09.08.2013 Views

MYRIADE and MYRIADE Evolutions Programs - Cnes

MYRIADE and MYRIADE Evolutions Programs - Cnes

MYRIADE and MYRIADE Evolutions Programs - Cnes

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

4S Symposium, Portoroz, June 2012 : Myriade <strong>Evolutions</strong><br />

4S Symposium,<br />

Portoroz, Slovenia<br />

June 2012<br />

<strong>MYRIADE</strong> <strong>and</strong><br />

<strong>MYRIADE</strong> <strong>Evolutions</strong><br />

<strong>Programs</strong><br />

Paul Rodrigues,<br />

4th June 2012<br />

CNES<br />

DCT/PO/FS


SUMMARY<br />

4S Symposium, Portoroz, June 2012 : Myriade <strong>Evolutions</strong><br />

SUMMARY<br />

1. <strong>MYRIADE</strong> 1st generation<br />

2. <strong>MYRIADE</strong> <strong>Evolutions</strong>


Launch mass : 130 kg launch mass<br />

3<br />

4S Symposium, Portoroz, June 2012 : Myriade <strong>Evolutions</strong><br />

<strong>MYRIADE</strong> 1 st generation :<br />

Main Characteristics<br />

Compatibility with : ARIANE 5, Soyuz, Dniepr, PSLV, …<br />

50 kg - 60 W offered to payload ( 13h LTAN )<br />

Plateforme : 60 cm x 60 cm x 60 cm, 65 Kg<br />

Compatibilty with GTO <strong>and</strong> Sun Synchronous orbits (all LTAN)<br />

Providing high performances for this class of satellites :<br />

Star Tracker <strong>and</strong> gyrometers : 0,02 degres precision pointing<br />

Mission data management :<br />

Up to 32 Gbits storage capacity,<br />

16 to 60 Mbps using X b<strong>and</strong> transmisssion<br />

One axis drive mechanism for Solar Array<br />

In orbit lifetime : 3 years specified (> 6 ans in fact)<br />

Normalized interfaces between platform <strong>and</strong> payload :<br />

Mechanical, electrical, comm<strong>and</strong> <strong>and</strong> control<br />

Minimize efforts ifor mission development<br />

A stabilized industrial organisation :<br />

Parternish agreement with Thales Alenia Space <strong>and</strong> Astrium<br />

Long Term Agreements with equipement providers<br />

TARANIS views


4<br />

Same board to ground interface<br />

Same network of small S B<strong>and</strong><br />

earth terminals (TTCET): ICONES<br />

Same ground control center<br />

Normalized interfaces between<br />

control center <strong>and</strong> mission center<br />

“working hours” operations<br />

4S Symposium, Portoroz, June 2012 : Myriade <strong>Evolutions</strong><br />

<strong>MYRIADE</strong> 1 st generation :<br />

Myriade : a platform st<strong>and</strong>ard but also a system concept<br />

St<strong>and</strong>ardized satellite simulator for system validation. Capability to add payload simulatio<br />

System interfaces st<strong>and</strong>ard shared with Proteus product lines (5 Mini satellites)


5<br />

DEMETER<br />

PARASOL<br />

ESSAIM<br />

ELISA<br />

<strong>MYRIADE</strong> 1 st Generation : 15 years history<br />

2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020<br />

DEMETER<br />

ESSAIM (4 satellites)<br />

PARASOL<br />

SPIRALE SPIRALE (2 satellites)<br />

PICARD<br />

ALSAT 2A<br />

ALSAT 2B<br />

SSOT<br />

VNRedSAT<br />

TARANIS<br />

MicroScope<br />

MERLIN<br />

Scientific Missions<br />

French Defence Mission<br />

Industrial Exports<br />

<br />

5 Myriade Satellites<br />

launched with Helios 1B<br />

( ARIANE 5)<br />

4S Symposium, Portoroz, June 2012 : Myriade <strong>Evolutions</strong><br />

PICARD<br />

ALSAT 2A<br />

PORTOROZ - 4S<br />

ELISA (4 satellites)<br />

SSOT<br />

VNRedSAT<br />

TARANIS<br />

MicroScope<br />

5 Myriade Satellites<br />

launched with Pleiade 1A<br />

( Soyuz Kourou)<br />

ALSAT 2B<br />

MERLIN : 1st MYRADE<br />

EVOLUTION MISSION ----><br />

end 2021


6<br />

<strong>MYRIADE</strong> <strong>Evolutions</strong> : the new generation<br />

Why a new generation :<br />

To deal with obsolescence problems for equipement units designed 10 years ago<br />

