STRUCTURAL NOTES - THIS BUILDING IS DESIGNED UNDER PART 9 OF THE BCBC (HOUSING & SMALL BUILDINGS)<br />

1.<br />

2.<br />

2.1<br />

THESE INCLUDE THE FOLLOWING :<br />

REFERENCE GEOTECHNICAL REPORT _________ DATED<br />

2.2 NO FOUNDATIONS MAY BE POURED BEFORE BEARING MATERIAL HAS BEEN<br />

APPROVED BY THE GEOTECHNICAL ENGINEER. CONTRACTOR TO NOTIFY<br />

SOILS ENGINEER MINIMUM 48 HOURS BEFORE CONCRETE POUR.<br />

2.3 THE BASE OF THE FOUNDATIONS SHALL BE PROTECTED AGAINST RAIN, SNOW,<br />

FROST AND ANY WATER INFILTRATION.<br />

2.4 ALL FOOTINGS SHALL BE FORMED AS INDICATED ON THE FOUNDATION PLANS<br />

IN ACCORDANCE TO THE RECOMMENDATIONS OF THE GEOTECHNICAL ENGINEER.<br />

2.5<br />

CENTRE ALL FOOTINGS UNDER COLUMNS AND WALLS UNLESS OTHERWISE NOTED.<br />

2.6 FOOTINGS HAVE BEEN DESIGNED FOR AN ALLOWABLE BEARING<br />

PRESSURE OF 2000 PSF ( 100 KPa ) AS STATED IN SOILS REPORT.<br />

2.7 SEE SOILS REPORT FOR PREPARATION OF SUBGRADE.<br />

2.8<br />

3.<br />

GENERAL<br />

1.1 THE NOTES AND SPECIFICATIONS GIVEN ON THE STRUCTURAL DRAWINGS<br />

ARE TO BE READ IN CONJUNCTION WITH THESE NOTES. THEY ARE NEITHER<br />

COMPLETE NOR DO THEY REPLACE THE CONTRACT SPECIFICATIONS.<br />

1.2 THESE DRAWINGS SHALL BE READ IN CONJUNCTION WITH THE DRAWINGS AND<br />

SPECIFICATIONS OF ALL OTHER CONSULTANTS.<br />

ANY DISCREPANCIES NOTED SHALL BE REPORTED IMMEDIATELY<br />

FOR CLARIFICATION.<br />

1.3 THIS BUILDING HAS BEEN DESIGNED FOR WIND AND SEISMIC FORCES IN<br />

ACCORDANCE WITH THE PROVISIONS SET FORTH IN THE B.C. BUILDING CODE 2006.<br />

1.4<br />

1.5<br />

1.6<br />

SEISMIC DATA :<br />

* TIMBER STRUCTURE DESIGNED AND DETAILED ACCORDING TO CAN/CSA-086<br />

TYPE OF SFRS - NAILED SHEAR WALLS, TABLE 4.1.8.9<br />

DEAD LOADS ( SPECIFIED ) (SUPERIMPOSED)<br />

ROOF<br />

FLOORS<br />

LIVE LOADS ( SPECIFIED )<br />

GROUND SNOW Ss<br />

ROOF SNOW<br />

RAIN Sr<br />

DESIGN LOAD<br />

MAIN FLOOR<br />

WIND LOADS<br />

1.71<br />

1.72<br />

1.73<br />

1.74<br />

1.75<br />

PREPARED BY ___________<br />

CONCRETE<br />

STRUCTURAL STEEL ELEMENTS (HAMBRO)<br />

WOOD I-JOISTS<br />

ROOF TRUSSES<br />

HANGERS & TIEDOWNS<br />

Sa(0.2) = 0.28<br />

Sa(0.5) = 0.17<br />

Sa(1.0) = 0.094<br />

Sa(2.0) = 0.056<br />

PGA = 0.14<br />

GLU-LAM & PSL WOOD BEAMS<br />

= 10 PSF<br />

= 10 PSF<br />

= 60.60 PSF<br />

= 33.33 PSF<br />

= 2.1 PSF<br />

= 35.43 PSF<br />

= 40 PSF<br />

FOUNDATION AND SITE WORK<br />

Rd =<br />

Ro = 1.7*<br />

Fa = 1.0<br />

Fv = 1.0<br />

1.7 MANUFACTURERS OF ALL STRUCTURAL COMPONENTS SHALL SUBMIT SHOP<br />

DRAWINGS SEALED BY A PROFESSIONAL ENGINEER REGISTERED IN<br />

BRITISH COLUMBIA FOR REVIEW & APPROVAL PRIOR TO FABRICATION.<br />

PERIMETER FOOTING DRAINAGE - SEE MECHANICAL DRAWINGS.<br />

3.1 ALL CONCRETE WORK SHALL COMPLY WITH THE REQUIREMENTS<br />

OF CSA STANDARD A23.3-04. CONCRETE STRENGTHS TO BE<br />

VERIFIED BY INDEPENDENT TESTS TO CSA A23. AT THE<br />

EXPENSE OF THE CONTRACTOR. A MINIMUM OF 3 TEST CYLINDERS SHALL<br />

BE CAST FOR EACH 100 CUBIC METERS OR EACH DAYS POUR WHICHEVER<br />

IS LESS, WITH COPIES SUBMITTED TO THE ENGINEER.<br />

I =<br />

.478<br />

.478<br />

2.90<br />

1.60<br />

.11<br />

1.70<br />

1.9<br />

1/10 = 7.1 PSF .34<br />

1/50 = 9.8 PSF .47<br />

3*<br />

1<br />

kN/m2<br />

kN/m2<br />

kN/m2<br />

kN/m2<br />

kN/m2<br />

kN/m2<br />

kN/m2<br />

kN/m2<br />

kN/m2<br />

3.2<br />

3.3 CEMENT SHALL BE TYPE 10 TO CAN/CSA-A23.3-04 ALTERNATE 1<br />

3.4 ALL COLD OR HOT WEATHER CONCRETE WORK SHALL CONFORM TO<br />

CSA-A23.3-04.<br />

3.5 REINFORCING BARS SHALL BE BILLET STEEL BARS CONFORMING TO<br />

CSA G30.18-M92 GRADE 400. WELDED WIRE MESH SHALL CONFORM TO<br />

CSA G30.5-R1991. LAPS SHALL INCLUDE TWO CROSS WIRES PLUS 2" ( 50.8mm ).<br />

3.6<br />

3.7<br />

3.8<br />

3.9<br />

3.10<br />

EXPOSED TO SOIL OR WEATHER, 20M AND LARGER<br />

EXPOSED TO SOIL OR WEATHER, 15M AND SMALLER<br />

WALLS AND SURFACES OF SUSPENDED SLABS<br />

BOTTOM SURFACES OF SUSPENDED SLABS<br />

NOTIFY ENGINEER MINIMUM 24 HOURS PRIOR TO ANY POUR.<br />

3.11 PLACE REINFORCING BARS SYMMETRICALLY OVER SUPPORTS AND<br />

SYMMETRICALLY IN SPANS UNLESS OTHERWISE NOTED.<br />

3.12 ALL DOWELS AND ANCHOR BOLTS SHALL BE PLACED BEFORE<br />

