Tender No. : 12000050-HB-12001 Tender Published On : 24-Jul-2012 17:14<br />

Title ROV-Hubli LPG Plant<br />

Delivery Terms - Free to Destination location unless specified otherwise. Validity of offer - 90 days from the initial or extended Due Date for submission<br />

of Tender whichever is later unless specified otherwise. Liquidated Damages accepted unless specified otherwise.<br />

In case bidder does not deviate from the standard offer validity in on line deviation form, bid’s offer validity shall be considered as mentioned above.<br />

In case a Revised priced bid is initiated for this tender, at a later date (eg Technical evaluation stage etc), it shall be incumbent upon the bidder to submit<br />

revised bids for the specified items/entire tender. In the absence of revised bids rom the bidder within specified time period, the original bid submitted by<br />

the bidder shall not be considered for evaluation.<br />

Basic Information Of Tender<br />

Description Supply of Remote Operated Valves(ROVs) at Hubli & Mysore LPG Plants<br />

Tender Type <strong>Limited</strong><br />

Tender Scope Domestic<br />

Bid Type Two Bid<br />

Evaluation Criteria Item Wise<br />

Tender Due Date & Time 22-Aug-2012 15:00<br />

Pre Bid Conference Start Date & Time<br />

Pre Bid Conference End Date & Time<br />

Queries Start Date & Time 25-Jul-2012 15:30<br />

Quries End Date & Time 16-Aug-2012 15:30<br />

Un Priced Bid Open Date & Time 22-Aug-2012 15:01<br />

Tender Description This e Tender is floated for supply & commissioinig of Remote operated valves for HUBLI LPG Plant and Mysore<br />

LPG plant as per following details. Part Orderclause is applicable. However, supply and commissioning of valves in<br />

the same location will be considered together for evaluation.HPCL reserves the right to accept any tender in whole or<br />

in part or reject any or alltenders without assigning any reason.THIRD PARTY INSPECTIONManufacturers test<br />

certificate shall be produced from the original manufacturer for the imported actuator.Proof of import also shall be<br />

verified by the third party inspection agency and the valves identified.The total assembly shall be offered for<br />

inspection to one of the following Third Party Inspection agencies.A. EIL B. LLOYDS C. BVIS D. RITES<br />

E. BAX COUNSEL F. IRSSCOPE OF INSPECTION:A. Visual inspection.B. Dimensional check.C. Scrutiny of<br />

material test certificates.D. Performance test.NOTICE INVITING e TENDER (NIT) : This e Tender is invited under<br />

TWO BID system asper enclosed details in the tender. Bidders are requested to notethat this tender is on eprocurement<br />

platform and hence the interested bidders canparticipate in the tender only through the internet through<br />

the website http://etender.hpcl.co.inThe minimum requirement is of possession of Digital Certificate ( for tender<br />

purpose havingthe facility of signing, data encryption and decryption) by the vendor .The systemrequirement details<br />

are also available at the website http://etender.hpcl.co.in NSIC registered parties will be given price preference as<br />

per applicable govt. guidelines subject to theirsubmission of NSIC registration documents .It will be entire<br />

responsibility of the vendor toget registered in HPCL e procurement module & to submit the bid in e procurement<br />

modulewithin due date & time. HPCL will not be responsible for delay of submission of biddocument by vendor due<br />

to any reason whatsoever. Contact Prabhakar Sant ( 022-22637013)-Manager--EP&P-LPG regarding any query<br />

about this tender. HPCL has a grievancehandling system details of which is available at HPCL Web site.


