STRUCTURAL NOTES - THIS BUILDING IS DESIGNED UNDER PART 9 OF THE BCBC (HOUSING & SMALL BUILDINGS)<br />
1.<br />
2.<br />
2.1<br />
THESE INCLUDE THE FOLLOWING :<br />
REFERENCE GEOTECHNICAL REPORT _________ DATED<br />
2.2 NO FOUNDATIONS MAY BE POURED BEFORE BEARING MATERIAL HAS BEEN<br />
APPROVED BY THE GEOTECHNICAL ENGINEER. CONTRACTOR TO NOTIFY<br />
SOILS ENGINEER MINIMUM 48 HOURS BEFORE CONCRETE POUR.<br />
2.3 THE BASE OF THE FOUNDATIONS SHALL BE PROTECTED AGAINST RAIN, SNOW,<br />
FROST AND ANY WATER INFILTRATION.<br />
2.4 ALL FOOTINGS SHALL BE FORMED AS INDICATED ON THE FOUNDATION PLANS<br />
IN ACCORDANCE TO THE RECOMMENDATIONS OF THE GEOTECHNICAL ENGINEER.<br />
2.5<br />
CENTRE ALL FOOTINGS UNDER COLUMNS AND WALLS UNLESS OTHERWISE NOTED.<br />
2.6 FOOTINGS HAVE BEEN DESIGNED FOR AN ALLOWABLE BEARING<br />
PRESSURE OF 2000 PSF ( 100 KPa ) AS STATED IN SOILS REPORT.<br />
2.7 SEE SOILS REPORT FOR PREPARATION OF SUBGRADE.<br />
2.8<br />
3.<br />
GENERAL<br />
1.1 THE NOTES AND SPECIFICATIONS GIVEN ON THE STRUCTURAL DRAWINGS<br />
ARE TO BE READ IN CONJUNCTION WITH THESE NOTES. THEY ARE NEITHER<br />
COMPLETE NOR DO THEY REPLACE THE CONTRACT SPECIFICATIONS.<br />
1.2 THESE DRAWINGS SHALL BE READ IN CONJUNCTION WITH THE DRAWINGS AND<br />
SPECIFICATIONS OF ALL OTHER CONSULTANTS.<br />
ANY DISCREPANCIES NOTED SHALL BE REPORTED IMMEDIATELY<br />
FOR CLARIFICATION.<br />
1.3 THIS BUILDING HAS BEEN DESIGNED FOR WIND AND SEISMIC FORCES IN<br />
ACCORDANCE WITH THE PROVISIONS SET FORTH IN THE B.C. BUILDING CODE 2006.<br />
1.4<br />
1.5<br />
1.6<br />
SEISMIC DATA :<br />
* TIMBER STRUCTURE DESIGNED AND DETAILED ACCORDING TO CAN/CSA-086<br />
TYPE OF SFRS - NAILED SHEAR WALLS, TABLE 4.1.8.9<br />
DEAD LOADS ( SPECIFIED ) (SUPERIMPOSED)<br />
ROOF<br />
FLOORS<br />
LIVE LOADS ( SPECIFIED )<br />
GROUND SNOW Ss<br />
ROOF SNOW<br />
RAIN Sr<br />
DESIGN LOAD<br />
MAIN FLOOR<br />
WIND LOADS<br />
1.71<br />
1.72<br />
1.73<br />
1.74<br />
1.75<br />
PREPARED BY ___________<br />
CONCRETE<br />
STRUCTURAL STEEL ELEMENTS (HAMBRO)<br />
WOOD I-JOISTS<br />
ROOF TRUSSES<br />
HANGERS & TIEDOWNS<br />
Sa(0.2) = 0.28<br />
Sa(0.5) = 0.17<br />
Sa(1.0) = 0.094<br />
Sa(2.0) = 0.056<br />
PGA = 0.14<br />
GLU-LAM & PSL WOOD BEAMS<br />
= 10 PSF<br />
= 10 PSF<br />
= 60.60 PSF<br />
= 33.33 PSF<br />
= 2.1 PSF<br />
= 35.43 PSF<br />
= 40 PSF<br />
FOUNDATION AND SITE WORK<br />
Rd =<br />
Ro = 1.7*<br />
Fa = 1.0<br />
Fv = 1.0<br />
1.7 MANUFACTURERS OF ALL STRUCTURAL COMPONENTS SHALL SUBMIT SHOP<br />
DRAWINGS SEALED BY A PROFESSIONAL ENGINEER REGISTERED IN<br />
BRITISH COLUMBIA FOR REVIEW & APPROVAL PRIOR TO FABRICATION.<br />
PERIMETER FOOTING DRAINAGE - SEE MECHANICAL DRAWINGS.<br />
3.1 ALL CONCRETE WORK SHALL COMPLY WITH THE REQUIREMENTS<br />
OF CSA STANDARD A23.3-04. CONCRETE STRENGTHS TO BE<br />
VERIFIED BY INDEPENDENT TESTS TO CSA A23. AT THE<br />
EXPENSE OF THE CONTRACTOR. A MINIMUM OF 3 TEST CYLINDERS SHALL<br />
BE CAST FOR EACH 100 CUBIC METERS OR EACH DAYS POUR WHICHEVER<br />
IS LESS, WITH COPIES SUBMITTED TO THE ENGINEER.<br />
I =<br />
.478<br />
.478<br />
2.90<br />
1.60<br />
.11<br />
1.70<br />
1.9<br />
1/10 = 7.1 PSF .34<br />
1/50 = 9.8 PSF .47<br />
3*<br />
1<br />
kN/m2<br />
kN/m2<br />
kN/m2<br />
kN/m2<br />
kN/m2<br />
kN/m2<br />
kN/m2<br />
kN/m2<br />
kN/m2<br />
3.2<br />
3.3 CEMENT SHALL BE TYPE 10 TO CAN/CSA-A23.3-04 ALTERNATE 1<br />
3.4 ALL COLD OR HOT WEATHER CONCRETE WORK SHALL CONFORM TO<br />
CSA-A23.3-04.<br />
3.5 REINFORCING BARS SHALL BE BILLET STEEL BARS CONFORMING TO<br />
CSA G30.18-M92 GRADE 400. WELDED WIRE MESH SHALL CONFORM TO<br />
CSA G30.5-R1991. LAPS SHALL INCLUDE TWO CROSS WIRES PLUS 2" ( 50.8mm ).<br />
3.6<br />
3.7<br />
3.8<br />
3.9<br />
3.10<br />
EXPOSED TO SOIL OR WEATHER, 20M AND LARGER<br />
EXPOSED TO SOIL OR WEATHER, 15M AND SMALLER<br />
WALLS AND SURFACES OF SUSPENDED SLABS<br />
BOTTOM SURFACES OF SUSPENDED SLABS<br />
NOTIFY ENGINEER MINIMUM 24 HOURS PRIOR TO ANY POUR.<br />
3.11 PLACE REINFORCING BARS SYMMETRICALLY OVER SUPPORTS AND<br />
SYMMETRICALLY IN SPANS UNLESS OTHERWISE NOTED.<br />
3.12 ALL DOWELS AND ANCHOR BOLTS SHALL BE PLACED BEFORE<br />
THE CONCRETE IS POURED. TEMPLATES SHALL BE USED TO<br />
ENSURE CORRECT PLACEMENT.<br />
3.13 WALLS AND COLUMNS :<br />
3.14<br />