THE CONCRETE IS POURED. TEMPLATES SHALL BE USED TO<br />

ENSURE CORRECT PLACEMENT.<br />

3.13 WALLS AND COLUMNS :<br />

3.14<br />

6.<br />

6.1<br />

6.2<br />

6.3<br />

6.4<br />

6.5<br />

6.6<br />

7.<br />

7.1<br />

7.2<br />

7.3<br />

7.4<br />

ALL CONCRETE SHALL HAVE A 28 DAY COMPRESSIVE STRENGTH OF :<br />

GRADE BEAMS<br />

FOUNDATION WALLS<br />

COLUMNS<br />

SUSPENDED SLAB<br />

TILT-UP<br />

LOCATION<br />

S.O.G. : - INTERIOR<br />

FOOTINGS<br />

COLUMNS<br />

BEAMS<br />

- EXTERIOR<br />

LAP SPLICE REINFORCEMENT AS FOLLOWS ( UNLESS OTHERWISE NOTED ) :<br />

WIRE MESH<br />

10M<br />

15M<br />

20M<br />

25M<br />

12"<br />

18"<br />

26"<br />

30"<br />

50"<br />

STAGGER SPLICES IN WALLS AND SLABS.<br />

DESIGNATION OF REINFORCING BARS :<br />

3-10M36 MEANS THREE 10M BARS 36" ( 914 mm ) LONG<br />

2-C10M10' MEANS 2 1OM BARS, EACH END WITH A 90 DEGREE<br />

STANDARD HOOK AN A TOTAL LENGTH OF 10' ( 3048 mm ).<br />

STEEL SHALL BE PLACED ACCORDING TO "THE MANUAL OF STANDARD<br />

PRACTICE" OF THE REINFORCING INSTITUTE OF ONTARIO, 4TH EDITION 1990<br />

WELDING OF REINFORCING IS NOT PERMITTED WITHOUT WRITTEN APPROVAL<br />

CLEAR COVER FOR REINFORCEMENT :<br />

CAST AGAINST SOIL<br />

3" 76<br />

2" 51<br />

1 1/2" 38<br />

1" 25<br />

1" 25<br />

2" 50<br />

1" 25<br />

3.13.1 WALLS AND COLUMNS SHALL NOT BE POURED HIGHER THAN THE<br />

UNDERSIDE OF THE MEMBER SUPPORTED. ANY EXTRA HEIGHT<br />

SHALL BE REMOVED BEFORE POURING THE NEXT LEVEL.<br />

( mm )<br />

3.13.2 PROVIDE 10M CORNER BARS FOR THE LESSER AMOUNT OF<br />

HORIZONTAL WALL REINFORCING AT ALL CONCRETE / CONCRETE<br />

AND CONCRETE / BLOCK WALL INTERSECTIONS UNLESS HORIZONTAL<br />

REINFORCEMENT IS HOOKED AS SHOWN IN THE TYPICAL DETAILS.<br />

REFER TO ARCHITECTURAL DETAILS FOR ALL SLAB DEPRESSIONS, FALLS, ETC.<br />

WOOD FRAMING<br />

STRENGTH<br />

PSI (mPa)<br />

3600<br />

5000<br />

3600<br />

3600<br />

3600<br />

5000<br />

5000<br />

5000<br />

25<br />

35<br />

( )<br />

( )<br />

( 25 )<br />

( 25 )<br />

( )<br />

25<br />

( 35 )<br />

( 35 )<br />

( 35 )<br />

( 305 mm )<br />

( 457 mm )<br />

( 660 mm )<br />

( 762 mm )<br />

( 1270mm<br />

)<br />

AIR %<br />

4 - 8<br />

4 - 8<br />

1 - 4<br />

4 - 7<br />

4 - 7<br />

4 - 7<br />

4 - 7<br />

DENOTES TOP BARS<br />

DENOTES BOTTOM BARS<br />

ALL DIMENSIONAL LUMBER TO BE #2 SPF OR BETTER,<br />

WALL STUDS MUST BE #2 SPF OR BETTER.<br />

SLUMP<br />

+20 mm<br />

70<br />

70<br />

70<br />

60<br />

60<br />

60<br />

60<br />

ALL SUBFLOORING TO BE 5/8" ( 16mm ) PLYWOOD CSA 021 DOUGLAS FIR,<br />

PHENOLIC BONDED OR GOLD EDGE, UNLESS INDICATED OTHERWISE.<br />

EXPOSURE<br />

CLASS<br />

C2<br />

F2<br />

F2<br />

F2<br />

( mm )<br />

( mm )<br />

( mm )<br />

( mm )<br />

( mm )<br />

( mm )<br />

ROOF SHEATHING TO BE 1/2" ( 12 mm ) PLYWOOD CSA 021 DOUGLAS FIR,<br />

PHENOLIC BONDED.<br />

SHEATHING TO HAVE SURFACE GRAINS AT RIGHT ANGLES TO FRAMING<br />

WITH 1/16" ( 1.5mm ) GAP BETWEEN BUTTING ENDS.<br />

ALL CROSS BRIDGING TO BE 2 x 2 @ 6' O.C. ( 38mm x 38mm @ 1800mm ) OR<br />

IN ACCORDANCE WITH JOIST MANUFACTURERS SPECIFICATIONS.<br />

ALL LINTELS TO BE 2 - 2 x 10 ( 38mm x 2866mm ) #2 SPF UNLESS INDICATED<br />

OTHERWISE.<br />

GLUE LAMINATED MEMBERS<br />

GLUE LAMINATED MEMBERS SHALL BE FABRICATED BY A PLANT CONFORMING<br />

TO CSA 0177-M89 (R2003) "QUALIFICATION CODE FOR MANUFACTURERS OF GLUE<br />

LAMINATED TIMBER".<br />

STRESS GRADES : 24f-E BENDING GRADES, UNLESS INDICATED ELSEWHERE.<br />

COLUMN GRADES : 16c-E COMPRESSION GRADES, UNLESS INDICATED ELSEWHERE.<br />

GENERAL CONTRACTOR TO SUBMIT ALL PERTINENT DRAWINGS AND DESIGN<br />

INFORMATION TO MANUFACTURER, INCLUDING ANY PERTINENT MECHANICAL<br />

AND ELECTRICAL EQUIPMENT THAT WOULD AFFECT BEAM DESIGN.<br />

MANUFACTURER / CONTRACTOR TO SUBMIT SHOP DRAWINGS TO DESIGN<br />

AUTHORITY, STRUCTURAL ENGINEER FOR APPROVAL PRIOR TO MANUFACTURER.<br />

8.<br />

8.1<br />

8.2<br />

8.3 ALL PERTINENT DRAWINGS AND DESIGN INFORMATION THAT MAY AFFECT<br />

TRUSSES / M.J.'S DESIGN MUST ALSO BE SUBMITTED TO THE GENERAL CONTRACTOR /<br />

SUBCONTRACTORS TO THE TRUSS MANUFACTURER. IN PARTICULAR MECHANICAL,<br />

PLUMBING AND ELECTRICAL DRAWINGS INDICATING SPECIALIZED FIXTURES<br />