Tender No. : 12000050-HB-12001 Tender Published On : 24-Jul-2012 17:14<br />

Srl.<br />

No.<br />

Line Details Of Tender<br />

Line Description UOM Quantity Mandatory<br />

Supply & Commissioing of ROVs Manadatory: No<br />

1 300 # FIRE SAFE ROV 250 NB Each 3 Yes<br />

2 300 # FIRE SAFE ROV 100 NB Each 6 Yes<br />

3 300 # FIRE SAFE ROV 150 NB Each 2 Yes<br />

4 300 # FIRE SAFE ROV 150 NB Each 2 Yes<br />

5 150# ROV 150 NB Each 3 Yes<br />

6 150# ROV 150 NB Each 2 Yes<br />

7 COMM ROV UNDER ITEM NO.1 Each 3 Yes<br />

8 COMM ROV UNDER ITEM NO.2 Each 6 Yes<br />

9 COMM ROV UNDER ITEM NO.3 Each 2 Yes<br />

10 COMM ROV UNDER ITEM NO.4 Each 2 Yes<br />

11 COMM ROV UNDER ITEM NO.5 Each 3 Yes<br />

12 COMM ROV UNDER ITEM NO.6 Each 2 Yes


Tender No. : 12000050-HB-12001 Tender Published On : 24-Jul-2012 17:14<br />

Tech Specs<br />

Sl.No. Description HPCL File HPCL Value Supporting<br />

Doc. Req'd<br />

1 Technical Specifications & General Terms & Conditions ROV Tender Hubli<br />

Mysore.PDF<br />

- No


HINDUSTAN PETROLEUM CORPORATION LIMITED<br />

LPG PROJECTS, HINDUSTAN BHAVAN-3, 8 S.V. MARG, BALLARD ESTATE,<br />

MUMBAI-400001<br />

TENDER FOR<br />

SUPPLY, INSTALLATION & COMMISSIONING<br />

OF<br />

REMOTE OPERATED VALVES AT<br />

MYSORE &HUBLI LPG BOTTLING PLANT


HINDUSTAN PETROLEUM CORPORATION LIMITED<br />

LPG PROJECTS, HINDUSTAN BHAVAN-3, 8 S.V. MARG, BALLARD ESTATE,<br />

MUMBAI-400001<br />

INSTRUCTIONS TO BIDDERS<br />

1 Brief Scope of Work<br />

The scope of work includes (but not limited to) the Design, Engineering, Supply & Material<br />

procurement, Fabrication, Assembly, Painting, Inspection at manufacturers works, Supply &<br />

Delivery to site, Installation and Commissioning of REMOTE OPERATED VALVES at<br />

Mysore & Hubli LPG Bottling Plant project Site, HPCL<br />

Offered equipment and accessories shall meet all statutory requirements. Necessary<br />

documents supporting statutory approvals shall be submitted along with the un-priced bid.<br />

2 Delivery Period<br />

16 WEEKS for the supply of the equipment-from the date of issue of PO/LOI for complete<br />

supply work as per SOQ and 15 days for commissioning from the date of advise from EIC.<br />

Delivery at site shall be considered as date of delivery for supply. LD as per GTC will be<br />

applicable supply and commissioning separately as per above delivery periods.<br />

3 Information/Documents required along with Application:<br />

a) Title, style and postal address of the firm.<br />

b) Communication particulars including telephone numbers, fax numbers and e-mail address.<br />

4. Part Order<br />

HPCL reserves the right to accept any tender in whole or in part or reject any or all tenders<br />

without assigning any reason. HPCL reserves right to accept any or more tenders in part.<br />

Decision of HPCL in this regard shall be final and binding on the bidder.<br />

Special Instructions to Bidders<br />

1. The third party inspection agency (TPIA) for the entire work will be arranged by the Bidder.<br />

2. Vendor shall submit tentative detailed Quality assurance plan (QAP) for stage wise<br />

inspection. The detailed QAP will be drawn up after finalisation of the order along with the<br />

TPIA. Vendor to incorporate the comments and observations made byHPCL and<br />

execute the same at no EXTRA COST to HPCL.<br />

3 Bid Clarifications/Amendments By HPCL<br />

3.1 HPCL may issue clarifications / amendments in the form of addendum / corrigendum<br />

during the bidding period and may also issue amendments subsequent to receiving the bids.<br />

For the addendum / corrigendum issued during the bidding period, bidders shall confirm<br />

the inclusion of addendum / corrigendum in their bid. Bidders shall follow the instructions<br />

issued along with addendum / corrigendum.<br />

3.2 Bidders shall examine the bidding documents thoroughly and submit to HPCL any<br />

apparent conflict, discrepancy or error. HPCL shall issue appropriate clarifications or


HINDUSTAN PETROLEUM CORPORATION LIMITED<br />

LPG PROJECTS, HINDUSTAN BHAVAN-3, 8 S.V. MARG, BALLARD ESTATE,<br />

MUMBAI-400001<br />

amendments, if required. Any failure by bidder to comply with the aforesaid shall not<br />

excuse the bidder from performing the services in accordance with the contract if<br />

subsequently awarded.<br />

For any queries / clarifications regarding the tender, the parties may contactthe following<br />

personnel of HPCL as per following sequence:<br />

HPCL PROCUREMENT DEPT<br />

Mr.Prabakar Sant, Manager - Purchase, Ph: 022 – 22637013, – For Purchase related queries.<br />