6.<br />
6.1<br />
6.2<br />
6.3<br />
6.4<br />
6.5<br />
6.6<br />
7.<br />
7.1<br />
7.2<br />
7.3<br />
7.4<br />
ALL CONCRETE SHALL HAVE A 28 DAY COMPRESSIVE STRENGTH OF :<br />
GRADE BEAMS<br />
FOUNDATION WALLS<br />
COLUMNS<br />
SUSPENDED SLAB<br />
TILT-UP<br />
LOCATION<br />
S.O.G. : - INTERIOR<br />
FOOTINGS<br />
COLUMNS<br />
BEAMS<br />
- EXTERIOR<br />
LAP SPLICE REINFORCEMENT AS FOLLOWS ( UNLESS OTHERWISE NOTED ) :<br />
WIRE MESH<br />
10M<br />
15M<br />
20M<br />
25M<br />
12"<br />
18"<br />
26"<br />
30"<br />
50"<br />
STAGGER SPLICES IN WALLS AND SLABS.<br />
DESIGNATION OF REINFORCING BARS :<br />
3-10M36 MEANS THREE 10M BARS 36" ( 914 mm ) LONG<br />
2-C10M10' MEANS 2 1OM BARS, EACH END WITH A 90 DEGREE<br />
STANDARD HOOK AN A TOTAL LENGTH OF 10' ( 3048 mm ).<br />
STEEL SHALL BE PLACED ACCORDING TO "THE MANUAL OF STANDARD<br />
PRACTICE" OF THE REINFORCING INSTITUTE OF ONTARIO, 4TH EDITION 1990<br />
WELDING OF REINFORCING IS NOT PERMITTED WITHOUT WRITTEN APPROVAL<br />
CLEAR COVER FOR REINFORCEMENT :<br />
CAST AGAINST SOIL<br />
3" 76<br />
2" 51<br />
1 1/2" 38<br />
1" 25<br />
1" 25<br />
2" 50<br />
1" 25<br />
3.13.1 WALLS AND COLUMNS SHALL NOT BE POURED HIGHER THAN THE<br />
UNDERSIDE OF THE MEMBER SUPPORTED. ANY EXTRA HEIGHT<br />
SHALL BE REMOVED BEFORE POURING THE NEXT LEVEL.<br />
( mm )<br />
3.13.2 PROVIDE 10M CORNER BARS FOR THE LESSER AMOUNT OF<br />
HORIZONTAL WALL REINFORCING AT ALL CONCRETE / CONCRETE<br />
AND CONCRETE / BLOCK WALL INTERSECTIONS UNLESS HORIZONTAL<br />
REINFORCEMENT IS HOOKED AS SHOWN IN THE TYPICAL DETAILS.<br />
REFER TO ARCHITECTURAL DETAILS FOR ALL SLAB DEPRESSIONS, FALLS, ETC.<br />
WOOD FRAMING<br />
STRENGTH<br />
PSI (mPa)<br />
3600<br />
5000<br />
3600<br />
3600<br />
3600<br />
5000<br />
5000<br />
5000<br />
25<br />
35<br />
( )<br />
( )<br />
( 25 )<br />
( 25 )<br />
( )<br />
25<br />
( 35 )<br />
( 35 )<br />
( 35 )<br />
( 305 mm )<br />
( 457 mm )<br />
( 660 mm )<br />
( 762 mm )<br />
( 1270mm<br />
)<br />
AIR %<br />
4 - 8<br />
4 - 8<br />
1 - 4<br />
4 - 7<br />
4 - 7<br />
4 - 7<br />
4 - 7<br />
DENOTES TOP BARS<br />
DENOTES BOTTOM BARS<br />
ALL DIMENSIONAL LUMBER TO BE #2 SPF OR BETTER,<br />
WALL STUDS MUST BE #2 SPF OR BETTER.<br />
SLUMP<br />
+20 mm<br />
70<br />
70<br />
70<br />
60<br />
60<br />
60<br />
60<br />
ALL SUBFLOORING TO BE 5/8" ( 16mm ) PLYWOOD CSA 021 DOUGLAS FIR,<br />
PHENOLIC BONDED OR GOLD EDGE, UNLESS INDICATED OTHERWISE.<br />
EXPOSURE<br />
CLASS<br />
C2<br />
F2<br />
F2<br />
F2<br />
( mm )<br />
( mm )<br />
( mm )<br />
( mm )<br />
( mm )<br />
( mm )<br />
ROOF SHEATHING TO BE 1/2" ( 12 mm ) PLYWOOD CSA 021 DOUGLAS FIR,<br />
PHENOLIC BONDED.<br />
SHEATHING TO HAVE SURFACE GRAINS AT RIGHT ANGLES TO FRAMING<br />
WITH 1/16" ( 1.5mm ) GAP BETWEEN BUTTING ENDS.<br />
ALL CROSS BRIDGING TO BE 2 x 2 @ 6' O.C. ( 38mm x 38mm @ 1800mm ) OR<br />
IN ACCORDANCE WITH JOIST MANUFACTURERS SPECIFICATIONS.<br />
ALL LINTELS TO BE 2 - 2 x 10 ( 38mm x 2866mm ) #2 SPF UNLESS INDICATED<br />
OTHERWISE.<br />
GLUE LAMINATED MEMBERS<br />
GLUE LAMINATED MEMBERS SHALL BE FABRICATED BY A PLANT CONFORMING<br />
TO CSA 0177-M89 (R2003) "QUALIFICATION CODE FOR MANUFACTURERS OF GLUE<br />
LAMINATED TIMBER".<br />
STRESS GRADES : 24f-E BENDING GRADES, UNLESS INDICATED ELSEWHERE.<br />
COLUMN GRADES : 16c-E COMPRESSION GRADES, UNLESS INDICATED ELSEWHERE.<br />
GENERAL CONTRACTOR TO SUBMIT ALL PERTINENT DRAWINGS AND DESIGN<br />
INFORMATION TO MANUFACTURER, INCLUDING ANY PERTINENT MECHANICAL<br />
AND ELECTRICAL EQUIPMENT THAT WOULD AFFECT BEAM DESIGN.<br />
MANUFACTURER / CONTRACTOR TO SUBMIT SHOP DRAWINGS TO DESIGN<br />
AUTHORITY, STRUCTURAL ENGINEER FOR APPROVAL PRIOR TO MANUFACTURER.<br />
8.<br />
8.1<br />
8.2<br />
8.3 ALL PERTINENT DRAWINGS AND DESIGN INFORMATION THAT MAY AFFECT<br />
TRUSSES / M.J.'S DESIGN MUST ALSO BE SUBMITTED TO THE GENERAL CONTRACTOR /<br />
SUBCONTRACTORS TO THE TRUSS MANUFACTURER. IN PARTICULAR MECHANICAL,<br />
PLUMBING AND ELECTRICAL DRAWINGS INDICATING SPECIALIZED FIXTURES<br />
WITH ARCHITECTURAL AND STRUCTURAL DRAWINGS.<br />
8.4<br />
8.5<br />
19.<br />
9.1<br />
9.2<br />
9.3<br />
10.<br />
10.1<br />
11.<br />
11.1<br />
TRUSSES AND FLOOR JOISTS<br />
TRUSS / MANUFACTURED JOISTS ( M.J.'S ) AND SPACING AS INDICATED ON<br />
