THE EXHAUST SYSTEM AT THE GOTTHARD BASE TUNNEL (1)<br />

Two s<strong>in</strong>gle-track tunnels,<br />

length 57 km<br />

2 multifunction stations<br />

4 emergency stations<br />

2 ventilation stations<br />

(Faido, Sedrun)<br />

8 fans, of which 4 <strong>smoke</strong><br />

exhaust fans with flow<br />

rate of 250 m 3 /s<br />

Installed <strong>mechanical</strong><br />

power up to 2500 kW<br />

Lengt of <strong>smoke</strong> exhaust<br />

plenums: 2150 – 4340 m<br />

Mechanical <strong>smoke</strong> <strong>extraction</strong> <strong>for</strong> <strong>large</strong> <strong>fire</strong> <strong>loads</strong> <strong>in</strong> <strong>the</strong> Gotthard Base Tunnel<br />

23.-25.April 2012<br />

3