WITH ARCHITECTURAL AND STRUCTURAL DRAWINGS.<br />

8.4<br />

8.5<br />

19.<br />

9.1<br />

9.2<br />

9.3<br />

10.<br />

10.1<br />

11.<br />

11.1<br />

TRUSSES AND FLOOR JOISTS<br />

TRUSS / MANUFACTURED JOISTS ( M.J.'S ) AND SPACING AS INDICATED ON<br />

DRAWINGS ARE FOR REFERENCE ONLY. THESE DRAWINGS DO NOT COVER<br />

TRUSS / M.J.'S DESIGN. THE OWNER / CONTRACTOR IS RESPONSIBLE FOR HAVING<br />

THE TRUSSES / M.J.'S CONNECTION DETAILS AND ERECTION BRACING SYSTEM ETC.<br />

DESIGNED IN ACCORDANCE TO THE B.C. BUILDING CODE 1998, AND<br />

MANUFACTURERS SPECIFICATIONS.<br />

TRUSSES / M.J.'S TO BE DESIGNED FOR LOADS UNDER "DESIGN LOADS SECTIONS".<br />

THE GENERAL CONTRACTOR WITH RESPECT TO MECHANICAL EQUIPMENT MUST<br />

CONFIRM WITH BOTH THE STRUCTURAL ENGINEER AND TRUSS MANUFACTURER,<br />

ALL INFORMATION RELATING TO LOCATION, WEIGHT AND CLEARANCE REQUIRED<br />

FOR DUCTS AND SPECIALIZED EQUIPMENT.<br />

MANUFACTURER MUST SUBMIT SHOP DRAWINGS FOR PLAN CHECK AND APPROVAL,<br />

TO STRUCTURAL ENGINEER. DESIGN AUTHORITY AND WHERE APPLICABLE THE<br />

MECHANICAL ENGINEER AND / OR MECHANICAL CONTRACTOR AND ELECTRICAL<br />

ENGINEER AND / OR ELECTRICAL CONTRACTOR.<br />

EMBEDDED CONDUITS, PIPES & SLEEVES<br />

EXCEPT WHEN APPROVED BY THE STRUCTURAL ENGINEER,<br />

PIPES CONDUITS AND SLEEVES EMBEDDED IN CONCRETE<br />

SHALL BE INSTALLED IN ACCORDANCE WITH THE FOLLOWING GUIDELINES :<br />

9.1.1<br />

9.1.2<br />

9.1.3<br />

9.1.4<br />

1'-0"<br />

LAP<br />

COMPACTED FILLS<br />

APPROVED BY THE<br />

PROJECT GEOTECH<br />

DRILL INTO SIDE WALLS<br />

A MIN. OF 4" THEN HILTI<br />

HIT EPOXY THE 15M BARS<br />

TO THE WALLS<br />

4"<br />

8"<br />

CENTRELINE SPACING TO BE NOT LESS THAN 3 DIAMETERS.<br />

CENTRELINE SPACING BETWEEN PARALLEL CONDUIT<br />

AND REINFORCING TO BE NOT LESS THAN 3 DIAMETERS<br />

OUTSIDE DIAMETER TO BE NOT GREATER THAN ONE THIRD THE<br />

THICKNESS OF THE SLAB FOR ONE LAYER AND ONE FOURTH<br />

THE THICKNESS FOR TWO LAYERS.<br />

CONCRETE COVER TO BE NOT LESS THAN 2" ( 51 mm ) AND PIPES OR<br />

CONDUIT TO BE LOCATED BETWEEN THE TOP AND BOTTOM LAYER<br />

OF REINFORCEMENT.<br />

MAXIMUM SIZE OF PIPE OR CONDUIT IN CONCRETE TOPPING ON STEEL DECKING<br />

TO BE 3/4" ( 19 mm ).<br />

PIPE OR CONDUIT IN CONCRETE TOPPING ON STEEL DECK MAY BE PLACED IN<br />

ONE LAYER ONLY ( NO CROSSING ) AND MAY BE DIRECTLY SCREWED TO<br />

STEEL DECKING IN ACCORDANCE WITH 6.1.1 ABOVE.<br />

INSPECTIONS AND TESTING<br />

NOTIFY THE ENGINEER 24 HOURS IN ADVANCE ( 48 HOURS OVER 100 KM<br />

FROM KELOWNA ) FOR INSPECTION OF THE FOLLOWING :<br />

REINFORCING STEEL PRIOR TO EACH CONCRETE POUR AND MASONRY<br />

REINFORCEMENT PRIOR TO EACH GROUT POUR.<br />

STRUCTURAL STEEL PRIOR TO CONCEALMENT<br />

WOOD FRAMING PRIOR TO CONCEALMENT<br />

TEMPORARY SHORING<br />

TEMPORARY SHORING DRAWINGS MUST BE SEALED BY A<br />

STRUCTURAL ENGINEER. DRAWING MUST BE SUBMITTED FOR<br />

APPROVAL PRIOR TO FORMING ANY SUSPENDED SLAB<br />

OR SUPPORTING ANY EXISTING STRUCTURAL MEMBERS<br />

PRIOR TO REMOVING WALLS, BEAMS AND ETC.<br />

10M@12" o.c.,B/W<br />

APPROVED<br />

BUILDING<br />

MATERIAL<br />

MAX. SLOPE<br />

15M @ 16" O/C E/W<br />

4"<br />

APPROVED BEARING MATERIAL<br />

15M DOWELS LAPPED WITH REINF.<br />

AND DRILLED & GROUTED 2" INTO<br />

SLAB-ON-GRADE<br />

15M(@NOSING)<br />

3"<br />

FROST WALL REQUIRED<br />

ONLY @ EXTERIOR<br />

LOCATIONS SEE PLAN<br />

TYP. STAIR ON GRADE 11<br />

<strong>S1</strong><br />

REFER TO DETAILS FOR<br />

FOOTING REINFORCING<br />

AND WALL DOWELS.<br />

T.O.FOOTING<br />

MIN 2'-0" FROST COVER<br />

SLAB or GRADE<br />

MIN. FROST COVER AS PER CODE<br />

VERIFY w/ GEOTECH REGARDING<br />

SOIL FROST SUSCEPTIBILITY,<br />

AND / OR POSSIBILITY<br />

OF DEEPER FOOTINGS.<br />

1'-6"MIN - 4'-0" MAX<br />

TYP. STEPPED<br />

FOOTING DET.<br />

SPLICE<br />

AS PER<br />

GENERAL NOTES<br />

12<br />

<strong>S1</strong><br />

2'-0"<br />

5/8"Ø ANC BOLTS<br />

x 8" LG.@ 32" o.c.<br />

2-10M CONT BAR<br />

1-10M CONT BAR @<br />

SNAP TIE LOCATION<br />

2-10M CONT BAR<br />

27"<br />

BASEMENT WALL<br />

27"<br />

6"<br />

10M WALL<br />

DOWELS @ 24" oc<br />

6"<br />

10M WALL DOWELS @ 36" oc<br />

8"<br />

