1867: New Moon Company - most successful mine <strong>of</strong> the Moon Reef was the New Moon Co. The mine<br />

commenced in 1867, their claim being south <strong>and</strong> adjoining the Robin Hood Co. Capital was 16<br />

shares <strong>of</strong> £75 each. In a short time, after only £160 had been called up, payable quartz from 173 feet<br />

enabled dividends <strong>of</strong> £2778 ... In 1870 a registered company was formed with capital <strong>of</strong> £24,000 ...<br />

There were two shafts on the lease, each 280 feet, while work had commenced on a new engine shaft<br />

<strong>and</strong> the erection <strong>of</strong> a winding plant. The company purchased the Robin Hood's lease <strong>and</strong> plant in<br />

1878. The Robin Hood shaft became the New Moon main shaft <strong>and</strong> was eventually deepened to<br />

2,400 feet. The New Moon Co was re-registered in 1886 as a No Liability Co with capital <strong>of</strong><br />

£12,000 <strong>and</strong> the mine developed into one <strong>of</strong> the best-managed mines on the <strong>Bendigo</strong> goldfield ...<br />

This company, at the close <strong>of</strong> 1906 declared its 200th dividend. From 1878 to 1890 were lean years<br />

for the company when many calls were made to shareholders, while for a period <strong>of</strong> 6 years the mine<br />

was let to tributers who crushed 6417 tons for 415 oz ... dividends were paid from 1892 to 1913 ...<br />

mine closed down in 1917 Apart from public crushing, the company crushed 545,289 tons <strong>of</strong> stone<br />

during its existence, all dug from its own mine <strong>and</strong> yielded 230,601 oz <strong>of</strong> gold, <strong>and</strong> paid shareholders<br />

the sum <strong>of</strong> £377,400. The former mine was taken over by the <strong>Bendigo</strong> Amalgamated Co from 1917<br />

to 1922. It was re-opened in 1928 only to close in 1932. Later, cyaniders treated the s<strong>and</strong>, <strong>and</strong> this<br />

was removed from its original position <strong>and</strong> dumped across the road into Napoleon Gully. 1<br />

March 1867:<br />

Raywood Division. [E P Virtue]<br />

The total number <strong>of</strong> miners is as follows:<br />

European Chinese Total for the Subdivision<br />

Alluvial miners 500 50 550<br />

Quartz miners 200 200<br />

Total 700 50 750<br />

The machinery is as follows:<br />

Alluvial Mining:<br />

Puddling mills, 20 at work, 25 idle<br />

Quartz Mining:<br />

Steam engines, 3 at work, 3 idle, 60 stamp heads, 70hp<br />

Total value <strong>of</strong> machinery £312,500<br />

Square miles <strong>of</strong> alluvial ground, 50<br />

No <strong>of</strong> distinct auriferous reefs, 18<br />

Mining is at st<strong>and</strong> still, due to continued drought. The Nil Desper<strong>and</strong>um Co, Raywood, is crushing<br />

about 400 tons <strong>of</strong> their quartz at the Eureka engine, Sebastian, seven miles distant. Shaffer <strong>and</strong> party,<br />

<strong>and</strong> other good claimholders, who have a large quantity <strong>of</strong> quartz stacked on the surface, are waiting<br />

until the crushing machines in Raywood <strong>and</strong> Elysian Flat commence operations, which cannot be<br />

until a heavy fall <strong>of</strong> rain. A new company called the ‘Croesus’ has commenced work on a line with<br />

the Nil Desper<strong>and</strong>um Co, who is obtaining good returns. 2<br />

June 1867:S<strong>and</strong>hurst Division. [N G Stephens]: during the past 3 months, mining has been in a depressed state,<br />

partly because some <strong>of</strong> our quartz claims were not yielding well, partly from the unsettled drainage<br />

<strong>of</strong> reefs question, <strong>and</strong> partly from the scarcity <strong>of</strong> money; but prospects appear brighter, <strong>and</strong> results<br />

over the last few weeks were encouraging. Some reefers are unworked due to being flooded,<br />

proprietors will not erect machinery without some guarantee or hope <strong>of</strong> remuneration, <strong>and</strong><br />

claimholders will not contribute enough to induce them. On some lines the claimholders <strong>and</strong><br />

machine-holders are endeavouring, by private agreement, to arrange drainage <strong>of</strong> their claims. A<br />

desire is shown to render the new drainage byelaw workable. The Catherine Reef Co are down<br />

440feet; the Comet Co, on the Redan, 450 feet; the Johnson’s Reef Gold Mining Co, 475 feet, all<br />

with good prospects ... The North Johnson’s Reef Co struck a new reef, at a depth <strong>of</strong> 270 feet. The<br />

Hustler’s, New Chum, Victoria, Devonshire, Redan, Anglo <strong>and</strong> Christmas Reefs are yielding well.<br />

The 3,149 oz. obtained by the Energetic Co on the Victoria Reef, was from 287 tons, at nearly 340<br />

feet. The prospectors <strong>of</strong> the Wallaby Reef, Smokey Creek, had a yield <strong>of</strong> 156 oz. from 165 tons <strong>of</strong><br />

stone. The proprietors on the Dark Aerial Reef ... have payable crushings, but are not doing much at<br />

present. Quartz prospecting claim - new reef, about 1 mile west <strong>of</strong> the Wallaby, <strong>and</strong> one on the Try-<br />

Again Reef, Emu Creek, but payable quartz not reported. In alluvial mining at Huntley; the claims<br />

are yielding steadily, <strong>and</strong> the field is extending. Some new companies have been formed, <strong>and</strong> new<br />

machinery erected. Prospecting claim at Myer’s Flat. The applicants obtained 7dwt <strong>of</strong> gold from 1<br />

1/2 loads <strong>of</strong> stuff <strong>and</strong> the sinking was 36 ft. A small rush has set in there. 3<br />

1 Perry, 1975 pp214-227<br />

2 Mining Surveyors’ Reports, March 1867<br />

3 Mining Surveyors’ Reports, June 1867