Email: prabakarsant@hpcl.co.in<br />

CONTACT DETAIL AT HQO FOR TECHNICAL QUERIES<br />

Shri. V VENU MADHAV, Sr. MANAGER– LPG PROJECTS (022-2263 7161)<br />

Shri. BIJU K. NAIR, MANAGER- LPG PROJECTS (022-2263 7081)<br />

CONTACT DETAIL AT MYSORE SITE<br />

Shri. DEEPAK E D PROJECT ENGINEER LPG Projects, Mysore LPG Project Site<br />

( 09739977124)<br />

CONTACT DETAIL AT HUBLI SITE<br />

Shri. SHANDILYA AJAI SINGH, EXECUTIVE PROJECT ENGINEER LPG Projects,<br />

Hubli LPG Project Site( 08146891287)<br />

ADDRESS OF LOCATION-MYSORE:<br />

HINDUSTAN PETROLEUM CORPORATION LTD.<br />

LPG BOTTLING PLANT<br />

NO.425, HEBBAL INDUSTRIAL AREA<br />

METAGALLI P O<br />

MYSORE-570016<br />

KARNATAKA.<br />

ADDRESS OF LOCATION-HUBLI:<br />

HINDUSTAN PETROLEUM CORPORATION LTD.<br />

LPG BOTTLING PLANT<br />

165/166 KIADB INDUSTRIAL AREA<br />

BELUR,DHARWAD<br />

HUBLI<br />

KARNATAKA.


HINDUSTAN PETROLEUM CORPORATION LIMITED<br />

LPG PROJECTS, HINDUSTAN BHAVAN-3, 8 S.V. MARG, BALLARD ESTATE,<br />

MUMBAI-400001<br />

1.PAYMENT TERMS<br />

SPECIAL TERMS & CONDITIONS<br />

90% of the bill amount for Supply will be paid within 15 days after acceptance of material at<br />

site & receipt of Commercial Invoice, Excise Invoice with all test certificates/ Inspection<br />

release note. Original MTC, Testing & Inspections reports needs to be submitted along with<br />

supply, these documents are mandatory to accept the material at site.<br />

Balance 10% of the bill amount for supplywill be paid after submission of Performance Bank<br />

Guaranteeas per format attached in Agreed Terms & Conditions and as per clause of GTC for<br />

10% of order value.<br />

100% of the charges for Installation & commissioning will be paid within 15 days after<br />

successful commissioning and performance tests.<br />

Bidder shall quote separately for installation and commissioning at site inclusive of the<br />

Lodging, boarding, transport, food etc. required for the representative of the bidder during<br />

site visit. Separate visits shall be carried out for installation and commissioining, each with a<br />

minimum duration of 2 days.<br />

Quoted Prices shall be firm & fixed over the entire period of the execution of this order.All<br />

taxes, duties, Central sales tax, Octroi, Packing & Forwarding Charges, Freight and insurance<br />

including Transit-cum-storage -cum-erection/Third party insurance and all other taxes and<br />

duties shall be quoted separately.<br />

Necessary Service tax shall be paid extra, as applicable.<br />

2. OTHER SPECIAL CONDITIONS OF CONTRACT<br />

2.1 Bidders shall give the Undertaking that they are not on the Holiday list of HPCL. Any<br />

bidder found on Holiday list of HPCL will be rejected.<br />

3. COMPENSATION FOR DELAY (LIQUIDATED DAMAGE CLAUSE-LD)<br />

LD @ 0.5% per week subject to 5% of the value of the undelivered goods shall be levied for<br />

the period beyond the scheduled delivery period. LD will be separately applicable for both<br />

supply part and installation / commissioning part.<br />

4. OTHER GENERAL REQUIREMENTS<br />

4.1 Manufacturing & Supply of Remote operated valves:<br />

a) The Vendor shall manufacture& supply the machine / equipment strictly in accordance<br />

with technical specificationsmentioned in thetender documents and as per directions in<br />

the Purchase Order. Vendor shall submit the detailed GA Drawings, QA Plan to HPCL<br />

for approval. The Vendor shall not undertake on their own any changes in the<br />

Specifications mentioned in the Tender documents and Purchase Order.