Optimize the design for new lanchers offer ( Soyuz ASAP internal <strong>and</strong> external<br />

position, VEGA, <strong>and</strong> end of AR5 auxiliary position offer for LEO )<br />

To deal with French Law for Space Operations (Space Debris Mitigation) <strong>and</strong><br />

European REACH regulation<br />

Propose a st<strong>and</strong>ard platform solution for upcoming mission requiring more on<br />

board resources:<br />

Earth Monitoring : Merlin (Methane measurement), MicroCarb (CO2 measurement)<br />

Earth Observation<br />

Space an Sun observation (from LEO)<br />

Defence<br />

Comply with ISIS st<strong>and</strong>ard (Ground to Sat IF) applicable for new CNES missions :<br />

Packet Utilization St<strong>and</strong>ard from ECSS<br />

« Private » services for guidance, autonomy<br />

Share common Comm<strong>and</strong> <strong>and</strong> Control Center<br />

Share common S <strong>and</strong> X b<strong>and</strong> ground station network<br />

4S Symposium, Portoroz, June 2012 : Myriade <strong>Evolutions</strong>


7<br />

PayloadMeanPower (W)<br />

180<br />

160<br />

140<br />

120<br />

100<br />

80<br />

60<br />

40<br />

20<br />

0<br />

Typical Payload Mass <strong>and</strong> Power Needs<br />

4S Symposium, Portoroz, June 2012 : Myriade <strong>Evolutions</strong><br />

<strong>MYRIADE</strong> Payloads Mass / Mean Power Domain<br />

TOPASE<br />

CLOUDICE<br />

0 20 40 60 80 100 120 140<br />

Payload Mass (kg)<br />

MERLIN 6h<br />

<strong>MYRIADE</strong> Ev<br />

ASAP max<br />

MERLIN 6h max?<br />

PICARD 6h<br />

HYPXSIM TARANIS<br />

<strong>MYRIADE</strong><br />

PICARD 6h<br />

HYPXSIM TARANIS<br />

<strong>MYRIADE</strong><br />

MICROCARB<br />

Initial Max<br />

HYPEX Obs Terre NG<br />

MISTIGRI<br />

PARASOL<br />

ELISA<br />

TYREX<br />

PF TARANIS<br />

PARASOL<br />

ELISA<br />

TYREX<br />

PF TARANIS<br />

Capa<br />

ESSAIM<br />

Réactive PF PICARD PF <strong>MYRIADE</strong><br />

ALSAT -SSOT<br />

DEMETER<br />

Initiale<br />

<strong>MYRIADE</strong> Ev<br />

autre lanceur max<br />

PF <strong>MYRIADE</strong><br />

<strong>Evolutions</strong>


8<br />

<strong>MYRIADE</strong> <strong>Evolutions</strong> : main requirements<br />

General Requirements :<br />

Orbits : 500 to 800 kms, Inclination > 45 degres<br />

In orbit Lifetime : 5 to 7 years<br />

Reliability > 0,6 at 5 years with full performances<br />

Availabity > 0,9<br />

Agility : 0,5 deg /sec<br />

Services to payload <strong>and</strong> mission (typical values):<br />

Mass :<br />

Data Storage : > 512 Gbits,<br />

70 Kg to 120 kg depending on launcher<br />

160 Mbit/sec input<br />

• Power (orbital mean value) :<br />

100 W at 12h LTAN,<br />

130 W at 6h LTAN<br />

Volume :<br />

Plate : 600mm x 800mm<br />

High : 420 mm ( Soyuz external ) or<br />

820 mm ( Soyuz internal )<br />

4S Symposium, Portoroz, June 2012 : Myriade <strong>Evolutions</strong><br />

Data downlink : 180 Mbits/sec BER 10 -9<br />

Geo-Localization: 100 to 200 m (3σ)<br />

Datation : 6 µs


Avionics :<br />

9<br />

<strong>MYRIADE</strong> <strong>Evolutions</strong> : Platform Main Technical Characteristics<br />