DRAWINGS ARE FOR REFERENCE ONLY. THESE DRAWINGS DO NOT COVER<br />
TRUSS / M.J.'S DESIGN. THE OWNER / CONTRACTOR IS RESPONSIBLE FOR HAVING<br />
THE TRUSSES / M.J.'S CONNECTION DETAILS AND ERECTION BRACING SYSTEM ETC.<br />
DESIGNED IN ACCORDANCE TO THE B.C. BUILDING CODE 1998, AND<br />
MANUFACTURERS SPECIFICATIONS.<br />
TRUSSES / M.J.'S TO BE DESIGNED FOR LOADS UNDER "DESIGN LOADS SECTIONS".<br />
THE GENERAL CONTRACTOR WITH RESPECT TO MECHANICAL EQUIPMENT MUST<br />
CONFIRM WITH BOTH THE STRUCTURAL ENGINEER AND TRUSS MANUFACTURER,<br />
ALL INFORMATION RELATING TO LOCATION, WEIGHT AND CLEARANCE REQUIRED<br />
FOR DUCTS AND SPECIALIZED EQUIPMENT.<br />
MANUFACTURER MUST SUBMIT SHOP DRAWINGS FOR PLAN CHECK AND APPROVAL,<br />
TO STRUCTURAL ENGINEER. DESIGN AUTHORITY AND WHERE APPLICABLE THE<br />
MECHANICAL ENGINEER AND / OR MECHANICAL CONTRACTOR AND ELECTRICAL<br />
ENGINEER AND / OR ELECTRICAL CONTRACTOR.<br />
EMBEDDED CONDUITS, PIPES & SLEEVES<br />
EXCEPT WHEN APPROVED BY THE STRUCTURAL ENGINEER,<br />
PIPES CONDUITS AND SLEEVES EMBEDDED IN CONCRETE<br />
SHALL BE INSTALLED IN ACCORDANCE WITH THE FOLLOWING GUIDELINES :<br />
9.1.1<br />
9.1.2<br />
9.1.3<br />
9.1.4<br />
1'-0"<br />
LAP<br />
COMPACTED FILLS<br />
APPROVED BY THE<br />
PROJECT GEOTECH<br />
DRILL INTO SIDE WALLS<br />
A MIN. OF 4" THEN HILTI<br />
HIT EPOXY THE 15M BARS<br />
TO THE WALLS<br />
4"<br />
8"<br />
CENTRELINE SPACING TO BE NOT LESS THAN 3 DIAMETERS.<br />
CENTRELINE SPACING BETWEEN PARALLEL CONDUIT<br />
AND REINFORCING TO BE NOT LESS THAN 3 DIAMETERS<br />
OUTSIDE DIAMETER TO BE NOT GREATER THAN ONE THIRD THE<br />
THICKNESS OF THE SLAB FOR ONE LAYER AND ONE FOURTH<br />
THE THICKNESS FOR TWO LAYERS.<br />
CONCRETE COVER TO BE NOT LESS THAN 2" ( 51 mm ) AND PIPES OR<br />
CONDUIT TO BE LOCATED BETWEEN THE TOP AND BOTTOM LAYER<br />
OF REINFORCEMENT.<br />
MAXIMUM SIZE OF PIPE OR CONDUIT IN CONCRETE TOPPING ON STEEL DECKING<br />
TO BE 3/4" ( 19 mm ).<br />
PIPE OR CONDUIT IN CONCRETE TOPPING ON STEEL DECK MAY BE PLACED IN<br />
ONE LAYER ONLY ( NO CROSSING ) AND MAY BE DIRECTLY SCREWED TO<br />
STEEL DECKING IN ACCORDANCE WITH 6.1.1 ABOVE.<br />
INSPECTIONS AND TESTING<br />
NOTIFY THE ENGINEER 24 HOURS IN ADVANCE ( 48 HOURS OVER 100 KM<br />
FROM KELOWNA ) FOR INSPECTION OF THE FOLLOWING :<br />
REINFORCING STEEL PRIOR TO EACH CONCRETE POUR AND MASONRY<br />
REINFORCEMENT PRIOR TO EACH GROUT POUR.<br />
STRUCTURAL STEEL PRIOR TO CONCEALMENT<br />
WOOD FRAMING PRIOR TO CONCEALMENT<br />
TEMPORARY SHORING<br />
TEMPORARY SHORING DRAWINGS MUST BE SEALED BY A<br />
STRUCTURAL ENGINEER. DRAWING MUST BE SUBMITTED FOR<br />
APPROVAL PRIOR TO FORMING ANY SUSPENDED SLAB<br />
OR SUPPORTING ANY EXISTING STRUCTURAL MEMBERS<br />
PRIOR TO REMOVING WALLS, BEAMS AND ETC.<br />
10M@12" o.c.,B/W<br />
APPROVED<br />
BUILDING<br />
MATERIAL<br />
MAX. SLOPE<br />
15M @ 16" O/C E/W<br />
4"<br />
APPROVED BEARING MATERIAL<br />
15M DOWELS LAPPED WITH REINF.<br />
AND DRILLED & GROUTED 2" INTO<br />
SLAB-ON-GRADE<br />
15M(@NOSING)<br />
3"<br />
FROST WALL REQUIRED<br />
ONLY @ EXTERIOR<br />
LOCATIONS SEE PLAN<br />
TYP. STAIR ON GRADE 11<br />
<strong>S1</strong><br />
REFER TO DETAILS FOR<br />
FOOTING REINFORCING<br />
AND WALL DOWELS.<br />
T.O.FOOTING<br />
MIN 2'-0" FROST COVER<br />
SLAB or GRADE<br />
MIN. FROST COVER AS PER CODE<br />
VERIFY w/ GEOTECH REGARDING<br />
SOIL FROST SUSCEPTIBILITY,<br />
AND / OR POSSIBILITY<br />
OF DEEPER FOOTINGS.<br />
1'-6"MIN - 4'-0" MAX<br />
TYP. STEPPED<br />
FOOTING DET.<br />
SPLICE<br />
AS PER<br />
GENERAL NOTES<br />
12<br />
<strong>S1</strong><br />
2'-0"<br />
5/8"Ø ANC BOLTS<br />
x 8" LG.@ 32" o.c.<br />
2-10M CONT BAR<br />
1-10M CONT BAR @<br />
SNAP TIE LOCATION<br />
2-10M CONT BAR<br />
27"<br />
BASEMENT WALL<br />
27"<br />
6"<br />
10M WALL<br />
DOWELS @ 24" oc<br />
6"<br />
10M WALL DOWELS @ 36" oc<br />
8"<br />
MINIMUM EXACAVATION REQ'D<br />
WHEN SOIL IS SILTY CLAY TYPE.<br />
DISREGARD WHEN SOILS ARE OF<br />
THE SANDY GRAVEL TYPE.<br />
(GEOTECH TO VERIFY SOILS)<br />
2"+/- CONC SKIM COAT<br />
2"+/- CONC SKIM COAT<br />
SITE EXCAVATION MUST CONFORM<br />
WITH "WCB" REGULATIONS. THE<br />
CONTRACTOR IS SOLELY<br />
RESPONSIBLE FOR ALL SITE<br />
EXCAVATION, AS WELL AS ANY<br />
TRENCH OR SLOPE SHORING.<br />