MINIMUM EXACAVATION REQ'D<br />

WHEN SOIL IS SILTY CLAY TYPE.<br />

DISREGARD WHEN SOILS ARE OF<br />

THE SANDY GRAVEL TYPE.<br />

(GEOTECH TO VERIFY SOILS)<br />

2"+/- CONC SKIM COAT<br />

2"+/- CONC SKIM COAT<br />

SITE EXCAVATION MUST CONFORM<br />

WITH "WCB" REGULATIONS. THE<br />

CONTRACTOR IS SOLELY<br />

RESPONSIBLE FOR ALL SITE<br />

EXCAVATION, AS WELL AS ANY<br />

TRENCH OR SLOPE SHORING.<br />

10M TIES @ 8" oc<br />

4-15M VERTS<br />

c/w 12" HOOK<br />

INTO FOOTING<br />

3-15M EACH WAY<br />

2'-0"<br />

5/8"Ø ANC BOLTS<br />

x 8" LG.@ 32" o.c.<br />

1-10M CONT BAR @<br />

SNAP TIE LOCATION<br />

2-10M CONT. BARS<br />

3"<br />

COVER<br />

APPROVED<br />

BRG. MATERIAL<br />

8"<br />

1'-4"<br />

TYPICAL FOOTING<br />

WIDTH U.N.O.<br />

GRADE<br />

2-10M CONT BAR<br />

FOUNDATION DRAIN<br />

TILE BY OTHERS<br />

8"<br />

2'-0"<br />

2'-8"<br />

FOUNDATION WALL SECTION 1<br />

<strong>S1</strong><br />

5/8"Ø ANC BOLTS<br />

x 8" LG.@ 24" o.c.<br />

1-10M CONT BAR @<br />

SNAP TIE LOCATION<br />

2-10M CONT. BARS<br />

3"<br />

COVER<br />

APPROVED<br />

BRG. MATERIAL<br />

1'-4"<br />

2-10M CONT BAR<br />

FOUNDATION WALL SECTION 2<br />

<strong>S1</strong><br />

10" MIN<br />

3'-0"<br />

APPROVED<br />

BRG. MATERIAL<br />

GRADE<br />

6"<br />

TYPICAL FOOTING<br />

WIDTH U.N.O.<br />

FOUNDATION WALL @ OPENING 3<br />

<strong>S1</strong><br />

FOUNDATION DRAIN<br />

TILE BY OTHERS<br />

24"<br />

10M CORNER BAR<br />

24"<br />

TYP. CORNER DETAIL 6<br />

<strong>S1</strong><br />

10M STIRRUPS @10" o.c.<br />

VERT BARS<br />

HORZ BARS<br />

2'-0" 4'-0" +/- OPENING 2'-0"<br />

REBAR TO EXTEND MIN 2'-0" IN EACH DIRECTION<br />

PAST THE OPENING OR OVER THE DROP.<br />

GRADE BEAM SECTION 7<br />

<strong>S1</strong><br />

FOOTING<br />

PIER SECTION 4<br />

<strong>S1</strong><br />

8"<br />

OUTSIDE<br />

2'-0" MIN<br />

3"<br />

COVER<br />

2'-0"<br />

8"<br />

EM2 SHEAR PLATE<br />

PL 150x9.5x200mm<br />

2-16mm STUDS x 100mm<br />

SITE EXCAVATION MUST CONFORM<br />

WITH "WCB" REGULATIONS. THE<br />

CONTRACTOR IS SOLELY<br />

RESPONSIBLE FOR ALL SITE<br />

EXCAVATION, AS WELL AS ANY<br />

TRENCH OR SLOPE SHORING.<br />

MINIMUM EXACAVATION REQ'D<br />

WHEN SOIL IS SILTY CLAY TYPE.<br />

DISREGARD WHEN SOILS ARE OF<br />

THE SANDY GRAVEL TYPE.<br />

(GEOTECH TO VERIFY SOILS)<br />

2"+/- CONC SKIM COAT<br />

2@ 43" +/-<br />

2@ 47" +/-<br />

FOUNDATION DRAIN<br />

TILE BY OTHERS<br />

10M WALL DOWELS ON<br />

EITHER SIDE OF OPENINGS<br />

3' LONG 10M BARS @<br />

45° IN THE CORNERS OF<br />

OPENINGS<br />

10M WALL DOWELS @ 24"o.c.<br />

8"<br />

16"x8" TYPICAL FOOTING<br />

WIDTH U.N.O.<br />

2-15M CONT<br />

BARS TOP AND<br />

BOTTOM TO<br />

EXTEND PAST<br />

OPENING A MIN.<br />

OF 24" (TYP.)<br />

12"<br />

4-15M VERTS<br />

IMPORTANT SOILS INFORMATION<br />

INFORMATION, VERIFICATION, AND<br />

CERTIFICATION OF SOIL ISSUES<br />

SUCH AS, BUT NOT LIMITED TO:<br />

SOIL BEARING CAPACITIES, COM-<br />

PACTING, ETC..., ARE THE RESPON-<br />

SIBILITY OF THE LOCAL BUILDING<br />

DEPARTMENT , OR A REGISTERED<br />

GEOTECHNICAL ENG.<br />

ROV CANNOT BE HELD ACCOUNT-<br />

ABLE FOR ANY SOILS RELATED<br />

ISSUES AT ANY TIME (PRESENT<br />

OR FUTURE).<br />

SITE EXCAVATION MUST CONFORM<br />

WITH "WCB" REGULATIONS. THE<br />

CONTRACTOR IS SOLELY<br />

RESPONSIBLE FOR ALL SITE<br />

EXCAVATION, AS WELL AS ANY<br />

TRENCH OR SLOPE SHORING.<br />

2'-0" MIN<br />

8"<br />

MINIMUM EXACAVATION REQ'D<br />

WHEN SOIL IS SILTY CLAY TYPE.<br />

DISREGARD WHEN SOILS ARE OF<br />

THE SANDY GRAVEL TYPE.<br />

(GEOTECH TO VERIFY SOILS)<br />

2'-0"<br />

STRUCTURAL NOTES:<br />

GENERAL:<br />

The following notes apply in general, notes specified on the drawing govern,<br />

and in no way limit the reminder of these notes.<br />

DESIGN:<br />

Design is in accordance with the British Columbia Building Code 2006<br />

Edition. (Design loads as follows) (EFP=equiv.fuild press)<br />

Foundation Walls; 30pcf (EFP) as per BCBC 9.4.4.6.1)<br />

Slab live loads; 50psf<br />

All dead loads derived from plans. Wall surcharge loads as noted.<br />

FOUNDATIONS:<br />

All soil conditions shall be verified by the Building Dept. or a Geotech Eng.<br />

