />

machinists, Production electricians, averages about boilermak­ a unit<br />

and ers, acarpenters, half per month. pipe fitters and laborers.<br />

Production averages about a unit<br />

Rebuilt Units Assigned<br />

and a half per month.<br />

to Coal Consists<br />

The first Rebuilt of the Units rebuilt Assigned units went<br />

into service during to Coal Consists April as part of a<br />

coalThe trainfirst consist of the onrebuilt the Terre units Haute went<br />

Division. into service Present during plans April call as part for the of a<br />

remainder coal train consist of the on units the to Terre be given Haute<br />

similar Division. assignments Present plans on thiscall high-den­ for the<br />

sity remainder coal run. of the units to be given<br />

similar assignments on this high-den­<br />

From Lambs to Lions<br />

sity coal run.<br />

Once in the <strong>Milwaukee</strong> Shops, it<br />

doesn't take From long Lambs for the to Lions 15-year-old<br />

units Once to be in transformed. the <strong>Milwaukee</strong> First, Shops, theyit<br />

undergo doesn't take a complete long for stripping. the 15-year-old Then,<br />

the units frames to be are transformed. cleaned, straightened First, they<br />

and undergo painted a complete and all salvageable stripping. parts Then,<br />

are the reclaimed. frames are Next, cleaned, the long straightened hood is<br />

straightened, and painted and repaired, all salvageable modified parts and<br />

painted. are reclaimed. The height Next, ofthe thelong shorthood hoodis<br />

isstraightened, lowered and the repaired, hood itself modified is modi­ and<br />

fied painted. to accommodate The height aof new the headlight­ short hood<br />

number is lowered boxand assembly. the hood Aitself newis modiprewiredfied to electrical accommodate cabinet a new isheadlight added.<br />

Next, number a new box engine, assembly. a rebuilt A new generapretor,wired air compressor electrical cabinet and various is added. other<br />

parts Next, are a new installed engine, and a rebuilt aligned, genera­ and<br />

the tor, entire air compressor unit receives and its various final coat other<br />

of parts paint. are Finally, installed before and aligned, being re­ and<br />

leased the entire into unit trainreceives service, its thefinal unitcoat is<br />

of paint. Finally, before being released<br />

The into <strong>Milwaukee</strong> train service, <strong>Road</strong> the Magazine<br />

unit is<br />

The <strong>Milwaukee</strong><br />

<strong>Michael</strong> <strong>Sol</strong><br />

<strong>Road</strong><br />

<strong>Collection</strong><br />

Magazine

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!