10M TIES @ 8" oc<br />
4-15M VERTS<br />
c/w 12" HOOK<br />
INTO FOOTING<br />
3-15M EACH WAY<br />
2'-0"<br />
5/8"Ø ANC BOLTS<br />
x 8" LG.@ 32" o.c.<br />
1-10M CONT BAR @<br />
SNAP TIE LOCATION<br />
2-10M CONT. BARS<br />
3"<br />
COVER<br />
APPROVED<br />
BRG. MATERIAL<br />
8"<br />
1'-4"<br />
TYPICAL FOOTING<br />
WIDTH U.N.O.<br />
GRADE<br />
2-10M CONT BAR<br />
FOUNDATION DRAIN<br />
TILE BY OTHERS<br />
8"<br />
2'-0"<br />
2'-8"<br />
FOUNDATION WALL SECTION 1<br />
<strong>S1</strong><br />
5/8"Ø ANC BOLTS<br />
x 8" LG.@ 24" o.c.<br />
1-10M CONT BAR @<br />
SNAP TIE LOCATION<br />
2-10M CONT. BARS<br />
3"<br />
COVER<br />
APPROVED<br />
BRG. MATERIAL<br />
1'-4"<br />
2-10M CONT BAR<br />
FOUNDATION WALL SECTION 2<br />
<strong>S1</strong><br />
10" MIN<br />
3'-0"<br />
APPROVED<br />
BRG. MATERIAL<br />
GRADE<br />
6"<br />
TYPICAL FOOTING<br />
WIDTH U.N.O.<br />
FOUNDATION WALL @ OPENING 3<br />
<strong>S1</strong><br />
FOUNDATION DRAIN<br />
TILE BY OTHERS<br />
24"<br />
10M CORNER BAR<br />
24"<br />
TYP. CORNER DETAIL 6<br />
<strong>S1</strong><br />
10M STIRRUPS @10" o.c.<br />
VERT BARS<br />
HORZ BARS<br />
2'-0" 4'-0" +/- OPENING 2'-0"<br />
REBAR TO EXTEND MIN 2'-0" IN EACH DIRECTION<br />
PAST THE OPENING OR OVER THE DROP.<br />
GRADE BEAM SECTION 7<br />
<strong>S1</strong><br />
FOOTING<br />
PIER SECTION 4<br />
<strong>S1</strong><br />
8"<br />
OUTSIDE<br />
2'-0" MIN<br />
3"<br />
COVER<br />
2'-0"<br />
8"<br />
EM2 SHEAR PLATE<br />
PL 150x9.5x200mm<br />
2-16mm STUDS x 100mm<br />
SITE EXCAVATION MUST CONFORM<br />
WITH "WCB" REGULATIONS. THE<br />
CONTRACTOR IS SOLELY<br />
RESPONSIBLE FOR ALL SITE<br />
EXCAVATION, AS WELL AS ANY<br />
TRENCH OR SLOPE SHORING.<br />
MINIMUM EXACAVATION REQ'D<br />
WHEN SOIL IS SILTY CLAY TYPE.<br />
DISREGARD WHEN SOILS ARE OF<br />
THE SANDY GRAVEL TYPE.<br />
(GEOTECH TO VERIFY SOILS)<br />
2"+/- CONC SKIM COAT<br />
2@ 43" +/-<br />
2@ 47" +/-<br />
FOUNDATION DRAIN<br />
TILE BY OTHERS<br />
10M WALL DOWELS ON<br />
EITHER SIDE OF OPENINGS<br />
3' LONG 10M BARS @<br />
45° IN THE CORNERS OF<br />
OPENINGS<br />
10M WALL DOWELS @ 24"o.c.<br />
8"<br />
16"x8" TYPICAL FOOTING<br />
WIDTH U.N.O.<br />
2-15M CONT<br />
BARS TOP AND<br />
BOTTOM TO<br />
EXTEND PAST<br />
OPENING A MIN.<br />
OF 24" (TYP.)<br />
12"<br />
4-15M VERTS<br />
IMPORTANT SOILS INFORMATION<br />
INFORMATION, VERIFICATION, AND<br />
CERTIFICATION OF SOIL ISSUES<br />
SUCH AS, BUT NOT LIMITED TO:<br />
SOIL BEARING CAPACITIES, COM-<br />
PACTING, ETC..., ARE THE RESPON-<br />
SIBILITY OF THE LOCAL BUILDING<br />
DEPARTMENT , OR A REGISTERED<br />
GEOTECHNICAL ENG.<br />
ROV CANNOT BE HELD ACCOUNT-<br />
ABLE FOR ANY SOILS RELATED<br />
ISSUES AT ANY TIME (PRESENT<br />
OR FUTURE).<br />
SITE EXCAVATION MUST CONFORM<br />
WITH "WCB" REGULATIONS. THE<br />
CONTRACTOR IS SOLELY<br />
RESPONSIBLE FOR ALL SITE<br />
EXCAVATION, AS WELL AS ANY<br />
TRENCH OR SLOPE SHORING.<br />
2'-0" MIN<br />
8"<br />
MINIMUM EXACAVATION REQ'D<br />
WHEN SOIL IS SILTY CLAY TYPE.<br />
DISREGARD WHEN SOILS ARE OF<br />
THE SANDY GRAVEL TYPE.<br />
(GEOTECH TO VERIFY SOILS)<br />
2'-0"<br />
STRUCTURAL NOTES:<br />
GENERAL:<br />
The following notes apply in general, notes specified on the drawing govern,<br />
and in no way limit the reminder of these notes.<br />
DESIGN:<br />
Design is in accordance with the British Columbia Building Code 2006<br />
Edition. (Design loads as follows) (EFP=equiv.fuild press)<br />
Foundation Walls; 30pcf (EFP) as per BCBC 9.4.4.6.1)<br />
Slab live loads; 50psf<br />
All dead loads derived from plans. Wall surcharge loads as noted.<br />
FOUNDATIONS:<br />
All soil conditions shall be verified by the Building Dept. or a Geotech Eng.<br />
Footing shall be placed upon original undisturbed native ground. Once<br />
excavation is complete, contact the authorities to confirm site conditions.<br />
Foundation walls have been designed for an allowable soil bearing pressure of<br />
2000 psf (95 Kpa). Retaining walls have been designed for an allowable soil<br />
pressure of 3000 psf (144 Kpa). No footing shall bear higher than 2.0<br />
horizon. to 1.0 vert. to any excavation planned or existing. Footings shall be<br />
kept free of standing water and shall be protected from freezing when<br />
