13.08.2013 Views

Soil Inventory and Assessment Project: The EEA ... - CLU-IN

Soil Inventory and Assessment Project: The EEA ... - CLU-IN

Soil Inventory and Assessment Project: The EEA ... - CLU-IN

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

2004: PRA.MS I methodology<br />

PRA.MS I (Preliminary Risk <strong>Assessment</strong> Model for the<br />

identification of problem areas for <strong>Soil</strong> contamination in Europe)<br />

methodology: a risk scoring system for the classification <strong>and</strong><br />

assessment of individual sites. <strong>The</strong> system includes 3 Tiers to be<br />

applied to data of different detail.<br />

• Objectives:<br />

– Identify, classify <strong>and</strong> assess problem areas of EU concern<br />

• Background:<br />

– “Review <strong>and</strong> analysis of existing methodologies for preliminary risk<br />

assessment” <strong>and</strong> harmonization of input parameters.<br />

– data available at the EU level, such as:<br />

• the BRGM/DECHM<strong>IN</strong>UE <strong>and</strong> EPER databases<br />

• Geo-referenced environmental data<br />

10 European Environment Agency

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!