CPU Board based specific ASIC including T805<br />

Tank :7 Kg to 10 Kg hydrazine, 22 to 5 bars<br />

instruction set, floating point unit, TM/TC functions,<br />

4 x 1 Newton thursters, Isp # 210 sec<br />

Processor Interface Controlers for I/O with platform<br />

Hydrazine baselined but possible change to LMP103S<br />

equipement units<br />

depending on REACH decision <strong>and</strong> performances<br />

Oslink, RS422, 1553B, Spacewire for Interfaces<br />

De presurisation system for end of life<br />

with payload<br />

Attitude <strong>and</strong> Orbit Control :<br />

Up to 4 Mass Memory Modules : 4 x 512 Gbits<br />

Star Tracker : 1 or 2 Optical Heads,<br />

TC Authentication based on CCSDS st<strong>and</strong>ard<br />

Gyrostellar or gyroless possible configurations,<br />

4 reaction wheels (1 Nms) in tetrahedral configuration<br />

1,3 m2 Solar Array, XTJ solar cells<br />

GPS in the guidance loop<br />

Solar Array Drive méchanism : up to 13 A<br />

Radiofrequency :CCSDS compliant<br />

Battery :700 Wh (BOL)<br />

S B<strong>and</strong> : TM 625 Kbits/s,QPSK, Reed Solomon<br />

Decentralized heaters management (BRIO System)<br />

TC 32 Kbits/s biphase PCM/PM<br />

Electrical isolation of battery at end of life<br />

2 Omni directional antenna<br />

B<strong>and</strong>e X Telemetry : 180 Mbits/s, OQPSK, RS<br />

On going development with Arianespace <strong>and</strong> RUAG<br />

Possible 2 x 180 Mbits/s by cross polarisation<br />

(Sweden) : Φ 610 mm, for up to 300 Kg satellite<br />

Link budgets with 5dB margins for S+X 5,4 m ground<br />

stations<br />

Power :<br />

Launcher Interface Ring:<br />

4S Symposium, Portoroz, June 2012 : Myriade <strong>Evolutions</strong><br />

Propulsion :


S B<strong>and</strong>Rx/Tx<br />

OBC<br />

PCDU)<br />

10<br />

X<br />

Z<br />

Y<br />

Mass<br />

Memory<br />

Star Tracker<br />

4S Symposium, Portoroz, June 2012 : Myriade <strong>Evolutions</strong><br />

<strong>MYRIADE</strong> <strong>Evolutions</strong> : general layout<br />

X B<strong>and</strong> Tx GNSS Rx<br />

Magnetorquer<br />

Reaction<br />

Wheels<br />

Propulsion.<br />

Battery<br />

Gyrometer<br />

Payload<br />

View under fairing Soyuz<br />

ASAP external position<br />

Solar<br />

Array<br />

10


11<br />

4S Symposium, Portoroz, June 2012 : Myriade <strong>Evolutions</strong><br />

<strong>MYRIADE</strong> <strong>Evolutions</strong> : planning<br />

2011 2012 2013 2014 2015<br />

Phase A<br />

Phase B<br />

PORTOROZ - 4S<br />

Equipement Selection :<br />

Phase C/D<br />

• Invitation to Tender published 3rd quarter 2012<br />

• Request for Proposal : 4th quarter 2012<br />

Flight Models delivery<br />

Merlin P/F AIT<br />

2016 2017<br />

Merlin PF+<br />

P/L AIT

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!