applicable.<br />
3.REINFORCING<br />
Shall be new stock deformed steel bars, grade 400MPa. conforming to CSA<br />
G30.12M. Placement of bars shall be as shown on the drawings. Splices shall<br />
be min.24" unless noted. Stagger splices in adjacent bars where applicable.<br />
-------Minimum bar coverage unless noted otherwise----------<br />
1 1/2" to formed surfaces; 3" to unformed surfaces. Slab mesh and/or rebar<br />
reinforcing to be centered. Suspended slab, columns, etc., as detailed on<br />
the drawings. All corners to be continous. Min. lap splice 24" unless noted.<br />
4.CONCRETE<br />
Concrete materials and methods of construction to conform to CAN /<br />
CSA-A23.3-04<br />
-All concrete (footings, walls, etc.) shall be 25MPa. @28 days.<br />
-HAMBRO Floor slabs shall be 32MPa @ 28 days min. strength.<br />
5.INSPECTIONS<br />
Provide 24 hours notice to the design engineer prior to all required site<br />
inspections; (see below).<br />
A) Prior to casting any concrete (footings, walls, SLABS, etc.)<br />
B) Prior to Backfilling to check floor diaphram connections and floor slab.<br />
C) Prior to concealing wood framing where applicable.<br />
6.BACK FILL<br />
Back fill only with approved free draining material such as `Pit Run' (Backfill<br />
material shall be approved by the local building dept. or a registered<br />
geotechnical Engineer). Prior to backfilling:<br />
1) Ensure the floor system is fully installed as per building code -*INSPECTION<br />
REQUIRED BY ROV CONSULTING. *<br />
2) Obtain Building Dept. authorization for drain tile,dampproofing,etc...<br />
(ROV is not responsible for the approval any back filling material).<br />
5/8"Ø ANC BOLTS<br />
x 8" LG.@ 32" o.c.<br />
3"<br />
APPROVED<br />
BRG. MATERIAL<br />
GRADE<br />
COVER<br />
4-15M VERTS<br />
c/w 12" HOOK<br />
INTO FOOTING<br />
CONTRACTOR TO VERIFY ALL DIMENSIONS<br />
AND TO NOTIFY THIS OFFICE OF ANY<br />
DISCREPANCIES. THIS DRAWING MAY NOT<br />
BE MODIFIED IN ANY MANNER UNLESS WITH<br />
THE CONSENT OF THE DESIGN ENGINEERS.<br />
DO NOT BACK FILL UNTIL THE FLOOR SYSTEM<br />
IS COMPLETELY IN PLACE, AND THEN ONLY<br />
WITH FREE DRAINING SOIL.<br />
THIS DRAWING IS ONLY FOR THE ENGINEERED<br />
PORTIONS NOTED ALL OTHER ASPECTS OF<br />
THE FOUNDATIONS , BOTH INTERIOR AND<br />
EXTERIOR ARE THE RESPONSIBILITY OF THE<br />
PROPER BUILDING AUTHORITIES, AND NOT<br />
ROV CONSULTING.<br />
THICKENED SLAB METHOD<br />
OTHER METHOD<br />
INTERIOR FOOTING SECTION 8<br />
<strong>S1</strong><br />
4"<br />
4<br />
<strong>S1</strong><br />
1'-4"<br />
3'-10"<br />
8"<br />
8"<br />
2-10M CONT. BARS<br />
2"+/- CONC SKIM COAT 2"+/- CONC SKIM COAT<br />
10M TIES @ 8" oc<br />
5/8"Ø ANC BOLTS<br />
x 8" LG.@ 32" o.c.<br />
2-10M CONT BAR<br />
PIER SECTION 5<br />
<strong>S1</strong><br />
10M @ 11"o.c.<br />
1'-4" TYPICAL FOOTING WIDTH U.N.O.<br />
EM2 SHEAR PLATE<br />
PL 150x9.5x200mm<br />
2-16mm STUDS x 100mm<br />
1-10M CONT BAR @<br />
SNAP TIE LOCATION<br />
CONTINUE 2-10M STRIP<br />
FOOTING BARS THROUGH<br />
PAD FOOTING<br />
3-15M EACH WAY<br />
3"<br />
COVER<br />
2"+/- CONC SKIM COAT<br />
CONTRACTOR IS RESPONSIBLE<br />
TO CHECK AND CONFIRM ALL<br />
DIMENSIONS AND ELEVATIONS<br />
ON DRAWINGS.<br />
REVISED FOR ENTRY<br />
2 GLULAMS/CONNECTIONS FEB 8, '10<br />
1<br />
ISSUED FOR PERMIT<br />
SPECIFICATIONS<br />
& DETAILS<br />
1 2" = 1'-0"<br />
TREVOR J.<br />
ROV<br />
FEB 2, '10 <strong>1716</strong><br />
FEB 3, '10<br />
SCUKA ENTERPRISES<br />
881 Highway 33E<br />
Kelowna BC V1X 6V1<br />
Ph: 250-765-0136<br />
Fax: 250-765-7826<br />
E-mail: scukaent@scuka.bc.ca<br />
Foundation Design For:<br />
Mountain View Lodge<br />
320 Veteran's Ave<br />
Lot 1, PlanKAP 37108<br />
<strong>Keremeos</strong>
1<br />
<strong>S1</strong><br />
6<br />
<strong>S1</strong><br />
1<br />
<strong>S1</strong><br />
1<br />
<strong>S1</strong><br />
8<br />
<strong>S1</strong><br />
1<br />
<strong>S1</strong><br />
1<br />
<strong>S1</strong><br />
1<br />
<strong>S1</strong><br />
5<br />
<strong>S1</strong><br />
1<br />
<strong>S1</strong><br />
5<br />
<strong>S1</strong><br />
2<br />
<strong>S1</strong><br />
3<br />
<strong>S1</strong><br />
PAD FTG.<br />
46"x36"x8"<br />
c/w 3-15M e.w.<br />
PIER:<br />
4-15M WALL DOWELS<br />
c/w 10M TIES @ 8" o.c.<br />
