13.08.2013 Views

prevention and control of spontaneous combustion - Mining and

prevention and control of spontaneous combustion - Mining and

prevention and control of spontaneous combustion - Mining and

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

DATE: ........................................................................<br />

iMpunzi Division<br />

ATCOM<br />

DRILL & BLAST SECTION<br />

BLASTING COST (FOR SURVEY DEPT.)<br />

43<br />

TABLE 4<br />

SOURCE<br />

EXPLOSIVES<br />

COAL VOTE No BASE BUDGET BLOCK LINEAR WIDTH HOLES TONES SEAM SUPPLIER AECI<br />

COST LENTH<br />

A106 R0.37 TYPE<br />

DENSITY<br />

ORDER No<br />

PARTING VOTE No BASE BUDGET BLOCK LINEAR WIDTH HOLES BCM<br />

COST LENTH KG EXPLOSIVES<br />

A105 R1.40 KG / HOLES<br />

P.F.<br />

KG TON COAL<br />

PRE-SPLIT VOTE No BASE BUDGET BLOCK LINEAR WIDTH HOLES M 2 EXPL. COST<br />

COST LENTH ACCESS. COST<br />

A107 R2.53 TOTAL COST<br />

COST / UNIT<br />

OVERBURDEN VOTE No BASE BUDGET BLOCK LINEAR WIDTH HOLES BCM<br />

MIDBURDEN COST LENTH<br />

A104 R0.85

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!