03.08.2013 Views

1. Rationalization and simplification of renewal of registration ... - rdso

1. Rationalization and simplification of renewal of registration ... - rdso

1. Rationalization and simplification of renewal of registration ... - rdso

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>1.</strong> <strong>Rationalization</strong> <strong>and</strong> <strong>simplification</strong> <strong>of</strong> <strong>renewal</strong> <strong>of</strong> <strong>registration</strong><br />

process:<br />

To overcome certain shortcomings observed in the <strong>renewal</strong> <strong>of</strong> <strong>registration</strong> process<br />

viz:<br />

I. Good firms temporarily delisted since firms fail to apply for <strong>renewal</strong> by oversight<br />

within the expiry <strong>of</strong> validity <strong>of</strong> <strong>registration</strong>.<br />

II. The <strong>renewal</strong> process being a time consuming since the process <strong>of</strong> <strong>renewal</strong> is<br />

almost similar to fresh <strong>registration</strong> process.<br />

III. No in built system to assess the performance <strong>of</strong> the firm with reference to<br />

warranty failures/in service failures/joints inspection, audit observations etc.<br />

IV. Repeated applications for similar items, resulting in duplication <strong>of</strong> activities like<br />

STR verification capacity assessment etc.<br />

QA (Mech) Directorate has simplified <strong>renewal</strong> <strong>of</strong> <strong>registration</strong> process.<br />

Silent features <strong>of</strong> the simplified process are :<br />

a) Extension <strong>of</strong> validity <strong>of</strong> approved firms become an internal activity <strong>of</strong> Dte,where<br />

firms need not apply for <strong>renewal</strong> <strong>of</strong> <strong>registration</strong>.<br />

b) Annual calendar <strong>of</strong> <strong>renewal</strong> <strong>of</strong> <strong>registration</strong> is prepared for the year <strong>and</strong> Zonal<br />

<strong>of</strong>fices are informed well in advance to take up <strong>renewal</strong> <strong>of</strong> <strong>registration</strong> <strong>of</strong> firms as<br />

per the scheduled calendar.<br />

c) Zonal <strong>of</strong>fice conducts <strong>renewal</strong> audit in the firms premises, advising the firms in<br />

advance <strong>and</strong> obtaining the self appraisal <strong>of</strong> its performance in the st<strong>and</strong>ard<br />

format.<br />

d) The self appraisal report <strong>of</strong> the firm <strong>and</strong> assessment report <strong>of</strong> <strong>renewal</strong> audit are<br />

submitted in scientifically developed st<strong>and</strong>ard format QM-F-7.1-1<strong>1.</strong><br />

e) In the revised procedure, visit <strong>of</strong> RDSO <strong>of</strong>ficial is limited to assessment <strong>and</strong><br />

sample testing reducing the time consumed for <strong>renewal</strong>.<br />

f) Items are grouped into major sub-groups like Air brake items,Metal bonded<br />

rubber items, Nylon/Acetal items, Forgings items etc.<strong>and</strong> <strong>renewal</strong> <strong>of</strong> each group<br />

is undertaken in a particular calendar month facilitating easy assessment <strong>and</strong>


comparison. Similarly other items <strong>of</strong> a firms belonging to a same sub group are<br />

renewed at once avoiding multiple visits.<br />

The following improvements are effected by processing <strong>renewal</strong> in st<strong>and</strong>ard format,<br />

since required fields are inbuilt:<br />

Uniformity in the assessment <strong>of</strong> different firms.<br />

All the performance indices like warranty failures, in-service failures, joints<br />

inspection including corrective <strong>and</strong> preventive action are properly reviewed<br />

during <strong>renewal</strong> without any omissions.<br />

Variations in STR are identified during audit <strong>and</strong> reviewed thoroughly<br />

Charges in QAP are reviewed <strong>and</strong> audited.<br />

Compliance <strong>of</strong> Quality audit observations are reviewed.<br />

(Quality <strong>of</strong> assessment improvement due to formation <strong>of</strong> assessment criteria.)<br />

2 Formatting <strong>of</strong> Quality Assurance Plan<br />

Preparation <strong>and</strong> submission <strong>of</strong> QAP by the firm is an important activity <strong>of</strong> the vendor<br />

<strong>registration</strong>. Firms prepare <strong>and</strong> submit QAP in their own style differing largely from<br />

one firm to other dealing similar items making it difficult to scrutinize the QAP by<br />

RDSO <strong>of</strong>ficial.<br />

Normally the shortcomings observed are:<br />

i) Quality Assurance Plan submitted by firms shall contain the following important<br />

requirements <strong>of</strong> RDSO specially mentioned in Specification/STR <strong>of</strong> the product.<br />

