Efficient telecontrol with SINAUT Modular, flexible, secure.
Efficient telecontrol with SINAUT Modular, flexible, secure.
Efficient telecontrol with SINAUT Modular, flexible, secure.
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Time synchronization<br />
To enable subsequent and correct archiving of process data in<br />
the control center system, all data messages are already<br />
assigned a time tag at their place of origin. The complete network<br />
is automatically synchronized (controlled by DCF77 or<br />
GPS), including summer/winter time switchover.<br />
<strong>SINAUT</strong> ST7cc control center system<br />
The standard <strong>SINAUT</strong> control center is based on WinCC/PCS 7<br />
which is expanded <strong>with</strong> the software <strong>SINAUT</strong> ST7cc. This processes<br />
the communication <strong>with</strong> the <strong>SINAUT</strong> stations. It supplies<br />
the archives <strong>with</strong> process data in line <strong>with</strong> the provided<br />
time stamp, and is also able to link sector-typical logging<br />
systems such as ACRON. The additional package "Alarm Control<br />
Center" is recommended for alarming the on-call service<br />
personnel over SMS, fax or e-mail. In order to increase the<br />
availability, the control center can also be designed as a redundant<br />
system in conjunction <strong>with</strong> the WinCC/PCS 7 redundancy<br />
package.<br />
Linking of third-party control systems<br />
Using the <strong>SINAUT</strong> ST7sc program package <strong>with</strong> the Data Access<br />
OPC interface, the <strong>SINAUT</strong> ST7 stations can also be linked<br />
to control systems from other vendors. ST7sc possesses complex<br />
buffer mechanisms which prevent a data loss even upon<br />
failure of the OPC client. All process data are delivered <strong>with</strong> a<br />
time stamp, and the configuring of the OPC interface is also<br />
simple and user-friendly. Depending on the required availability,<br />
<strong>SINAUT</strong> ST7sc can be linked to redundant or non-redundant<br />
clients.<br />
Engineering<br />
The engineering system based on SIMATIC tools permits<br />
graphic configuration of complete communications networks.<br />
The system automatically provides the configuration engineer<br />
<strong>with</strong> all possibilities of linking the individual PLCs. Also possible:<br />
multiple addressing of process data, for example to several<br />
control centers or stations. Plausibility checks and address<br />
comparisons help when configuring complex networks.<br />
Remote programming and diagnostics<br />
Program modifications or remote diagnostics are easy to carry<br />
out in the <strong>SINAUT</strong> remote stations both in the commissioning<br />
phase and during operation, even <strong>with</strong>out interrupting the<br />
current process data communication. This saves traveling<br />
times and maintenance visits.<br />
Future-oriented and economical<br />
<strong>SINAUT</strong> ST7 is a <strong>telecontrol</strong> system produced on the basis of<br />
the SIMATIC S7 automation system, which resumes the successful<br />
properties of the previous <strong>SINAUT</strong> ST1 system based<br />
on SIMATIC S5, while continuing to evolve. The consistent use<br />
of the SIMATIC platform guarantees the long service life and<br />
economy of plant investments, and guarantees compatibility<br />
<strong>with</strong> previous and future systems.<br />
<strong>SINAUT</strong> Telecontrol 7