ON GOING SCHEMES AS ON 1.4.2011-12 UNDER <strong>MNP</strong><br />

Sl. Name of scheme Name of Type of Name of habitation Status of Date of Estimat Population<br />

Commulati Over all Balance Amount<br />

` in lakhs<br />

Date of Delay Reason for delay Remarks<br />

No<br />

Block scheme under the scheme habitation section in ed cost Present Ultimate ve exp. physical fund req.. req. Original Revised in yrs.<br />

funded under<br />

as on (dd-mm-<br />

Incurred up progress in for during envisag<br />

RIDF<br />

1.4.10 as yyyy )<br />

to 31.3.11 % completio 2011-12 ed<br />

per Data<br />

n<br />

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19<br />

<strong>MNP</strong><br />

1 Lumshken<br />

Khliehriat Pumping 1. Lumshken 100% 31.3.05 47.37 979 1372 41.46 100% 5.91 5.91 31.3.09 31.3.12 3 yrs Delay in providing<br />

Wahsarang comb.<br />

power supply by<br />

w.s.s<br />

MeECL<br />

2. Wahsarang 100%<br />

2 Iapmala w.s.s Khliehriat Pumping Iapmala 100% 31.3.05 39.42 728 1028 34.06 100% 5.36 5.36 31.3.09 31.3.12 3 yrs Delay in providing<br />

power supply by<br />

MeECL<br />

3 Iongkaluh w.s.s Khliehriat Dug Well Iongkaluh 100% 26.3.09 7.59 1808 2056 5.57 85% 2.02 2.02 31.3.11 31.3.12 1 yr Source dispute<br />

4 Padu comb. w.s.s Amlarem Pumping 1. Padu Pohklor<br />

2. Padu Mawjyllong<br />

0-25% 17.8.06 64.17 1849 1869 48.4 90% 15.77 15.77 31.3.10 31.3.12 2 yrs Delay in providing<br />

power supply by<br />

MeECL<br />

5 Kyndongtuber w.s.s Thadlaskein Pumping<br />

3. PaduBah<br />

Kyndongtuber 100% 9.2.07 221.9 4172 5841 212.09 100% 9.81 9.81 31.3.10 31.3.12 2 yrs Delay in providing<br />

power supply by<br />

MeECL<br />

6 Aug. of Umkiang w.s.s Khliehriat Gravity Umkiang 100% 31.3.08 227.31 4458 6241 208 100% 19.31 19.31 31.3.12<br />

7 Impl. Of Muthlongrim<br />

comb. w.s.s<br />

Funded under<br />

RIDF XVI<br />

Funded under<br />

RIDF XVI<br />

Thadlaskein Pumping 1. Muthlongrim 75-100% 31.3.08 479.9 8000 11200 342.96 80% 136.94 136.94 31.3.12 Funder under<br />

RIDF XVI<br />

2. Thadmuthlong 100%<br />

3. Thadmuthlong B 25-50%<br />

4. Thadmuthlong C 25-50%


ANNEXURE - VI<br />

ON GOING SCHEMES AS ON 1.4.2011-12 UNDER <strong>MNP</strong><br />

Sl. Name of scheme Name of Type of Name of habitation Status of Date of Estimat Population Commulati Over all Balance Amount<br />

` in lakhs<br />

Date of Delay Reason for delay Remarks<br />

No<br />

Block scheme under the scheme habitation section in ed cost Present Ultimate ve exp. physical fund req.. req. Original Revised in yrs.<br />

funded under<br />

as on (dd-mm-<br />

Incurred up progress in for during envisag<br />

RIDF<br />

1.4.10 as yyyy )<br />

to 31.3.11 % completio 2011-12 ed<br />

per Data<br />

n<br />

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19<br />

<strong>MNP</strong><br />

8 Impl. Of Jalaphet<br />

comb. w.s.s<br />

9 Impl. Of Greater<br />

Nartiang comb. w.s.s<br />

10 Impl. Of Moolian<br />

w.s.s<br />

Saipung Gravity 1. Jalaphet Bri<br />

Sumer<br />

2. Jalaphet Bri<br />

Sutnga<br />

100%<br />

Thadlaskein Pumping 1. Nartiang 25-50% No.PHE/16<br />

7/2008/20<br />

dt. 8.2.09<br />

2. Kper Mynsnieh 25-50%<br />

3. Moodop 25-50%<br />

Saipung Gravity Moolian 25-50% No.PHE/31<br />

9/2008/13<br />

dt. 18.2.09<br />

100% 4.11.08 293.63 4761 5426 281.22 100% 12.41 12.41 31.3.12 Funder under<br />

RIDF XVI<br />

524.82 6536 9150 258.07 40% 266.75 266.75 31.3.12 Funder under<br />

RIDF XVI<br />

36.52 475 665 18.08 55% 18.44 18.44 31.3.12 Funder under<br />

RIDF XVI<br />

11 Impl. Of Mookaiaw 'B' Laskein Pumping 1. Mookaiaw B 100% 18.2.09 225.74 2842 3979 138.01 80% 87.73 87.73 31.3.12 Funder under<br />