Footing shall be placed upon original undisturbed native ground. Once<br />

excavation is complete, contact the authorities to confirm site conditions.<br />

Foundation walls have been designed for an allowable soil bearing pressure of<br />

2000 psf (95 Kpa). Retaining walls have been designed for an allowable soil<br />

pressure of 3000 psf (144 Kpa). No footing shall bear higher than 2.0<br />

horizon. to 1.0 vert. to any excavation planned or existing. Footings shall be<br />

kept free of standing water and shall be protected from freezing when<br />

applicable.<br />

3.REINFORCING<br />

Shall be new stock deformed steel bars, grade 400MPa. conforming to CSA<br />

G30.12M. Placement of bars shall be as shown on the drawings. Splices shall<br />

be min.24" unless noted. Stagger splices in adjacent bars where applicable.<br />

-------Minimum bar coverage unless noted otherwise----------<br />

1 1/2" to formed surfaces; 3" to unformed surfaces. Slab mesh and/or rebar<br />

reinforcing to be centered. Suspended slab, columns, etc., as detailed on<br />

the drawings. All corners to be continous. Min. lap splice 24" unless noted.<br />

4.CONCRETE<br />

Concrete materials and methods of construction to conform to CAN /<br />

CSA-A23.3-04<br />

-All concrete (footings, walls, etc.) shall be 25MPa. @28 days.<br />

-HAMBRO Floor slabs shall be 32MPa @ 28 days min. strength.<br />

5.INSPECTIONS<br />

Provide 24 hours notice to the design engineer prior to all required site<br />

inspections; (see below).<br />

A) Prior to casting any concrete (footings, walls, SLABS, etc.)<br />

B) Prior to Backfilling to check floor diaphram connections and floor slab.<br />

C) Prior to concealing wood framing where applicable.<br />

6.BACK FILL<br />

Back fill only with approved free draining material such as `Pit Run' (Backfill<br />

material shall be approved by the local building dept. or a registered<br />

geotechnical Engineer). Prior to backfilling:<br />

1) Ensure the floor system is fully installed as per building code -*INSPECTION<br />

