18.08.2013 Views

Questionnaire for Data Collection from States on Rural ... - pmgsy

Questionnaire for Data Collection from States on Rural ... - pmgsy

Questionnaire for Data Collection from States on Rural ... - pmgsy

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<str<strong>on</strong>g>Questi<strong>on</strong>naire</str<strong>on</strong>g> <str<strong>on</strong>g>for</str<strong>on</strong>g> <str<strong>on</strong>g>Data</str<strong>on</strong>g> <str<strong>on</strong>g>Collecti<strong>on</strong></str<strong>on</strong>g> <str<strong>on</strong>g>from</str<strong>on</strong>g> <str<strong>on</strong>g>States</str<strong>on</strong>g> <strong>on</strong> <strong>Rural</strong> Roads <str<strong>on</strong>g>for</str<strong>on</strong>g><br />

Preparing <strong>Rural</strong> Roads Plan – Visi<strong>on</strong> : 2025<br />

1. Agencies undertaking the work of c<strong>on</strong>structi<strong>on</strong> and maintenance of rural roads<br />

(i) Give the names of various agencies involved in:<br />

– C<strong>on</strong>structi<strong>on</strong><br />

– Maintenance<br />

(ii) Length of Other District roads (ODRs) and Village Roads (VRs) with<br />

each agency separately with type of surface BT, WBM Gravel Earth<br />

Format as under:<br />

Name of Road Agency __________________________<br />

Category<br />

Type of Surface<br />

Length (km)<br />

Positi<strong>on</strong> as <strong>on</strong> 1.1.2005<br />

Remarks<br />

of road<br />

(i) ODR<br />

(ii) VR<br />

BT WBM Gravel Earth<br />

(iii) Amount of expenditure incurred <strong>on</strong> rural roads by each agency <str<strong>on</strong>g>for</str<strong>on</strong>g> the<br />

last three years. Give separate details of PMGSY and n<strong>on</strong>-PMGSY<br />

rural roads. Format as under. For n<strong>on</strong>-PMGSY <strong>Rural</strong> Roads, the<br />

details are to be given <str<strong>on</strong>g>for</str<strong>on</strong>g> each programme separately:<br />

Name of Road Agency __________________<br />

Amount in Rs. Lakh<br />

Activity 2002-02 2003-04 2004-05 Remarks<br />

1. PMGSY<br />

A. C<strong>on</strong>structi<strong>on</strong><br />

(i) ODR<br />

(ii) VR<br />

B. Maintenance<br />

(i) ODR<br />

(ii) VR<br />

2. N<strong>on</strong>-PMGSY (Programme Wise)<br />

A. C<strong>on</strong>structi<strong>on</strong><br />

(i) ODR<br />

(ii) VR<br />

B. Maintenance<br />

(i) ODR<br />

(ii) VR<br />

(iv) Name of nodal or coordinating agency <str<strong>on</strong>g>for</str<strong>on</strong>g> rural roads in the State.