Qualification <strong>and</strong> experience <strong>of</strong> the personnel to be displayed for various<br />

activities <strong>of</strong> manufacture/testing.<br />

Details <strong>of</strong> manufacturing <strong>and</strong> testing process being followed.<br />

Calibration <strong>of</strong> testing equipment <strong>and</strong> its frequency.<br />

However, due to lack <strong>of</strong> trained <strong>of</strong>ficials, lot <strong>of</strong> omissions are taken place during<br />

submission/verification <strong>of</strong> QAP submitted by firms <strong>and</strong> as a result some important<br />

criteria envisaged in specification are not included.<br />

ii) New vendors particularly small scale industries face lot <strong>of</strong> difficulty to prepare<br />

QAP <strong>and</strong> sometimes feel harassed due to lack <strong>of</strong> underst<strong>and</strong>ing <strong>of</strong> provisions <strong>of</strong><br />

Specn./STR while preparing QAP.<br />

iii) In every stage <strong>of</strong> verification, some modification are suggested by RDSO in the<br />

QSP submitted by firms, Since there may be minor variations in the scrutiny<br />

process by RDSO <strong>of</strong>ficials scrutinizing the QAP, it is one <strong>of</strong> the main reason for<br />

delay in fresh <strong>registration</strong> <strong>of</strong> cases.


iv) Complaints received by the firms or RDSO about approved products are not<br />

properly connected <strong>and</strong> no proper records are maintained.<br />

v) Outsourcing <strong>of</strong> sub-assemblies/components is not properly identified <strong>and</strong> also<br />

the activities carried out in the ancillary works/additional works is not clearly<br />

brought out.<br />

vi) Internal inspection from raw material to in process/final inspection is not properly<br />

brought out by the firms in their QAP.<br />

To overcome these shortcomings <strong>and</strong> to facilitate easy preparation <strong>and</strong> scrutiny <strong>of</strong><br />

QAP, QA(Mech) Dte has developed a st<strong>and</strong>ard format for preparation <strong>of</strong> QAP, dividing<br />

into different sections. The following are the different sections <strong>of</strong> QAP format (QM-RF<br />

7.1-3) <strong>and</strong> brief subjects dealt in the section are furnished below:-<br />

SECTION A: ORGANISATION CHART<br />

SECTION B: QUALIFICATION/ EXPERIENCE OF QC PERSONNEL<br />

Part I : Details <strong>of</strong> qualification/ experience <strong>of</strong> the quality control personnel<br />

specified in the STR/ Specification <strong>of</strong> RDSO <strong>of</strong> the items applied for approval/<br />

<strong>renewal</strong>.<br />

Part II : Qualification <strong>of</strong> other key personnel <strong>and</strong> the <strong>of</strong>ficials deployed in Quality<br />

Control Cell.<br />

SECTION C: PROCESS FLOW CHART/ DESCRIPTION OF MANUFACTURING<br />

PROCESS<br />

Part I: Process Flow Chart indicating process <strong>of</strong> manufacture for an individual<br />

product, with quality control points.<br />

Part II: Brief description <strong>of</strong> different manufacturing process mentioned in flow<br />

chart:<br />

a) Details <strong>of</strong> the manufacturing & testing process specially mentioned<br />

in the specification.<br />

b) Brief details <strong>of</strong> the other manufacturing process.<br />

Part III: Brief description <strong>of</strong> ancillaries & additional units (if any):<br />

SECTION D: DETAILS OF SUB-ASSEMBLIES/ COMPONENTS MANUFACTURED<br />

IN-HOUSE AND OUTSOURCED.<br />

Part I: Details <strong>of</strong> in-house manufactured (Components/ sub-assemblies)<br />

Part II: Details <strong>of</strong> components/Sub-assemblies purchased from RDSO approved<br />

primary/ sublet vendors.


Part III: Details <strong>of</strong> items outsourced from other than RDSO approved items.<br />

SECTION E: INCOMING RAW MATERIAL & INPROCESS/ FINAL INSPECTION<br />

Stage inspection detailing inspection procedure, inspection parameters, method <strong>of</strong><br />

testing/ test procedure including sample sizes for destructive <strong>and</strong> non- destructive<br />

testing etc.<br />

Part I: Incoming raw materials/ parts/ sub-assemblies.<br />

Part II: In process inspection (<strong>of</strong> the product)<br />

Part III: Final internal inspection <strong>of</strong> the product by the firm.<br />

SECTION F: CALIBRATION OF TESTING MEASURING EQUIPMENT<br />

Part I: Inhouse Testing facilities available for calibration with the firm.<br />

Part II: Personnel trained for inhouse calibration.<br />

Part III: Calibration plan for the items identified for specified calibration in<br />

STR/Specification.<br />

Part IV: Calibration plan for other measuring equipment.<br />

SECTION G: SYSTEM OF MAINTAINING THE DATE OF CUSTOMER COMPLAINTS/<br />

WARRANTY FAILURES<br />

Warranty failures/ In-service failures reported from customers.<br />

*The firm shall maintain a complaint register in the above format <strong>and</strong> the<br />

summary required to be given during <strong>renewal</strong><br />

SECTION H : ANY ADDITIONAL INFORMATION FIRM WISH TO SUBMIT<br />

The firm can furnish any other information which they wish to submit on items other<br />

than furnished in annexure A to F.