REQUIRED BY ROV CONSULTING. *<br />

2) Obtain Building Dept. authorization for drain tile,dampproofing,etc...<br />

(ROV is not responsible for the approval any back filling material).<br />

5/8"Ø ANC BOLTS<br />

x 8" LG.@ 32" o.c.<br />

3"<br />

APPROVED<br />

BRG. MATERIAL<br />

GRADE<br />

COVER<br />

4-15M VERTS<br />

c/w 12" HOOK<br />

INTO FOOTING<br />

CONTRACTOR TO VERIFY ALL DIMENSIONS<br />

AND TO NOTIFY THIS OFFICE OF ANY<br />

DISCREPANCIES. THIS DRAWING MAY NOT<br />

BE MODIFIED IN ANY MANNER UNLESS WITH<br />

THE CONSENT OF THE DESIGN ENGINEERS.<br />

DO NOT BACK FILL UNTIL THE FLOOR SYSTEM<br />

IS COMPLETELY IN PLACE, AND THEN ONLY<br />

WITH FREE DRAINING SOIL.<br />

THIS DRAWING IS ONLY FOR THE ENGINEERED<br />

PORTIONS NOTED ALL OTHER ASPECTS OF<br />

THE FOUNDATIONS , BOTH INTERIOR AND<br />

EXTERIOR ARE THE RESPONSIBILITY OF THE<br />

PROPER BUILDING AUTHORITIES, AND NOT<br />

ROV CONSULTING.<br />

THICKENED SLAB METHOD<br />

OTHER METHOD<br />

INTERIOR FOOTING SECTION 8<br />

<strong>S1</strong><br />

4"<br />

4<br />

<strong>S1</strong><br />

1'-4"<br />

3'-10"<br />

8"<br />

8"<br />

2-10M CONT. BARS<br />

2"+/- CONC SKIM COAT 2"+/- CONC SKIM COAT<br />

10M TIES @ 8" oc<br />

5/8"Ø ANC BOLTS<br />

x 8" LG.@ 32" o.c.<br />

2-10M CONT BAR<br />

PIER SECTION 5<br />

<strong>S1</strong><br />

10M @ 11"o.c.<br />

1'-4" TYPICAL FOOTING WIDTH U.N.O.<br />

EM2 SHEAR PLATE<br />

PL 150x9.5x200mm<br />

2-16mm STUDS x 100mm<br />

1-10M CONT BAR @<br />

SNAP TIE LOCATION<br />

CONTINUE 2-10M STRIP<br />

FOOTING BARS THROUGH<br />

PAD FOOTING<br />

3-15M EACH WAY<br />

3"<br />

COVER<br />

2"+/- CONC SKIM COAT<br />

CONTRACTOR IS RESPONSIBLE<br />

TO CHECK AND CONFIRM ALL<br />

DIMENSIONS AND ELEVATIONS<br />

ON DRAWINGS.<br />

REVISED FOR ENTRY<br />

2 GLULAMS/CONNECTIONS FEB 8, '10<br />

1<br />

ISSUED FOR PERMIT<br />

SPECIFICATIONS<br />

& DETAILS<br />

1 2" = 1'-0"<br />

TREVOR J.<br />

ROV<br />

FEB 2, '10 <strong>1716</strong><br />

FEB 3, '10<br />

SCUKA ENTERPRISES<br />

881 Highway 33E<br />

Kelowna BC V1X 6V1<br />

Ph: 250-765-0136<br />

Fax: 250-765-7826<br />

E-mail: scukaent@scuka.bc.ca<br />

Foundation Design For:<br />

Mountain View Lodge<br />

320 Veteran's Ave<br />

Lot 1, PlanKAP 37108<br />

<strong>Keremeos</strong>


1<br />

<strong>S1</strong><br />

6<br />

<strong>S1</strong><br />

1<br />

<strong>S1</strong><br />

1<br />

<strong>S1</strong><br />

8<br />

<strong>S1</strong><br />

1<br />

<strong>S1</strong><br />

1<br />

<strong>S1</strong><br />

1<br />

<strong>S1</strong><br />

5<br />

<strong>S1</strong><br />

1<br />

<strong>S1</strong><br />

5<br />

<strong>S1</strong><br />

2<br />

<strong>S1</strong><br />

3<br />

<strong>S1</strong><br />

PAD FTG.<br />

46"x36"x8"<br />

c/w 3-15M e.w.<br />

PIER:<br />

4-15M WALL DOWELS<br />

c/w 10M TIES @ 8" o.c.<br />

PAD FTG.<br />

46"x36"x8"<br />

c/w 3-15M e.w.<br />

PIER:<br />

4-15M WALL DOWELS<br />

c/w 10M TIES @ 8" o.c.<br />

5<br />

<strong>S1</strong><br />

1<br />

<strong>S1</strong><br />

1<br />

<strong>S1</strong><br />

2<br />

<strong>S1</strong><br />

3<br />

<strong>S1</strong><br />

PAD FTG.<br />

46"x36"x8"<br />

c/w 3-15M e.w.<br />

PIER:<br />

4-15M WALL DOWELS<br />

c/w 10M TIES @ 8" o.c.<br />

1<br />

<strong>S1</strong><br />

1<br />

<strong>S1</strong><br />

5<br />

<strong>S1</strong><br />

PAD FTG.<br />

46"x36"x8"<br />

c/w 3-15M e.w.<br />

PIER:<br />

4-15M WALL DOWELS<br />

c/w 10M TIES @ 8" o.c.<br />

2<br />

<strong>S1</strong><br />

3<br />

<strong>S1</strong><br />

5<br />

<strong>S1</strong><br />

1<br />

<strong>S1</strong><br />

PAD FTG.<br />

46"x36"x8"<br />

c/w 3-15M e.w.<br />

PIER:<br />

4-15M WALL DOWELS<br />

c/w 10M TIES @ 8" o.c.<br />

1<br />

<strong>S1</strong><br />

5<br />

<strong>S1</strong><br />

2<br />

<strong>S1</strong><br />

3<br />

<strong>S1</strong><br />

5<br />

<strong>S1</strong><br />

LEGEND<br />

PAD FTG.<br />

46"x36"x8"<br />

c/w 3-15M e.w.<br />

PIER:<br />

4-15M WALL DOWELS<br />

c/w 10M TIES @ 8" o.c.<br />

BUILDING 2 (EAST) FOUNDATION PLAN 1<br />

S2<br />

5<br />

<strong>S1</strong><br />

EM2 SHEAR PLATE<br />

PL 150x9.5x200mm<br />

2-16mm STUDS x 100mm<br />

5<br />

<strong>S1</strong><br />

1<br />

<strong>S1</strong><br />

1<br />

<strong>S1</strong><br />

5<br />

<strong>S1</strong><br />

2<br />

<strong>S1</strong><br />

3<br />

<strong>S1</strong><br />

PAD FTG.<br />

46"x36"x8"<br />

c/w 3-15M e.w.<br />

PIER:<br />

4-15M WALL DOWELS<br />

c/w 10M TIES @ 8" o.c.<br />

5<br />

<strong>S1</strong><br />

1<br />

<strong>S1</strong><br />

1<br />

<strong>S1</strong><br />

2<br />

<strong>S1</strong><br />

3<br />

<strong>S1</strong><br />

PAD FTG.<br />

46"x36"x8"<br />

c/w 3-15M e.w.<br />

PIER:<br />

4-15M WALL DOWELS<br />

c/w 10M TIES @ 8" o.c.<br />

1<br />

<strong>S1</strong><br />

1<br />

<strong>S1</strong><br />

5<br />

<strong>S1</strong><br />

PAD FTG.<br />

46"x36"x8"<br />

c/w 3-15M e.w.<br />

PIER:<br />

4-15M WALL DOWELS<br />

c/w 10M TIES @ 8" o.c.<br />

2<br />

<strong>S1</strong><br />

3<br />

<strong>S1</strong><br />

5<br />

<strong>S1</strong><br />

1<br />

<strong>S1</strong><br />

PAD FTG.<br />

46"x36"x8"<br />

c/w 3-15M e.w.<br />

PIER:<br />

4-15M WALL DOWELS<br />

c/w 10M TIES @ 8" o.c.<br />

1<br />

<strong>S1</strong><br />

5<br />