PAD FTG.<br />
46"x36"x8"<br />
c/w 3-15M e.w.<br />
PIER:<br />
4-15M WALL DOWELS<br />
c/w 10M TIES @ 8" o.c.<br />
5<br />
<strong>S1</strong><br />
1<br />
<strong>S1</strong><br />
1<br />
<strong>S1</strong><br />
2<br />
<strong>S1</strong><br />
3<br />
<strong>S1</strong><br />
PAD FTG.<br />
46"x36"x8"<br />
c/w 3-15M e.w.<br />
PIER:<br />
4-15M WALL DOWELS<br />
c/w 10M TIES @ 8" o.c.<br />
1<br />
<strong>S1</strong><br />
1<br />
<strong>S1</strong><br />
5<br />
<strong>S1</strong><br />
PAD FTG.<br />
46"x36"x8"<br />
c/w 3-15M e.w.<br />
PIER:<br />
4-15M WALL DOWELS<br />
c/w 10M TIES @ 8" o.c.<br />
2<br />
<strong>S1</strong><br />
3<br />
<strong>S1</strong><br />
5<br />
<strong>S1</strong><br />
1<br />
<strong>S1</strong><br />
PAD FTG.<br />
46"x36"x8"<br />
c/w 3-15M e.w.<br />
PIER:<br />
4-15M WALL DOWELS<br />
c/w 10M TIES @ 8" o.c.<br />
1<br />
<strong>S1</strong><br />
5<br />
<strong>S1</strong><br />
2<br />
<strong>S1</strong><br />
3<br />
<strong>S1</strong><br />
5<br />
<strong>S1</strong><br />
LEGEND<br />
PAD FTG.<br />
46"x36"x8"<br />
c/w 3-15M e.w.<br />
PIER:<br />
4-15M WALL DOWELS<br />
c/w 10M TIES @ 8" o.c.<br />
BUILDING 2 (EAST) FOUNDATION PLAN 1<br />
S2<br />
5<br />
<strong>S1</strong><br />
EM2 SHEAR PLATE<br />
PL 150x9.5x200mm<br />
2-16mm STUDS x 100mm<br />
5<br />
<strong>S1</strong><br />
1<br />
<strong>S1</strong><br />
1<br />
<strong>S1</strong><br />
5<br />
<strong>S1</strong><br />
2<br />
<strong>S1</strong><br />
3<br />
<strong>S1</strong><br />
PAD FTG.<br />
46"x36"x8"<br />
c/w 3-15M e.w.<br />
PIER:<br />
4-15M WALL DOWELS<br />
c/w 10M TIES @ 8" o.c.<br />
5<br />
<strong>S1</strong><br />
1<br />
<strong>S1</strong><br />
1<br />
<strong>S1</strong><br />
2<br />
<strong>S1</strong><br />
3<br />
<strong>S1</strong><br />
PAD FTG.<br />
46"x36"x8"<br />
c/w 3-15M e.w.<br />
PIER:<br />
4-15M WALL DOWELS<br />
c/w 10M TIES @ 8" o.c.<br />
1<br />
<strong>S1</strong><br />
1<br />
<strong>S1</strong><br />
5<br />
<strong>S1</strong><br />
PAD FTG.<br />
46"x36"x8"<br />
c/w 3-15M e.w.<br />
PIER:<br />
4-15M WALL DOWELS<br />
c/w 10M TIES @ 8" o.c.<br />
2<br />
<strong>S1</strong><br />
3<br />
<strong>S1</strong><br />
5<br />
<strong>S1</strong><br />
1<br />
<strong>S1</strong><br />
PAD FTG.<br />
46"x36"x8"<br />
c/w 3-15M e.w.<br />
PIER:<br />
4-15M WALL DOWELS<br />
c/w 10M TIES @ 8" o.c.<br />
1<br />
<strong>S1</strong><br />
5<br />
<strong>S1</strong><br />
2<br />
<strong>S1</strong><br />
PAD FTG.<br />
46"x36"x8"<br />
c/w 3-15M e.w.<br />
PIER:<br />
4-15M WALL DOWELS<br />
c/w 10M TIES @ 8" o.c.<br />
CONTRACTOR IS RESPONSIBLE<br />
TO CHECK AND CONFIRM ALL<br />
DIMENSIONS AND ELEVATIONS<br />
ON DRAWINGS.<br />
REVISED FOR ENTRY<br />
2 GLULAMS/CONNECTIONS FEB 8, '10<br />
1<br />
ISSUED FOR PERMIT<br />
1 4" = 1'-0"<br />
TREVOR J.<br />
ROV<br />
FEB 2, '10 <strong>1716</strong><br />
FEB 3, '10<br />
SCUKA ENTERPRISES<br />
881 Highway 33E<br />
Kelowna BC V1X 6V1<br />
Ph: 250-765-0136<br />
Fax: 250-765-7826<br />
E-mail: scukaent@scuka.bc.ca<br />
Foundation Design For:<br />
Mountain View Lodge<br />
320 Veteran's Ave<br />
Lot 1, PlanKAP 37108<br />
<strong>Keremeos</strong><br />
BUILDING 1 (EAST)<br />
FOUNDATION PLAN
1<br />
<strong>S1</strong><br />
PAD FTG.<br />
46"x36"x8"<br />
c/w 3-15M e.w.<br />
PIER:<br />
4-15M WALL DOWELS<br />
c/w 10M TIES @ 8" o.c.<br />
1<br />
<strong>S1</strong><br />
5<br />
<strong>S1</strong><br />
1<br />
<strong>S1</strong><br />
5<br />
<strong>S1</strong><br />
2<br />
<strong>S1</strong><br />
PAD FTG.<br />
46"x36"x8"<br />
c/w 3-15M e.w.<br />
PIER:<br />
4-15M WALL DOWELS<br />
c/w 10M TIES @ 8" o.c.<br />
PAD FTG.<br />
46"x36"x8"<br />
c/w 3-15M e.w.<br />
PIER:<br />
4-15M WALL DOWELS<br />
c/w 10M TIES @ 8" o.c.<br />
3<br />
<strong>S1</strong><br />
5<br />
<strong>S1</strong><br />
1<br />
<strong>S1</strong><br />
1<br />
<strong>S1</strong><br />
2<br />
<strong>S1</strong><br />
3<br />
<strong>S1</strong><br />
1<br />
<strong>S1</strong><br />
1<br />
<strong>S1</strong><br />
PAD FTG.<br />
46"x36"x8"<br />
c/w 3-15M e.w.<br />
PIER:<br />
4-15M WALL DOWELS<br />
c/w 10M TIES @ 8" o.c.<br />
PAD FTG.<br />
46"x36"x8"<br />
c/w 3-15M e.w.<br />
PIER:<br />
4-15M WALL DOWELS<br />