2. Status of PMGSY roads programmes. Following data may be provided<br />

A. C<strong>on</strong>nectivity Status<br />

Total<br />

number of<br />

habitati<strong>on</strong>s<br />

Total<br />

number of<br />

habitati<strong>on</strong>s<br />

above<br />

populati<strong>on</strong><br />

500*<br />

No of<br />

habitati<strong>on</strong>s<br />

above 500*<br />

remaining<br />

to be<br />

c<strong>on</strong>nected<br />

as <strong>on</strong><br />

1.1.2001<br />

* 250 in case of hills, deserts, tribal areas<br />

B. Physical and Financial Status:<br />

Amount (Rs. Crore) <str<strong>on</strong>g>from</str<strong>on</strong>g><br />

incepti<strong>on</strong> to 1.1.2005<br />

Sancti<strong>on</strong>ed<br />

(value cleared)<br />

Released<br />

Number of<br />

roads<br />

No of<br />

habitati<strong>on</strong>s<br />

above 500*<br />

c<strong>on</strong>nected<br />

<str<strong>on</strong>g>from</str<strong>on</strong>g><br />

1.1.2001 to<br />

31.12.2004<br />

No of<br />

habitati<strong>on</strong>s<br />

above 500*<br />

remaining<br />

to be<br />

c<strong>on</strong>nected<br />

as <strong>on</strong><br />

1.1.2005<br />

Length of<br />

roads (km)<br />

No of<br />

habitati<strong>on</strong>s<br />

above 500*<br />

remaining<br />

to be<br />

c<strong>on</strong>nected<br />

as in<br />

1.1.2005<br />

Number of<br />

habitati<strong>on</strong>s<br />

covered<br />

C. Total length of rural roads (district-wise), required fro the District Level<br />

<strong>Rural</strong> Roads Plans:<br />

Name of<br />

District<br />

Length of core road network<br />

Through roads Link roads<br />

Length of n<strong>on</strong>core<br />

road<br />

network<br />

Total<br />

D. Give the estimate of employment generated as a result of the PMGSY<br />

programmes in each of the past three yeas-2002-03, 2003-04 and 2004-05.<br />

3. Status of rural roads programmes being undertaken by the State other than the<br />

PMGSY roads.<br />

Briefly describe the rural roads c<strong>on</strong>structi<strong>on</strong> and maintenance activities being<br />

undertaken by road agencies fro rural roads other than PMGSY roads in the last<br />

three yeas 2002-03, 2003-04 and 2004-05. Please give details about technical<br />

standards to which these roads are being built.<br />

4. What are the various c<strong>on</strong>structi<strong>on</strong> technologies being practiced by the State?<br />

Highlight any innovative technology introduced in c<strong>on</strong>structi<strong>on</strong> and / or<br />

maintenance or rural roads.<br />

5. What is the State policy in acquiring land <str<strong>on</strong>g>for</str<strong>on</strong>g> rural roads? What is the experience<br />

regarding community participati<strong>on</strong> in land acquisiti<strong>on</strong>?


6. The State my provide a copy of the District <strong>Rural</strong> Roads Plan and summary of<br />

their assessment regarding total length of rural roads, which require new<br />

c<strong>on</strong>structi<strong>on</strong> and which require improvement of existing roads separately to<br />

provide 100 per cent c<strong>on</strong>nectivity to all villages in the District.<br />

7. What are the norms followed by the State <str<strong>on</strong>g>for</str<strong>on</strong>g> maintenance of rural roads. Give<br />

amount per km <str<strong>on</strong>g>for</str<strong>on</strong>g> routine maintenance and periodic maintenance separately. Has<br />

the State taken up routine maintenance of <strong>Rural</strong> Roads <strong>on</strong> per<str<strong>on</strong>g>for</str<strong>on</strong>g>mance based<br />

c<strong>on</strong>tracts? Is so, give details<br />

8. (a) Briefly describe the role of Panchayati Raj Instituti<strong>on</strong>s (PRIs) in provisi<strong>on</strong> and<br />

maintenance of rural roads at Gram Panchayati (GP), block Panchayat (BP)<br />

and Zilla Panchayat (ZP) levels. How do they get funds <str<strong>on</strong>g>for</str<strong>on</strong>g> rural roads?<br />

Whether PRIs raise their own funds <str<strong>on</strong>g>for</str<strong>on</strong>g> maintenance.<br />

(b) What role do communities play in provisi<strong>on</strong> and maintenance of rural roads?<br />

(c) What are current arrangements <str<strong>on</strong>g>for</str<strong>on</strong>g> technical support to PRIs.<br />

9. What is the strength of gang labour <str<strong>on</strong>g>for</str<strong>on</strong>g> maintenance of rural roads? What is the<br />

current policy <str<strong>on</strong>g>for</str<strong>on</strong>g> recruitment of gang labour <str<strong>on</strong>g>for</str<strong>on</strong>g> rural roads? Does the state think<br />

that any re<str<strong>on</strong>g>for</str<strong>on</strong>g>m is required <str<strong>on</strong>g>for</str<strong>on</strong>g> improving their productivity? What re<str<strong>on</strong>g>for</str<strong>on</strong>g>ms can<br />

work?<br />

10. what are the arrangements <str<strong>on</strong>g>for</str<strong>on</strong>g> c<strong>on</strong>diti<strong>on</strong> surveys and road inventory of rural roads<br />

made by various road agencies in the states? Are there any plans to institute road<br />

database? If so, give details.<br />

11. Give a brief note <strong>on</strong> the status of the rural roads c<strong>on</strong>structed under different<br />

employment generating programmes and their utilizati<strong>on</strong>. You may bring out the<br />

c<strong>on</strong>diti<strong>on</strong> of such roads c<strong>on</strong>structed and the specificati<strong>on</strong>s and standards required<br />