<strong>S1</strong><br />

2<br />

<strong>S1</strong><br />

PAD FTG.<br />

46"x36"x8"<br />

c/w 3-15M e.w.<br />

PIER:<br />

4-15M WALL DOWELS<br />

c/w 10M TIES @ 8" o.c.<br />

CONTRACTOR IS RESPONSIBLE<br />

TO CHECK AND CONFIRM ALL<br />

DIMENSIONS AND ELEVATIONS<br />

ON DRAWINGS.<br />

REVISED FOR ENTRY<br />

2 GLULAMS/CONNECTIONS FEB 8, '10<br />

1<br />

ISSUED FOR PERMIT<br />

1 4" = 1'-0"<br />

TREVOR J.<br />

ROV<br />

FEB 2, '10 <strong>1716</strong><br />

FEB 3, '10<br />

SCUKA ENTERPRISES<br />

881 Highway 33E<br />

Kelowna BC V1X 6V1<br />

Ph: 250-765-0136<br />

Fax: 250-765-7826<br />

E-mail: scukaent@scuka.bc.ca<br />

Foundation Design For:<br />

Mountain View Lodge<br />

320 Veteran's Ave<br />

Lot 1, PlanKAP 37108<br />

<strong>Keremeos</strong><br />

BUILDING 1 (EAST)<br />

FOUNDATION PLAN


1<br />

<strong>S1</strong><br />

PAD FTG.<br />

46"x36"x8"<br />

c/w 3-15M e.w.<br />

PIER:<br />

4-15M WALL DOWELS<br />

c/w 10M TIES @ 8" o.c.<br />

1<br />

<strong>S1</strong><br />

5<br />

<strong>S1</strong><br />

1<br />

<strong>S1</strong><br />

5<br />

<strong>S1</strong><br />

2<br />

<strong>S1</strong><br />

PAD FTG.<br />

46"x36"x8"<br />

c/w 3-15M e.w.<br />

PIER:<br />

4-15M WALL DOWELS<br />

c/w 10M TIES @ 8" o.c.<br />

PAD FTG.<br />

46"x36"x8"<br />

c/w 3-15M e.w.<br />

PIER:<br />

4-15M WALL DOWELS<br />

c/w 10M TIES @ 8" o.c.<br />

3<br />

<strong>S1</strong><br />

5<br />

<strong>S1</strong><br />

1<br />

<strong>S1</strong><br />

1<br />

<strong>S1</strong><br />

2<br />

<strong>S1</strong><br />

3<br />

<strong>S1</strong><br />

1<br />

<strong>S1</strong><br />

1<br />

<strong>S1</strong><br />

PAD FTG.<br />

46"x36"x8"<br />

c/w 3-15M e.w.<br />

PIER:<br />

4-15M WALL DOWELS<br />

c/w 10M TIES @ 8" o.c.<br />

PAD FTG.<br />

46"x36"x8"<br />

c/w 3-15M e.w.<br />

PIER:<br />

4-15M WALL DOWELS<br />

c/w 10M TIES @ 8" o.c.<br />

5<br />

<strong>S1</strong><br />

2<br />

<strong>S1</strong><br />

3<br />

<strong>S1</strong><br />

5<br />

<strong>S1</strong><br />

1<br />

<strong>S1</strong><br />

1<br />

<strong>S1</strong><br />

5<br />

<strong>S1</strong><br />

PAD FTG.<br />

46"x36"x8"<br />

c/w 3-15M e.w.<br />

PIER:<br />

4-15M WALL DOWELS<br />

c/w 10M TIES @ 8" o.c.<br />

2<br />

<strong>S1</strong><br />

3<br />

<strong>S1</strong><br />

5<br />

<strong>S1</strong><br />

LEGEND<br />

BUILDING 1 (WEST) FOUNDATION PLAN 1<br />

S3<br />

5<br />

<strong>S1</strong><br />

EM2 SHEAR PLATE<br />

PL 150x9.5x200mm<br />

2-16mm STUDS x 100mm<br />

5<br />

<strong>S1</strong><br />

1<br />

<strong>S1</strong><br />

1<br />

<strong>S1</strong><br />

5<br />

<strong>S1</strong><br />

2<br />

<strong>S1</strong><br />

3<br />

<strong>S1</strong><br />

PAD FTG.<br />

46"x36"x8"<br />

c/w 3-15M e.w.<br />

PIER:<br />

4-15M WALL DOWELS<br />

c/w 10M TIES @ 8" o.c.<br />

PAD FTG.<br />

46"x36"x8"<br />

c/w 3-15M e.w.<br />

PIER:<br />

4-15M WALL DOWELS<br />

c/w 10M TIES @ 8" o.c.<br />

5<br />

<strong>S1</strong><br />

1<br />

<strong>S1</strong><br />

1<br />

<strong>S1</strong><br />

2<br />

<strong>S1</strong><br />

3<br />

<strong>S1</strong><br />

1<br />

<strong>S1</strong><br />

PAD FTG.<br />

46"x36"x8"<br />

c/w 3-15M e.w.<br />

PIER:<br />

4-15M WALL DOWELS<br />

c/w 10M TIES @ 8" o.c.<br />

1<br />

<strong>S1</strong><br />

PAD FTG.<br />

46"x36"x8"<br />

c/w 3-15M e.w.<br />

PIER:<br />

4-15M WALL DOWELS<br />

c/w 10M TIES @ 8" o.c.<br />

5<br />

<strong>S1</strong><br />

2<br />

<strong>S1</strong><br />

3<br />

<strong>S1</strong><br />

5<br />

<strong>S1</strong><br />

1<br />

<strong>S1</strong><br />

PAD FTG.<br />

46"x36"x8"<br />

c/w 3-15M e.w.<br />

PIER:<br />

4-15M WALL DOWELS<br />

c/w 10M TIES @ 8" o.c.<br />

1<br />

<strong>S1</strong><br />

5<br />

<strong>S1</strong><br />

2<br />

<strong>S1</strong><br />

2<br />

<strong>S1</strong><br />

8<br />

<strong>S1</strong><br />

1<br />

<strong>S1</strong><br />

2<br />

<strong>S1</strong><br />

1<br />

<strong>S1</strong><br />

6<br />

<strong>S1</strong><br />

CONTRACTOR IS RESPONSIBLE<br />

TO CHECK AND CONFIRM ALL<br />

DIMENSIONS AND ELEVATIONS<br />

ON DRAWINGS.<br />

REVISED FOR ENTRY<br />

2 GLULAMS/CONNECTIONS FEB 8, '10<br />

1<br />

ISSUED FOR PERMIT<br />

1 4" = 1'-0"<br />

TREVOR J.<br />

ROV<br />

FEB 2, '10 <strong>1716</strong><br />

FEB 3, '10<br />

SCUKA ENTERPRISES<br />

881 Highway 33E<br />

Kelowna BC V1X 6V1<br />

Ph: 250-765-0136<br />

Fax: 250-765-7826<br />

E-mail: scukaent@scuka.bc.ca<br />

Foundation Design For:<br />

Mountain View Lodge<br />

320 Veteran's Ave<br />

Lot 1, PlanKAP 37108<br />

<strong>Keremeos</strong><br />

BUILDING 2 (WEST)<br />

FOUNDATION PLAN


2<br />

S4<br />

C78<br />

ROOF TRUSSES<br />

@24"o.c.<br />

B1 B1<br />

B1<br />

B1<br />

B1<br />

2<br />

S4<br />

ROOF TRUSSES<br />

@24"o.c.<br />

ROOF TRUSSES<br />

@24"o.c.<br />

C78 C78<br />

3<br />

S4<br />

12<br />

3<br />

S4<br />

3<br />

B1<br />

2<br />

S4<br />

2<br />

S4<br />

SIDE VIEW<br />

C78<br />

ENTRY GLULAM BEAM AND<br />

COLUMN CONNECTIONS<br />

SCALE: 1 2" = 1'-0"<br />

C78<br />

B1<br />

2<br />

S4<br />

4<br />

S4<br />

EM2 SHEAR PLATE<br />

PL 150x9.5x200mm<br />

2-16mm STUDS x 100mm<br />

2<br />

S4<br />

C78<br />

B1<br />

TOP VIEW<br />

2<br />

S4<br />

ROOF TRUSSES<br />