RIDF XVI<br />

12 Impl. Of Iongkasaroo<br />

w.s.s<br />

Laskein Pumping<br />

2. Mookaiaw<br />

1. Iongkasaroo 0-25% 4.2.09 87.9 1226 1717 45.84 80% 42.06 42.06 31.3.12 Funder under<br />

RIDF XVI<br />

13 Impl. Of Amlarem Amlarem Gravity<br />

2. Thangthring<br />

3. Bamksaw<br />

Amlarem 100% No.PHE/17<br />

9/5/2008/<br />

28 dt.<br />

27.3.09<br />

115.13 1194 1672 73.98 15% 41.15 41.15 31.3.12


ANNEXURE - VI<br />

ON GOING SCHEMES AS ON 1.4.2011-12 UNDER <strong>MNP</strong><br />

Sl. Name of scheme Name of Type of Name of habitation Status of Date of Estimat Population Commulati Over all Balance Amount<br />

` in lakhs<br />

Date of Delay Reason for delay Remarks<br />

No<br />

Block scheme under the scheme habitation section in ed cost Present Ultimate ve exp. physical fund req.. req. Original Revised in yrs.<br />

funded under<br />

as on (dd-mm-<br />

Incurred up progress in for during envisag<br />

RIDF<br />

1.4.10 as yyyy )<br />

to 31.3.11 % completio 2011-12 ed<br />

per Data<br />

n<br />

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19<br />

<strong>MNP</strong><br />

14 Impl. Of Moorapuchai<br />

w.s.s<br />

15 Impl. Of Umrasiang<br />

w.s.s<br />

16 Impl. Of Moopliang<br />

comb. w.s.s<br />

17 Impl. Of Khonshnong<br />

comb. w.s.s<br />

Thadlaskein Pumping 1. Ionglwit 25-50% 26.3.2009 170.11 2132 2985 93.68 80% 76.43 76.43 31.3.12 Funder under<br />

RIDF XVI<br />

Khliehriat Pumping<br />

2. Moorapuchai<br />

Umrasiang No.PHE/46<br />

5/2008/10<br />

dt. 26.3.09<br />

Thadlaskein Pumping 1. Moopliang 0-25% No.PHE/10<br />

6/2008/28<br />

Laskein Gravity<br />

2. Myrjai<br />

1. Biar 0-25% No.PHE/46<br />

6/2008/10<br />

dt. 26.3.09<br />

18 Impl. Of Saitual w.s.s Khliehriat Gravity<br />

2. Nongryngkoh<br />

3. Khonshnong<br />

4. Lakadong<br />

5. Chutwakhu<br />

6. Shetja hadem<br />

7. Madanrwai<br />

8. Mdan pohkseh<br />

Saitual 100% No.PHE/46<br />

8/2008/10<br />

dt. 27.3.09<br />

58.24 730 1022 15.59 85% 42.65 42.65 31.3.12<br />

146.08 2077 2908 45.38 50% 100.7 100.7 31.3.12 Funder under<br />

RIDF XVI<br />

240.13 3119 4367 208.08 80% 32.05 32.05 31.3.12 Funder under<br />

RIDF XVI<br />

46.58 685 959 40.62 100% 5.96 5.96 31.3.12 Funded under<br />

RIDF XVI


ANNEXURE - VI<br />

ON GOING SCHEMES AS ON 1.4.2011-12 UNDER <strong>MNP</strong><br />

Sl. Name of scheme Name of Type of Name of habitation Status of Date of Estimat Population Commulati Over all Balance Amount<br />

` in lakhs<br />

Date of Delay Reason for delay Remarks<br />

No<br />

Block scheme under the scheme habitation section in ed cost Present Ultimate ve exp. physical fund req.. req. Original Revised in yrs.<br />