c/w 10M TIES @ 8" o.c.<br />
5<br />
<strong>S1</strong><br />
2<br />
<strong>S1</strong><br />
3<br />
<strong>S1</strong><br />
5<br />
<strong>S1</strong><br />
1<br />
<strong>S1</strong><br />
1<br />
<strong>S1</strong><br />
5<br />
<strong>S1</strong><br />
PAD FTG.<br />
46"x36"x8"<br />
c/w 3-15M e.w.<br />
PIER:<br />
4-15M WALL DOWELS<br />
c/w 10M TIES @ 8" o.c.<br />
2<br />
<strong>S1</strong><br />
3<br />
<strong>S1</strong><br />
5<br />
<strong>S1</strong><br />
LEGEND<br />
BUILDING 1 (WEST) FOUNDATION PLAN 1<br />
S3<br />
5<br />
<strong>S1</strong><br />
EM2 SHEAR PLATE<br />
PL 150x9.5x200mm<br />
2-16mm STUDS x 100mm<br />
5<br />
<strong>S1</strong><br />
1<br />
<strong>S1</strong><br />
1<br />
<strong>S1</strong><br />
5<br />
<strong>S1</strong><br />
2<br />
<strong>S1</strong><br />
3<br />
<strong>S1</strong><br />
PAD FTG.<br />
46"x36"x8"<br />
c/w 3-15M e.w.<br />
PIER:<br />
4-15M WALL DOWELS<br />
c/w 10M TIES @ 8" o.c.<br />
PAD FTG.<br />
46"x36"x8"<br />
c/w 3-15M e.w.<br />
PIER:<br />
4-15M WALL DOWELS<br />
c/w 10M TIES @ 8" o.c.<br />
5<br />
<strong>S1</strong><br />
1<br />
<strong>S1</strong><br />
1<br />
<strong>S1</strong><br />
2<br />
<strong>S1</strong><br />
3<br />
<strong>S1</strong><br />
1<br />
<strong>S1</strong><br />
PAD FTG.<br />
46"x36"x8"<br />
c/w 3-15M e.w.<br />
PIER:<br />
4-15M WALL DOWELS<br />
c/w 10M TIES @ 8" o.c.<br />
1<br />
<strong>S1</strong><br />
PAD FTG.<br />
46"x36"x8"<br />
c/w 3-15M e.w.<br />
PIER:<br />
4-15M WALL DOWELS<br />
c/w 10M TIES @ 8" o.c.<br />
5<br />
<strong>S1</strong><br />
2<br />
<strong>S1</strong><br />
3<br />
<strong>S1</strong><br />
5<br />
<strong>S1</strong><br />
1<br />
<strong>S1</strong><br />
PAD FTG.<br />
46"x36"x8"<br />
c/w 3-15M e.w.<br />
PIER:<br />
4-15M WALL DOWELS<br />
c/w 10M TIES @ 8" o.c.<br />
1<br />
<strong>S1</strong><br />
5<br />
<strong>S1</strong><br />
2<br />
<strong>S1</strong><br />
2<br />
<strong>S1</strong><br />
8<br />
<strong>S1</strong><br />
1<br />
<strong>S1</strong><br />
2<br />
<strong>S1</strong><br />
1<br />
<strong>S1</strong><br />
6<br />
<strong>S1</strong><br />
CONTRACTOR IS RESPONSIBLE<br />
TO CHECK AND CONFIRM ALL<br />
DIMENSIONS AND ELEVATIONS<br />
ON DRAWINGS.<br />
REVISED FOR ENTRY<br />
2 GLULAMS/CONNECTIONS FEB 8, '10<br />
1<br />
ISSUED FOR PERMIT<br />
1 4" = 1'-0"<br />
TREVOR J.<br />
ROV<br />
FEB 2, '10 <strong>1716</strong><br />
FEB 3, '10<br />
SCUKA ENTERPRISES<br />
881 Highway 33E<br />
Kelowna BC V1X 6V1<br />
Ph: 250-765-0136<br />
Fax: 250-765-7826<br />
E-mail: scukaent@scuka.bc.ca<br />
Foundation Design For:<br />
Mountain View Lodge<br />
320 Veteran's Ave<br />
Lot 1, PlanKAP 37108<br />
<strong>Keremeos</strong><br />
BUILDING 2 (WEST)<br />
FOUNDATION PLAN
2<br />
S4<br />
C78<br />
ROOF TRUSSES<br />
@24"o.c.<br />
B1 B1<br />
B1<br />
B1<br />
B1<br />
2<br />
S4<br />
ROOF TRUSSES<br />
@24"o.c.<br />
ROOF TRUSSES<br />
@24"o.c.<br />
C78 C78<br />
3<br />
S4<br />
12<br />
3<br />
S4<br />
3<br />
B1<br />
2<br />
S4<br />
2<br />
S4<br />
SIDE VIEW<br />
C78<br />
ENTRY GLULAM BEAM AND<br />
COLUMN CONNECTIONS<br />
SCALE: 1 2" = 1'-0"<br />
C78<br />
B1<br />
2<br />
S4<br />
4<br />
S4<br />
EM2 SHEAR PLATE<br />
PL 150x9.5x200mm<br />
2-16mm STUDS x 100mm<br />
2<br />
S4<br />
C78<br />
B1<br />
TOP VIEW<br />
2<br />
S4<br />
ROOF TRUSSES<br />
@24"o.c.<br />
1'-4 9 16"<br />
1 1 2"<br />
3 3 4"<br />
6 1 16"<br />
3 3 4"<br />
1 1 2"<br />
1 1 2" 3" 1 1 2"<br />
1 4" BEAM TO COLUMN KNIFE<br />
PLATE<br />
SCALE: 1" = 1'-0"<br />
6"<br />
C78<br />
B1<br />
3<br />
S4<br />
2<br />
S4<br />
C78<br />
B1<br />
2<br />
2<br />
S4<br />
S4<br />
C78<br />
6 3 4"<br />
C78<br />
B1<br />
2<br />
S4<br />
ROOF TRUSSES<br />
@24"o.c.<br />
C78<br />
ROOF TRUSSES<br />
@24"o.c.<br />
BUILDING 2 (EAST) FOUNDATION PLAN 1<br />
S4<br />
1 1 2"<br />
3 3 4"<br />
1 1 2"<br />
B1<br />
C78<br />
C78<br />
BEAM SCHEDULE<br />
B1 6 3 4"x10 1 2" GLULAM-EX, D.FIR-L, 20f-EX EXPOSED BEAM<br />
COLUMN SCHEDULE<br />
C78 6 3 4"x7 1 2" GLULAM-C, D.FIR-L, 16C-E EXPOSED COLUMN<br />
1 2" 31 5"<br />
2" 1<br />
4"<br />
2<br />
S4<br />
NOTE: 3-PLY 2x10 SPF #2 OR<br />
2-PLY 9 1 2" LVL MINIMUM BACKING<br />
IS REQUIRED IN THE MOBILE<br />
HOME UNITS AT ALL GLULAM<br />
