Eagle_Plain_matting_..
Eagle_Plain_matting_..
Eagle_Plain_matting_..
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
preparation of simulated ice‐road conditions. One of the two test‐mat sites was prepared to<br />
simulate ice‐road conditions by adding water to the snow pack. Water was sourced from the<br />
<strong>Eagle</strong> River and delivered by a water truck contracted from <strong>Eagle</strong> <strong>Plain</strong>s Lodge. Kryotech Arctic<br />
Innovations (KAI) was retained by NCY to hand‐drill boreholes for thermistor cable installation.<br />
KAI also installed EBA‐manufactured thermistor cables and NCY’s button type (i‐Button)<br />
thermistors to monitor ground temperature at tubing‐lined borehole locations at the test site.<br />
EBA thermistor cables, data loggers and switch boxes are capable of providing readings without<br />
recovery from the boreholes, so they were installed to collect ground temperature data from<br />
the cable monitoring sites located directly beneath the access mats. The i‐button strings must<br />
be directly accessed individually to be read, so they were installed as controls and to monitor<br />
temperature “edge‐effects” adjacent to each mat.<br />
7