•<br />
Mileage stakeout: setover of ‘0’<br />
means current position is on the<br />
center line of the railway. Go forward<br />
or back along the center line, when<br />
the mileage shows the same as the<br />
calculated mileage of the pile, current<br />
position is the right position.<br />
Survey profi le: along the center line of<br />
railway, survey the topographic points<br />
(such as ridge, wire, and canal).<br />
Using RTK system<br />
in this process<br />
The design of railway is quite simple and<br />
fast. Railway-design software is quite<br />
advanced when designing a railway. For<br />
example to design a 40km long railway<br />
line, we only need the coordinates of<br />
intersection, distance between points<br />
of intersection, easement curve length,<br />
circular curve length and pile mileage. The<br />
main work is to arrange these elements<br />
in certain order and build a road fi le,<br />
and could be fi nished in 2 minutes.<br />
30 | <strong>Coordinates</strong> October 2009<br />
User-defi ned feature function. The function<br />
of user-defi ned features makes the inside<br />
and outside work much simpler. When<br />
surveying the profi le, if there is some<br />
topography point (such as the scarp), one<br />
needs to record the name and attributes of<br />
this point in a notebook, and then input this<br />
points details into the computer once back<br />
in the offi ce. But, with Railway-design<br />
software, the engineer can input attributes<br />
directly in the fi eld and save time.<br />
Transect<br />
Transect refl ects the topography<br />
situation on both sides of the railway.<br />
After confi rming the position of<br />
a pile, measure the topographic<br />
points along the transect direction<br />
to record the transect condition.<br />
There are many advantages of using RTK.<br />
Graphic is intuitionistic: when<br />
measuring transect, the departure<br />
distance from midline can be seen<br />
directly in the controller. It is more<br />
accurate than traditional visual method.<br />
Auto name: when measuring the<br />
profi le, the system names the fi rst point<br />
as d1, the second point as d2, etc.<br />
Add point: If the designed pile is<br />
on a bridge, transect of this pile<br />
cannot be measured. In this situation,<br />
‘Add point’ function is used. Add<br />
pile before or behind this pile, and<br />
measure transect of added pile.<br />
To improve working effi ciency and reduce<br />
measurement mistakes caused by operation<br />
misplay, a lot of work can be done indoors:<br />
like making fi le for site calibration, making<br />
line fi le, making stakeout fi le, etc.<br />
RTK is applied in the railway industry<br />
quite early. It is widely used in the<br />
design and other aspects of railway<br />
construction. With the use of RTK GPS<br />
system, the working effi ciency of railway<br />
construction is signifi cantly improved.