of expansion bolls between face plates<br />

and the eXisting concrete structure was<br />

devised As with the design of the strucetural<br />

steel elements. careful analysIs determined<br />

the level 01 shear and tenSion In<br />

each boll The size and required embedment<br />

length of each boll IS specilled accordingly<br />

With discrete connection pOints at each<br />

eXlsllng exterior column, minimal demolition<br />

work IS reqUIted at the eXlstmg exterior<br />

wall The erection sequence calls for all<br />

the column collars to be Installed prior to<br />

erection of trussed brackets and lloor<br />

beams There IS mlnlmat disruption to the<br />

eXisting structure With thiS concept, Since<br />

all of the major steel elements are externally<br />

applied to the bUilding After the<br />

structural steel was Installed and the new<br />

space In place. the old exterior wall was<br />

removed and the deSired enlargement of<br />

the eXisting lloor space created<br />

As previously mentioned, one of the<br />

chief advantages of the trussed scheme<br />

over the roof cantilever scheme IS that the<br />

load transfer path IS more direct New lloor<br />

and roof loads are channeled Into the ex­<br />

Isting columns at their correspendlng levels<br />

(or lower) so that the eXisting columns<br />

resist decreaSing loads as they ascend.<br />

Each column and fOOling In the eXisting<br />

structure affected by the new construction<br />

has adequate reserve strength to safely<br />

suppert Ihe new loads Siruciural steel<br />

construction was the only solution-Since<br />

light weight, durablhty, erectablhty and<br />

economy were essenllals for thiS project<br />

Conclusion<br />

The Stoneman BUilding Includes medlcall<br />

surgical and obstetrlcat nursing umts, diagnostic<br />

cardiology, clinical neurophYSIology<br />

and dialYSIS Total cost lor these renovations<br />

and new construction IS<br />

$13,635,000 Bedrooms deSigned to resembte<br />

the new ones In the Reisman Build­<br />

Ing Will be generated by Stoneman's lateral<br />

expansion The lateral expansion<br />

becomes the locus for the new pallent tOIlet<br />

rooms, a loungel sllllng area for VIsitors<br />

and a generous expansive Window open­<br />

Ing affording a view over Boston's Fenway<br />

Park. Pallents In each room Will lace oakpanelled<br />

walls With Integrated ward robes,<br />

balanced by strongly organized color sclutlons<br />

lor repese The room IS deSigned<br />

to increase the patient's feeling of wellbeing<br />

at Boston's Beth Israel Hospital<br />

the first hospital to create a Patient Bill of<br />

Rights.<br />

As a result 01 the combined new addition<br />

and total renovallon, Ihe Stoneman pallent<br />

care uOlis are brought up to the standards<br />

of Ihe new Reisman BUilding, and Will pro­<br />

Vide patlenls Ihe same Inllmale quality and<br />

Intenor enVIronment The solution also extends<br />

the life span of the eXisting bUilding<br />

Into one equal to that of the bUlldmg recently<br />

constructed The architect and<br />

structural engineering team have once<br />

again shOwn Ihat structural steel construction<br />

prOVided the best pesslble solution to<br />

a complicated expanSion problem al a<br />

large medical center 0<br />

Architect<br />

Martha L Rothman-Elliot Paul Rothman Inc<br />

BoSlon. Massachusetts<br />

Structural Engineer<br />

Souza, True and Partners<br />

Watertown , Massachusetts<br />

<strong>Construction</strong> Manager<br />

Jackson <strong>Construction</strong> Company<br />

Dedham. Massachusetts<br />

Steet Erector<br />

Daniel Marr & Son Company<br />

Boston. Massachusetts<br />

Owner<br />

Bem Israel Hospnat<br />

Boston. Massachusetts<br />

STRUCTURAL ENGINEERS:<br />

TAKE US FOR A TEST RUN<br />

Structural AnalySIS Inc" has now completely eliminated "hope & pray" bUYing of computer software. Through the use<br />

of a speCial diskette -we can now offer a limited number of runs of our actual programs (not demo disks) for your<br />

complete evaluation at a low nominal fee ,<br />

,< <strong>Steel</strong> Frame Analysis & DeSign<br />

,< <strong>Steel</strong> Beam AnalYSIS & DeSign<br />

,:- <strong>Steel</strong> Cotumn AnalYSIS & Design<br />

-:< Frame Shearwall Interaction Analysis<br />

{< Complex <strong>Steel</strong> Plane Frame AnalYSIS<br />

-::- Extended <strong>Steel</strong> Column DeSign<br />

Please write for more information and product<br />

literature,<br />

I I<br />

1st Ouanar 1985<br />

STRUCTURAL<br />

ANAL VSIS, INC.<br />

{< <strong>Steel</strong> Pipe Column AnalYSIS & DeSign<br />

-:< <strong>Steel</strong> Tube Column AnalYSIS & DeSign<br />

-:< Composite 8eam Anatysls & DeSign<br />

{< <strong>Steel</strong> Truss AnalYSIS & DeSign<br />

{:- Modified React ion File<br />

3D S E Seventh St , SUite 02, Dept M2<br />

Boca Raton, Fta, • 33432<br />

23