27.07.2013 Views

PDF version - The Railroad Commission of Texas

PDF version - The Railroad Commission of Texas

PDF version - The Railroad Commission of Texas

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

-----------------<br />

ACRE CODE (AC-CD)<br />

-----------------<br />

THIS DATA ITEM INDICATES THE ALLOCATION FORMULA FOR FIELDS WITH<br />

THE ACRES FACTOR IN THE ALLOCATION FORMULA. SEE APPENDIX B FOR<br />

THE ALLOCATION FACTOR CODES. THE CODES THAT CAN BE USED FOR<br />

THIS DATA ITEM ARE 02, 03, 07, 08, 09, 10, 11, OR 12.<br />

-------------------------------<br />

ACRES FACTOR AMOUNT (ACRG-FACT)<br />

-------------------------------<br />

THIS DATA ITEM CONTAINS THE AMOUNT OF THE PRORATION FACTOR<br />

DESCRIBED IN "ACRE CODE." THIS DATA ITEM IS SEVEN WHOLE NUMBERS<br />

AND SEVEN DECIMAL PLACES. FOR WILDCAT FIELDS, THIS DATA ITEM<br />

WILL CONTAIN THE NUMBER OF DAYS IN THE MONTH. THE NUMBER OF DAYS<br />

IN THE MONTH IS USED TO FIGURE THE ALLOWABLE FOR THE FIELD.<br />

---------------------<br />

OTHER CODE (OTHER-CD)<br />

---------------------<br />

THIS CODE INDICATES THE FACTOR FOR FIELDS WITH A FACTOR OTHER<br />

THAN PER WELL OR ACRES IN THE ALLOCATION FORMULA. SEE APPENDIX<br />

B FOR THE ALLOCATION FACTOR CODES. CODES 3 THROUGH 18 CAN APPLY<br />

TO THIS DATA ITEM.<br />

--------------------------------<br />

OTHER FACTOR AMOUNT (OTHER-FACT)<br />

--------------------------------<br />

THIS DATA ITEM INDICATES THE AMOUNT OF THE OTHER FACTOR (OTHER<br />

THAN PER WELL OR ACRES) IN THE ALLOCATION FORMULA. THREE WHOLE<br />

NUMBERS AND SIX DECIMAL PLACES ARE ALLOTTED. FOR WILDCAT FIELDS,<br />

THIS DATA ITEM WILL CONTAIN THE MONTHLY PRODUCTION FACTOR.<br />

-------------------<br />

SW-SPLIT (SW-SPLIT)<br />

-------------------<br />

IF THE PRODUCTION FACTOR IS CHANGED DURING THE MONTH, THE<br />

NEW PRODUCTION FACTOR WILL BE STORED HERE. THE PRODUCTION<br />

FACTOR IS SET DURING MONTHLY HEARINGS AT THE COMMISSION.<br />

-----------------------<br />

SPLIT DATE (SPLIT-DATE)<br />

-----------------------<br />

THE EFFECTIVE DAY OF A SECOND PRODUCTION FACTOR FOR THE<br />

MONTH.<br />

II.18

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!