03.08.2013 Views

Complete Docket - South Dakota Public Utilities Commission - State ...

Complete Docket - South Dakota Public Utilities Commission - State ...

Complete Docket - South Dakota Public Utilities Commission - State ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

- "'4*? MWlt L t 3 L<br />

f 013 West- f4run'som; Ste. 5200<br />

Seaiflc* Washington 9811941911<br />

Call Timing for Usage Sensitive Services<br />

Wl~rre charges for a service are specified based on the duratiun of use, s<br />

tclcphonc call, the following rules apply:<br />

5.2.1 Calls are measured in durational increments identified for ea<br />

fractions of a measurement increment. are rounded-up to the<br />

5.22 Timing on completud calls begins when<br />

is determined by hadware answer sup<br />

by the terminati~~g local carrier and<br />

5.2.3 Tinling terminates on dl cab when the calling party hang<br />

receives an off-hook signal from the te<br />

5.24 Calls originating in one time period<br />

to the rates in effect during different<br />

53.5 All times refer to 'local time.<br />

Ken-i Bunigardner. VP Customer Network Operations<br />

Telicor Inc.<br />

100 West Harrison; Ste. 5200<br />

Seattle, Washhgton 98119-4191

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!