<str<strong>on</strong>g>for</str<strong>on</strong>g> <strong>Rural</strong> Roads. Give your comments <strong>on</strong> the c<strong>on</strong>structi<strong>on</strong> of the <strong>Rural</strong> Roads<br />

under such programmes.<br />

12. What is the planning process of <strong>Rural</strong> Roads adopted in your State? Give a brief<br />

descripti<strong>on</strong> <str<strong>on</strong>g>for</str<strong>on</strong>g> each level of planning process in the development of <strong>Rural</strong> Roads.<br />

13. Briefly explain how the road network is included in the planning processes while<br />

creating infrastructural facilities such as Primary Schools, High Schools, Primary<br />

Health Centers, Market Yards, etc. Also explain, whether the new c<strong>on</strong>nectivity<br />

created is utilized in the sitting of infrastructural facilities dependent <strong>on</strong><br />

c<strong>on</strong>nectivity <str<strong>on</strong>g>for</str<strong>on</strong>g> achieving integrated development.


14. Did the State receive funds <str<strong>on</strong>g>for</str<strong>on</strong>g> <strong>Rural</strong> C<strong>on</strong>nectivity <strong>Rural</strong> Roads Development<br />

including modernizati<strong>on</strong>) or as part of agricultural support, etc. <str<strong>on</strong>g>from</str<strong>on</strong>g> external<br />

funding agencies such as World Bank, ADB, etc.? if so, give details.<br />

15. If the answer <str<strong>on</strong>g>for</str<strong>on</strong>g> Questi<strong>on</strong> 14 is ‘Yes’, indicate the experiences of the State in<br />

developing <strong>Rural</strong> Roads through external funding in planning, implementati<strong>on</strong><br />

and maintenance of the roads created under Externally Aided Projects. You may<br />

also comment <strong>on</strong> how such experiences have percolated into the system <str<strong>on</strong>g>for</str<strong>on</strong>g> <strong>Rural</strong><br />

Roads Development in other programme.<br />

16. What is the status of c<strong>on</strong>tracting industry in the State? Give a brief note <strong>on</strong> the<br />

absorpti<strong>on</strong> capacity, equipment and machinery with the c<strong>on</strong>tractors and ability to<br />

cope with increased allocati<strong>on</strong> of funds <str<strong>on</strong>g>for</str<strong>on</strong>g> <strong>Rural</strong> Roads, in your State.<br />

17. What has been the experience of the State with outsourcing of functi<strong>on</strong>s like DPR<br />

(Detailed Project Report) preparati<strong>on</strong>, work supervisi<strong>on</strong> and quality c<strong>on</strong>trol in the<br />

<strong>Rural</strong> Roads Sector?<br />

18. PMGSY has endeavored to create a Govt.-Academia partnership through<br />

Principal Technical and State Technical Agencies. What further steps do you<br />

suggest to create such capacity building over the next 20 years? How can such<br />

partnership be strengthened?<br />

19. Do you have any comments <strong>on</strong> thee geometric standards <strong>on</strong> rural roads of the IRC<br />

(Refer Chapter2 of IRC:SP:20 <strong>Rural</strong> Roads Manual) with regard to land width,<br />

design speed, sight distance, radii of curvature and vertical curves, etc. If so,<br />

give details of difficulty experienced, etc.<br />

20. What are the views of the State <strong>on</strong> the adopti<strong>on</strong> of gravel surfacing <strong>on</strong> link roads<br />

to habitati<strong>on</strong> with populati<strong>on</strong> less than 500?<br />

Name ________________________<br />

Designati<strong>on</strong> ___________________<br />

Address ______________________<br />

Ph<strong>on</strong>es _______________________

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!