BEAM TO BUILDING LOCATIONS.<br />
1 1 2"<br />
3 3 4"<br />
1 1 2"<br />
1 1 2"<br />
2<br />
S4<br />
1 1 2" 1 1 2"<br />
6 1 4"<br />
1 4"<br />
1 1 2"<br />
1 4" BEAM KNIFE PLATE HANGER<br />
SCALE: 1" = 1'-0"<br />
1 4"<br />
3 1 2"<br />
1 1 2"<br />
5"<br />
4<br />
S4<br />
B1<br />
2<br />
S4<br />
2<br />
S4<br />
C78<br />
1 4"<br />
B1<br />
7 3 4"<br />
2 3 4"<br />
C78<br />
B1<br />
6"<br />
ROOF TRUSSES<br />
@24"o.c.<br />
2<br />
S4<br />
1 1 2" 3" 1 1 2"<br />
C78<br />
1 1 2"<br />
3 3 4"<br />
2 1 2"<br />
2 3 4"<br />
B1<br />
1 4"<br />
2<br />
S4<br />
ROOF TRUSSES<br />
@24"o.c.<br />
1 4"<br />
1 9 16" 1 9 16"<br />
SIDE VIEW SIDE VIEW TOP VIEW SIDE VIEW FRONT VIEW<br />
1 4" COLUMN BASE KNIFE PLATE<br />
SCALE: 1" = 1'-0"<br />
2 1 2" 3 3 4" 1 1 2"<br />
2 3 4"<br />
1 4"<br />
5<br />
S4<br />
C78<br />
B1<br />
2<br />
S4<br />
C78<br />
B1<br />
2<br />
S4<br />
2<br />
S4<br />
C78<br />
NOTE:<br />
-CONTRACTOR TO CONFIRM ALL GLULAM MEMBER<br />
LENGTHS AND DIMENSIONS WITH ARCHITECTURAL<br />
PLANS.<br />
-MINIMUM PLATE AND BOLT SPACING SHOWN IN ALL<br />
CROSS SECTIONS. HAVE FINAL CHANGES TO PLATE<br />
DESIGNS APPROVED BY ROV CONSULTING INC. PRIOR<br />
TO CONSTRUCTION.<br />
-ALL PLATE MATERIAL IS 1 4" G40.21M 300W STEEL<br />
MINIMUM, UNLESS NOTED.<br />
-ALL BOLTS ARE 3 4"Ø A307 MACHINE BOLTS THROUGH<br />
STEEL KNIFE PLATE AND WOOD MEMBER ON EITHER<br />
SIDE.<br />
USE 3"Ø WASHERS WHERE BOLTS ARE SPACED MORE<br />
THAN 1 1 2" APART. USE MINIMUM REQUIRED WASHERS<br />
EVERYWHERE ELSE (2"Ø).<br />
-ALL CUTS TO WOOD ELEMENTS AND STEEL PLATES TO<br />
BE CLEAN AND NEAT, AS THEY ARE EXPOSED<br />
THROUGHOUT.<br />
B1<br />
ROOF TRUSSES<br />
@24"o.c.<br />
B1<br />
2<br />
S4<br />
ROOF TRUSSES<br />
@24"o.c.<br />
S4<br />
C78<br />
B1<br />
C78 C78<br />
2<br />
B1<br />
2<br />
S4<br />
CONTRACTOR IS RESPONSIBLE<br />
TO CHECK AND CONFIRM ALL<br />
DIMENSIONS AND ELEVATIONS<br />
ON DRAWINGS.<br />
REVISED FOR ENTRY<br />
2 GLULAMS/CONNECTIONS FEB 8, '10<br />
1<br />
ISSUED FOR PERMIT<br />
1 4" = 1'-0"<br />
TREVOR J.<br />
ROV<br />
FEB 2, '10 <strong>1716</strong><br />
FEB 3, '10<br />
SCUKA ENTERPRISES<br />
881 Highway 33E<br />
Kelowna BC V1X 6V1<br />
Ph: 250-765-0136<br />
Fax: 250-765-7826<br />
E-mail: scukaent@scuka.bc.ca<br />
Foundation Design For:<br />
Mountain View Lodge<br />
320 Veteran's Ave<br />
Lot 1, PlanKAP 37108<br />
<strong>Keremeos</strong><br />
BUILDING 1 (EAST)<br />
ROOF PLAN AND ENTRY<br />
CONNECTIONS
2<br />
S4<br />
B1 B1 B1 B1 B1<br />
B1 B1 B1<br />
C78<br />
ROOF TRUSSES<br />
@24"o.c.<br />
C78 C78 C78 C78 C78 C78 C78 C78<br />
2<br />
S4<br />
ROOF TRUSSES<br />
@24"o.c.<br />
B1 B1<br />
C78<br />
2<br />
S4<br />
2<br />
S4<br />
C78<br />
B1<br />
2<br />
S4<br />
C78<br />
B1<br />
2<br />
S4<br />
ROOF TRUSSES<br />
@24"o.c.<br />
ROOF TRUSSES<br />
@24"o.c.<br />
2<br />
S4<br />
C78 C78<br />
B1 B1<br />
2<br />
S4<br />
2<br />
S4<br />
ROOF TRUSSES<br />
@24"o.c.<br />
2<br />
S4<br />
2<br />
S4<br />
ROOF TRUSSES<br />
@24"o.c.<br />
C78 C78<br />
B1 B1<br />
BEAM SCHEDULE<br />
B1 6 3 4"x10 1 2" GLULAM-EX, D.FIR-L, 20f-EX EXPOSED BEAM<br />
COLUMN SCHEDULE<br />
C78 6 3 4"x7 1 2" GLULAM-C, D.FIR-L, 16C-E EXPOSED COLUMN<br />
BUILDING 1 (WEST) FOUNDATION PLAN 1<br />
S5<br />
2<br />
S4<br />
2<br />
S4<br />
2<br />
S4<br />
2<br />
S4<br />
2<br />
S4<br />
C78 C78 C78 C78<br />
B1 B1 B1 B1<br />
ROOF TRUSSES<br />
@24"o.c.<br />
2<br />
S4<br />
2<br />
S4<br />
2<br />
S4<br />
C78<br />
ROOF TRUSSES<br />
@24"o.c.<br />
2<br />
S4<br />
ROOF TRUSSES<br />
@24"o.c.<br />
2<br />
S4<br />
B1 B1<br />
ROOF TRUSSES<br />
@24"o.c.<br />
C78<br />
2<br />
S4<br />
CONTRACTOR IS RESPONSIBLE<br />
TO CHECK AND CONFIRM ALL<br />
DIMENSIONS AND ELEVATIONS<br />
ON DRAWINGS.<br />
REVISED FOR ENTRY<br />
2 GLULAMS/CONNECTIONS FEB 8, '10<br />
1<br />
ISSUED FOR PERMIT<br />
1 4" = 1'-0"<br />
TREVOR J.<br />
ROV<br />
FEB 2, '10 <strong>1716</strong><br />
FEB 3, '10<br />
SCUKA ENTERPRISES<br />
881 Highway 33E<br />
Kelowna BC V1X 6V1<br />
Ph: 250-765-0136<br />
Fax: 250-765-7826<br />
E-mail: scukaent@scuka.bc.ca<br />
Foundation Design For:<br />
Mountain View Lodge<br />
320 Veteran's Ave<br />
Lot 1, PlanKAP 37108<br />
<strong>Keremeos</strong><br />
BUILDING 2 (WEST)<br />
ROOF PLAN