@24"o.c.<br />

1'-4 9 16"<br />

1 1 2"<br />

3 3 4"<br />

6 1 16"<br />

3 3 4"<br />

1 1 2"<br />

1 1 2" 3" 1 1 2"<br />

1 4" BEAM TO COLUMN KNIFE<br />

PLATE<br />

SCALE: 1" = 1'-0"<br />

6"<br />

C78<br />

B1<br />

3<br />

S4<br />

2<br />

S4<br />

C78<br />

B1<br />

2<br />

2<br />

S4<br />

S4<br />

C78<br />

6 3 4"<br />

C78<br />

B1<br />

2<br />

S4<br />

ROOF TRUSSES<br />

@24"o.c.<br />

C78<br />

ROOF TRUSSES<br />

@24"o.c.<br />

BUILDING 2 (EAST) FOUNDATION PLAN 1<br />

S4<br />

1 1 2"<br />

3 3 4"<br />

1 1 2"<br />

B1<br />

C78<br />

C78<br />

BEAM SCHEDULE<br />

B1 6 3 4"x10 1 2" GLULAM-EX, D.FIR-L, 20f-EX EXPOSED BEAM<br />

COLUMN SCHEDULE<br />

C78 6 3 4"x7 1 2" GLULAM-C, D.FIR-L, 16C-E EXPOSED COLUMN<br />

1 2" 31 5"<br />

2" 1<br />

4"<br />

2<br />

S4<br />

NOTE: 3-PLY 2x10 SPF #2 OR<br />

2-PLY 9 1 2" LVL MINIMUM BACKING<br />

IS REQUIRED IN THE MOBILE<br />

HOME UNITS AT ALL GLULAM<br />

BEAM TO BUILDING LOCATIONS.<br />

1 1 2"<br />

3 3 4"<br />

1 1 2"<br />

1 1 2"<br />

2<br />

S4<br />

1 1 2" 1 1 2"<br />

6 1 4"<br />

1 4"<br />

1 1 2"<br />

1 4" BEAM KNIFE PLATE HANGER<br />

SCALE: 1" = 1'-0"<br />

1 4"<br />

3 1 2"<br />

1 1 2"<br />

5"<br />

4<br />

S4<br />

B1<br />

2<br />

S4<br />

2<br />

S4<br />

C78<br />

1 4"<br />

B1<br />

7 3 4"<br />

2 3 4"<br />

C78<br />

B1<br />

6"<br />

ROOF TRUSSES<br />

@24"o.c.<br />

2<br />

S4<br />

1 1 2" 3" 1 1 2"<br />

C78<br />

1 1 2"<br />

3 3 4"<br />

2 1 2"<br />

2 3 4"<br />

B1<br />

1 4"<br />

2<br />

S4<br />

ROOF TRUSSES<br />

@24"o.c.<br />

1 4"<br />

1 9 16" 1 9 16"<br />

SIDE VIEW SIDE VIEW TOP VIEW SIDE VIEW FRONT VIEW<br />

1 4" COLUMN BASE KNIFE PLATE<br />

SCALE: 1" = 1'-0"<br />

2 1 2" 3 3 4" 1 1 2"<br />

2 3 4"<br />

1 4"<br />

5<br />

S4<br />

C78<br />

B1<br />

2<br />

S4<br />

C78<br />

B1<br />

2<br />

S4<br />

2<br />

S4<br />

C78<br />

NOTE:<br />

-CONTRACTOR TO CONFIRM ALL GLULAM MEMBER<br />

LENGTHS AND DIMENSIONS WITH ARCHITECTURAL<br />

PLANS.<br />

-MINIMUM PLATE AND BOLT SPACING SHOWN IN ALL<br />

CROSS SECTIONS. HAVE FINAL CHANGES TO PLATE<br />

DESIGNS APPROVED BY ROV CONSULTING INC. PRIOR<br />

TO CONSTRUCTION.<br />

-ALL PLATE MATERIAL IS 1 4" G40.21M 300W STEEL<br />

MINIMUM, UNLESS NOTED.<br />

-ALL BOLTS ARE 3 4"Ø A307 MACHINE BOLTS THROUGH<br />

STEEL KNIFE PLATE AND WOOD MEMBER ON EITHER<br />

SIDE.<br />

USE 3"Ø WASHERS WHERE BOLTS ARE SPACED MORE<br />

THAN 1 1 2" APART. USE MINIMUM REQUIRED WASHERS<br />

EVERYWHERE ELSE (2"Ø).<br />

-ALL CUTS TO WOOD ELEMENTS AND STEEL PLATES TO<br />

BE CLEAN AND NEAT, AS THEY ARE EXPOSED<br />

THROUGHOUT.<br />

B1<br />

ROOF TRUSSES<br />

@24"o.c.<br />

B1<br />

2<br />

S4<br />

ROOF TRUSSES<br />

@24"o.c.<br />

S4<br />

C78<br />

B1<br />

C78 C78<br />

2<br />

B1<br />

2<br />

S4<br />

CONTRACTOR IS RESPONSIBLE<br />

TO CHECK AND CONFIRM ALL<br />

DIMENSIONS AND ELEVATIONS<br />

ON DRAWINGS.<br />

REVISED FOR ENTRY<br />

2 GLULAMS/CONNECTIONS FEB 8, '10<br />

1<br />

ISSUED FOR PERMIT<br />

1 4" = 1'-0"<br />

TREVOR J.<br />

ROV<br />

FEB 2, '10 <strong>1716</strong><br />

FEB 3, '10<br />

SCUKA ENTERPRISES<br />

881 Highway 33E<br />

Kelowna BC V1X 6V1<br />

Ph: 250-765-0136<br />

Fax: 250-765-7826<br />

E-mail: scukaent@scuka.bc.ca<br />

Foundation Design For:<br />

Mountain View Lodge<br />

320 Veteran's Ave<br />

Lot 1, PlanKAP 37108<br />

<strong>Keremeos</strong><br />

BUILDING 1 (EAST)<br />

ROOF PLAN AND ENTRY<br />

CONNECTIONS


2<br />

S4<br />

B1 B1 B1 B1 B1<br />

B1 B1 B1<br />

C78<br />

ROOF TRUSSES<br />

@24"o.c.<br />

C78 C78 C78 C78 C78 C78 C78 C78<br />

2<br />

S4<br />

ROOF TRUSSES<br />

@24"o.c.<br />

B1 B1<br />

C78<br />

2<br />

S4<br />

2<br />

S4<br />

C78<br />

B1<br />

2<br />

S4<br />

C78<br />

B1<br />

2<br />

S4<br />

ROOF TRUSSES<br />

@24"o.c.<br />

ROOF TRUSSES<br />

@24"o.c.<br />

2<br />

S4<br />

C78 C78<br />

B1 B1<br />

2<br />

S4<br />

2<br />

S4<br />

ROOF TRUSSES<br />

@24"o.c.<br />

2<br />

S4<br />

2<br />

S4<br />

ROOF TRUSSES<br />

@24"o.c.<br />

C78 C78<br />

B1 B1<br />

BEAM SCHEDULE<br />

B1 6 3 4"x10 1 2" GLULAM-EX, D.FIR-L, 20f-EX EXPOSED BEAM<br />

COLUMN SCHEDULE<br />

C78 6 3 4"x7 1 2" GLULAM-C, D.FIR-L, 16C-E EXPOSED COLUMN<br />

BUILDING 1 (WEST) FOUNDATION PLAN 1<br />

S5<br />

2<br />

S4<br />

2<br />

S4<br />

2<br />

S4<br />

2<br />

S4<br />

2<br />

S4<br />

C78 C78 C78 C78<br />

B1 B1 B1 B1<br />

ROOF TRUSSES<br />

@24"o.c.<br />

2<br />

S4<br />

2<br />

S4<br />

2<br />

S4<br />

C78<br />

ROOF TRUSSES<br />

@24"o.c.<br />

2<br />

S4<br />

ROOF TRUSSES<br />

@24"o.c.<br />

2<br />

S4<br />

B1 B1<br />

ROOF TRUSSES<br />

@24"o.c.<br />

C78<br />

2<br />

S4<br />

CONTRACTOR IS RESPONSIBLE<br />

TO CHECK AND CONFIRM ALL<br />

DIMENSIONS AND ELEVATIONS<br />

ON DRAWINGS.<br />

REVISED FOR ENTRY<br />

2 GLULAMS/CONNECTIONS FEB 8, '10<br />

1<br />

ISSUED FOR PERMIT<br />

1 4" = 1'-0"<br />

TREVOR J.<br />

ROV<br />

FEB 2, '10 <strong>1716</strong><br />

FEB 3, '10<br />

SCUKA ENTERPRISES<br />

881 Highway 33E<br />

Kelowna BC V1X 6V1<br />

Ph: 250-765-0136<br />

Fax: 250-765-7826<br />

E-mail: scukaent@scuka.bc.ca<br />

Foundation Design For:<br />

Mountain View Lodge<br />

320 Veteran's Ave<br />

Lot 1, PlanKAP 37108<br />

<strong>Keremeos</strong><br />

BUILDING 2 (WEST)<br />

ROOF PLAN