funded under<br />

as on (dd-mm-<br />

Incurred up progress in for during envisag<br />

RIDF<br />

1.4.10 as yyyy )<br />

to 31.3.11 % completio 2011-12 ed<br />

per Data<br />

n<br />

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19<br />

<strong>MNP</strong><br />

19 Impl. Of Pammanik<br />

comb. w.s.s<br />

Thadlaskein Pumping 1. Pammanik 0-25% No.PHE/22<br />

0/2008/10<br />

dt. 31.3.09<br />

216.95 2853 3994 129.6 70% 87.35 87.35 31.3.12 Funded under<br />

RIDF XVI<br />

20 Aug. of Demthring<br />

w.s.s<br />

Thadlaskein Pumping<br />

2. Myntkhung<br />

3. Khlieh Umbuit<br />

Demthring 25-50% 17.9.09 68.83 1543 2160 54.21 100% 14.62 14.62 31.3.12<br />

21 Impl. Of Mynska w.s.s Laskein Gravity Mynska 25-50% 16.12.09 181.1 2385 3339 82.43 60% 98.67 98.67 31.3.12<br />

22 Imprvt. Of Umladkhur<br />

w.s.s<br />

Laskein Gravity Umladkhur 25-50% 28.1.10 15.07 2500 2510 11.13 100% 3.94 3.94 31.3.12 Funded under<br />

RIDF XVI<br />

23 Re-const of Kairang<br />

w.s.s<br />

Khliehriat Pumping 1. Kairang<br />

2. Nongthymme<br />

100% 24.2.10 14.45 559 783 6.15 100% 8.3 8.3 31.3.13<br />

24 Re-cont of<br />

Pdengkarong w.s.s<br />

Amlarem Gravity Pdengkarong 50-75% 23.2.10 26.67 0 0 16.03 100% 10.64 10.64 31.3.12<br />

25 Re-const of Jaliakhola Amlarem<br />

w.s.s<br />

Gravity Jaliakhola 25-50% 13.3.10 8.62 112 157 4.72 10% 3.9 3.9 31.3.12<br />

26 Impl. Of Latyrke Saipung DTW<br />

Pumping<br />

Latyrke 25-50% 31.3.10 84.53 1064 1490 18.33 45% 66.2 66.2 31.3.13<br />

27 Impl. Of Umstein Khliehriat Gravity Umstein 25-50% 31.3.10 35.73 620 868 14.62 45% 21.11 21.11 31.3.12 Funded under<br />

w.s.s<br />

RIDF XVI<br />

28 Khliehrangnah comb.<br />

w.s.s<br />

Laskein Pumping 1. Khliehrangnah 100% 15.3.11 260.29 3264 4570 0 0% 260.29 130.15 31.3.14<br />

2. Mynkrem


ANNEXURE - VI<br />

ON GOING SCHEMES AS ON 1.4.2011-12 UNDER <strong>MNP</strong><br />

Sl. Name of scheme Name of Type of Name of habitation Status of Date of Estimat Population Commulati Over all Balance Amount<br />

` in lakhs<br />

Date of Delay Reason for delay Remarks<br />

No<br />

Block scheme under the scheme habitation section in ed cost Present Ultimate ve exp. physical fund req.. req. Original Revised in yrs.<br />

funded under<br />

as on (dd-mm-<br />

Incurred up progress in for during envisag<br />

RIDF<br />

1.4.10 as yyyy )<br />

to 31.3.11 % completio 2011-12 ed<br />

per Data<br />

n<br />

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19<br />

<strong>MNP</strong><br />

29 Sonapyrdi w.s.s Khliehriat Gravity Sonapyrdi 25-50% 15.3.11 31.57 458 641 0 0% 31.57 31.57 31.3.14<br />

30 Umlong w.s.s Khliehriat Gravity Umlong 100% 15.3.11 23.99 318 445 0 0% 23.99 23.99 31.3.14<br />

31 Tluh comb. w.s.s Saipung Gravity 1. Tluh 0% 17.3.11 393.83 3883 5436 0 0% 393.83 98.46 31.3.14<br />

2. Latyrke 25-50%<br />

3. Jarain 0%<br />

4. Lamyrsiang 0%<br />

5. Moolamylliang 0-25%<br />

32 Muknor w.s.s Saipung Gravity Muknor 25-50% 16.3.11 30.88 402 563 0 0% 30.88 30.88 31.3.14<br />

33 Musniang Jondeng<br />

w.s.s<br />

Khliehriat DTW Musniang Jondeng 50-75% 16.3.11 47.9 638 893 0 0% 47.9 47.9 31.3.14<br />

34 Providing Water<br />

Supply to Office of<br />

BDO Saipung<br />

Saipung Gravity 23.9.10 18.45 7.9 100% 10.55 10.55<br />

35 Impl. Of Padu<br />

Mawsku w.s.s<br />

Amlarem Dug Well Padu Mawsku 25-50% 4.2.09 4.62 543 761 0 100% 4.62 4.62<br />

Total 4496 68913 93067 2456.21 2039.81 1614.3<br />

Executive Engineer (PHE)<br />

RWS Division, <strong>Jowai</strong>