13.08.2013 Views

Okatmos® star 110 - Polyflor

Okatmos® star 110 - Polyflor

Okatmos® star 110 - Polyflor

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Okatmos®</strong> <strong>star</strong> <strong>110</strong><br />

Technical Data Sheet<br />

Okatmos ® <strong>star</strong> <strong>110</strong><br />

Wet-bed adhesive<br />

. fibre-reinforced<br />

. short intitial tack<br />

. excellent coverage rate<br />

. easy to spread<br />

. anti-microbial<br />

P R O P E R T I E S A N D U S A G E<br />

Solvent-free, very low emission, fibre-reinforced wet-bed dispersion adhesive for adhering rubber floor coverings<br />

of up to 4.0mm thickness in sheet and tile format, designer coverings in plank and tile format and for<br />

homogeneous/heterogeneous PVC floor coverings. The addition of reinforcing fibres minimises adhesive<br />

squeeze during installation and residual indentation in installed flooring.<br />

Thanks to its anti-microbial properties, <strong>Okatmos®</strong> <strong>star</strong> <strong>110</strong> also helps to prevent VOC odours.<br />

S U B S T R A T E P R E P A R A T I O N<br />

The substrate must be inspected in accordance with the current relative installation standard and be ready for<br />

installation. Substrates should be free of all surface contaminates and should not exceed 75% RH on an<br />

electrical hygrometer using in-situ probes. If the substrate surface is outside of the acceptable smoothness<br />

and planeness standards, an appropriate Kiesel primer and levelling compound should be used to rectify.<br />

If only minimal substrate preparation is required, it is recommended to first prime the substrate with Kiesel<br />

EG20 primer diluted 1:2 ratio with water and applied using a soft broom. Ensuring to broom out any puddling<br />

or pooling, once the EG20 is dry and not tacky (approx 30mins) it is ready to install over. Priming the surface<br />

of the substrate will ensure an even initial tack time giving an optimum wet transfer of adhesive to the covering.<br />

P R O C E S S I N G<br />

Stir <strong>Okatmos®</strong> <strong>star</strong> <strong>110</strong> well before use. Apply the adhesive to the substrate using the toothed strip attached<br />

to the lid. Only apply as much to the surface as can be covered within the stated laying time. The toothed<br />

strip should be replaced in good time (approx. every 15-20m²) before gaps appear between the fibres and to<br />

ensure that the correct amount of adhesive is applied at all times. After the initial tack time (depending on the<br />

internal climate conditions), lay the floor covering in the adhesive bed while still wet, being careful not to<br />

trap any air, and rub on carefully. After approximately 30 minutes, rub or roll over the covering again. Ensure<br />

that the rear side of the covering is sufficiently wet. The floor covering must be tension-free and lie flat.<br />

Weigh down if necessary. Avoid bulging in the area of seams and upwardly projecting building components.<br />

Wait at least 24 hours before sealing joints or welding seams in the floor covering. The laying instructions of<br />

the manufacturer of the floor covering are to be heeded at all times.<br />

Kiesel Bauchemie GmbH u. Co. KG<br />

Wolf-Hirth-Stra3e 2 D-73730 Esslingen<br />

Telefon: 0711 93134-0<br />

Telefax: 0711 93134-140<br />

www.kiesel.com<br />

Niederlassung:<br />

Otto-Kiesel-Stra3e<br />

D-39590 Tangermünde<br />

Telefon: 039322 95-0<br />

Telefax: 039322 95-100<br />

Geschäftsführer:<br />

Wolfgang Kiesel<br />

Dr. Matthias Hirsch<br />

Pers. haft. Gesellschafterin:<br />

Kiesel Verwaltungsges. mbH<br />

Amtsgericht<br />

Stuttgart HRB 210484<br />

Sitz der Gesellschaft:<br />

73730 Esslingen<br />

Amtsgericht<br />

Stuttgart HRA 210806


<strong>Okatmos®</strong> <strong>star</strong> <strong>110</strong>- Page 2 of 2<br />

S P E C I F I C A T I O N S<br />

Color Cream white<br />

Application Interior floors<br />

Suitable for chair castors<br />

(DIN EN 12 529)<br />

Suitable<br />

Minimum floor temperature + 10°C (substrate)<br />

Initial tack time* Approx. 5-10 minutes<br />

Processing time* Approx. 20 minutes<br />

Ready for foot traffic* After approx. 24 hours<br />

Final strength* After approx. 72 hours<br />

Floor heating systems Suitable<br />

Marked according to<br />

GefStoffV regulations<br />

Not classified<br />

GISCODE D 1 acc. To TRGS 610<br />

EMICODE EC (GEV)<br />

Shelf live store in frost protected area for up to 12 months<br />

* At +20°C und 65 % relative humidity<br />

Higher temperatures and lower humidity decreases, lower temperature and high humidity increase this<br />

value respectively.<br />

T O O L S A N D C O V E R A G E<br />

Tooth type Type of floor covering Consumption<br />

TKB A2 Rubber floor coverings of 2-4mm 250-280g/m² approx.<br />

thickness in lengths and tiles with<br />

polished rear side<br />

TKB A2 Designer coverings in plank and 250-280g/m² approx.<br />

tile format<br />

TKB A2 homogeneous/heterogeneous 250-280g/m² approx.<br />

C L E A N I N G<br />

Clean tools with water immediately after usage.<br />

P A C K A G I N G<br />

Packaging Product Code<br />

33 x 14 kg plastic buckets 49065<br />

The information is based on out experience and is to be regarded as general instructions. We cannot guarantee<br />

successful results since we do not have any influence on the conditions at the construction site and the proper<br />

processing. In any case a sample application is recommened before the installation.<br />

This data sheet replaces any previously issued data sheet.<br />

23.10.10 Wbg.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!