3 Improvement in Vendor Directory<br />

i) Improvements in the vendor directory published by QA(Mech) Dte.<br />

a) The items published have been segregated directorate-wise to facilitate<br />

easy identification <strong>of</strong> controlling directorate <strong>and</strong> also address, Fax<br />

number <strong>of</strong> ED <strong>of</strong> the directorate is published.<br />

b) The designation <strong>of</strong> the Director who co-ordinate the vendor approval <strong>of</strong><br />

the item is indicated, against the item in the index <strong>and</strong> also the cell no.<br />

, e-mail & fax no. <strong>of</strong> the co-coordinating director is furnished in the<br />

beginning <strong>of</strong> the vendor directory to facilitate the field unit as well as<br />

vendors seeking <strong>registration</strong> to access the controlling director easily.<br />

ii) On line updation <strong>of</strong> vendor directory<br />

Vendor directory is published once in six months <strong>and</strong> subsequent changes<br />

in the vendor directory in a month are published in the 1 st week <strong>of</strong> next month as an<br />

amendment. Scanned copies <strong>of</strong> amendment are uploaded in the website <strong>and</strong> hard<br />

copies are sent to zonal Railways by fax/post. Zonal railways are informed about the<br />

changes in vendor directory almost one month after the change occurred <strong>and</strong><br />

sometimes it is possible that a delisted firm may get an order in this period due to late<br />

communication. To address the problem QA mech dte. Introduced a system<br />

improvement <strong>of</strong> online updating the status <strong>of</strong> the firm, soon after the firm approved/<br />

delisted or any change in the vendor status, in the RDSO website by developing<br />

s<strong>of</strong>tware. In this system, whenever a firm is delisted, the name <strong>of</strong> the firm shown in red<br />

colour <strong>and</strong> the date <strong>of</strong> delisting also indicated. If a vendor is freshly approved for an<br />

item, the name <strong>of</strong> the firm is added to the list <strong>of</strong> existing approved sources in Part II in<br />

green colour <strong>and</strong> also the date <strong>of</strong> approval indicated. Similarly the names <strong>of</strong> the firms<br />

are up-gradation/ down-gradation is also changed with a distinct colour coding along<br />

with date <strong>of</strong> change. By introduction <strong>of</strong> the system improvement, not only the field units<br />

aware <strong>of</strong> the change in vendor directory promptly but also can easily identify changes<br />

through colour contrast. Presently this format <strong>of</strong> Vendor directory is on trial.


4. Introduction <strong>of</strong> hologram for Product Identification<br />

To facilitate identification <strong>of</strong> inspected product, a full pro<strong>of</strong><br />

system has been introduced. A small (15mm X 15mm) size Golden<br />

glare Hologram having unique numbering system, security code at two<br />

locations, a Government <strong>of</strong> India emblem <strong>and</strong> RDSO letters on it has<br />

been developed which shall facilitate users to identify all the individual items inspected<br />

by QA(Mech) Dte. In case <strong>of</strong> small items it is pasted on packet. Hologram shall also<br />

prevent any mixing up <strong>of</strong> material at vendors’ premises. The holograms shall facilitate<br />

traceability <strong>of</strong> the details <strong>of</strong> inspected materials, as all the holograms are individually<br />

numbered.<br />

5. Online vendor <strong>registration</strong>:<br />

To bring in total transparency in vendor <strong>registration</strong> at RDSO, a system <strong>of</strong><br />

‘online vendor <strong>registration</strong>’ has been successfully implemented. The system includes<br />

online payment through RTGS. To facilitate ‘online <strong>registration</strong>’ all the drawings,<br />

specifications & STRs are uploaded on website & are available after payment <strong>of</strong><br />

charges through RTGS. Besides online <strong>registration</strong> monitoring <strong>of</strong> vendor approval<br />

status is also available online. System shall facilitate submission <strong>of</strong> documents,<br />

clarification etc resulting in faster communication.<br />

6. Vendor Feedback/ Complaints:<br />

To facilitate the vendors to submit their feedback & also submit complaints/<br />

clarifications, online provision has been made on ( www.<strong>rdso</strong>.indianrailways.gov.in)<br />

website. At the back end system has been introduced to address the querries/<br />

clarifications by concerned Dtes.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!