HINDUSTAN PETROLEUM CORPORATION LIMITED<br />

LPG PROJECTS, HINDUSTAN BHAVAN-3, 8 S.V. MARG, BALLARD ESTATE,<br />

MUMBAI-400001<br />

d) Vendor shall be required to submit regular fortnightly progress reports and<br />

Inspection reports of their work to HPCL.<br />

4.2 Inspection By TPIA:<br />

The equipment shall be inspected by TPIA and the Inspection reports shall be made available<br />

to HPCL. No Goods shall be dispatched without clearance from TPIA. Vendor shall arrange<br />

for TPIA Inspection and include all the charges for the same in the quoted rates. The scope of<br />

TPIA inspection shall be as per approved QAP. The QAP shall be submitted to HPCL for<br />

approval within 02 weeks of placement of PO which shall be duly reviewed by HPCL. Any<br />

Changes suggested by HPCL shall be duly incorporated and resubmitted for approval<br />

The approved TPIA Agencies are :<br />

BV/EIL/RITES/PDIL/DNV/BAX COUNSEL/IRS/TUV/SGS / LLOYDS / LRIS<br />

4.3 Deviation in Design / Specifications:<br />

For deviations, if any, proposed by the Vendor in Specifications / Drawings, the Vendor<br />

should get them approved in writing from HPCL prior to the manufacturing.<br />

Any financial benefit accruing to the Vendor due to such deviations shall be passed on to<br />

HPCL and the decision of HPCL shall be final.


HINDUSTAN PETROLEUM CORPORATION LIMITED<br />

LPG PROJECTS, HINDUSTAN BHAVAN-3, 8 S.V. MARG, BALLARD ESTATE,<br />

MUMBAI-400001<br />

Time Schedule


HINDUSTAN PETROLEUM CORPORATION LIMITED<br />

LPG PROJECTS, HINDUSTAN BHAVAN-3, 8 S.V. MARG, BALLARD ESTATE,<br />

MUMBAI-400001<br />

DESCRIPTION OF WORK:<br />

LOCATION COMPLETION PERIOD FROM DATE OF<br />

ISSUE OF LOI or Purchase order<br />

ADDRESS OF LOCATION-<br />

MYSORE:<br />

HINDUSTAN PETROLEUM<br />

CORPORATION LTD.<br />

LPG BOTTLING PLANT<br />

NO.425, HEBBAL<br />

INDUSTRIAL AREA<br />

METAGALLI P O<br />

MYSORE-570016<br />

KARNATAKA.<br />

ADDRESS OF LOCATION-<br />

HUBLI:<br />

HINDUSTAN PETROLEUM<br />

CORPORATION LTD.<br />

LPG BOTTLING PLANT<br />

165/166 KIADB INDUSTRIAL<br />

AREA<br />

BELUR,DHARWAD<br />

HUBLI<br />

KARNATAKA.<br />

NOTE:<br />

16 WEEKS FOR SUPPLY<br />

AND 15 DAYS FOR<br />

COMMISSIONING.<br />

1) Time for completion shall be reckoned from the date of issue of Fax/ Letter of Intent by<br />

HPCL.<br />

2) Date of receipt at site shall be considered as the date of supply/ completion<br />

3) Time indicated is for completing all the Supply in all respects as per Exhibits, Specifications,<br />

Codes, Drawings and Instructions of Engineering In-Charge


HINDUSTAN PETROLEUM CORPORATION LIMITED<br />

LPG PROJECTS, HINDUSTAN BHAVAN-3, 8 S.V. MARG, BALLARD ESTATE,<br />

MUMBAI-400001<br />

TECHNICAL SPECIFICATION FOR<br />

REMOTE OPERATED CONTROL VALVES<br />

A. FOR VALVES FROM ITEM NOS. 1 TO 4<br />

1. The control valve shall be furnished complete with air filter regulator set, limit switches,<br />

solenoid valve and quick exhaust valve which shall be mounted on the control valve.<br />

2. The air filter regulator, solenoid valve and quick exhaust valve shall be pre-tubed with control<br />

valve. The connection size shall be 3/8" NPT.<br />

3. All electrical accessories, such as limit switch, solenoid valve should be explosion proof<br />

suitable for (NEC) class 1 DIV 1 Group B, C, D and weather proof to IP65.<br />

4. The solenoid valves shall be energized under 'normal' process conditions and suitable for<br />

operation on 230 VAC.<br />

5. Solenoid valves shall be of the "no-voltage-release-auto-reset" type. When "tripped", latching<br />

shall not be possible until solenoid is restored / reset to its energized position.<br />

6. Cable entry sizes of solenoid valves and limit switches shall be 1/2" NPT (F).<br />

7. Wires from solenoid valve shall be terminated inside a flameproof terminal box.<br />

8. The body material of solenoid valve shall be Brass / Aluminum alloy / Stainless steel.<br />

9. Vendor shall submit along with quotation technical literature describing operational features,<br />

dimensions, standard adopted and other details for purchasers review.<br />

10. Instrument supplied shall be suitable for operation in an ambient temperature range 5 degree<br />

C to 55 degree C.<br />

11. Solenoid valves shall be of ASCO make or approved imported equivalent only.<br />

12. Filter Regulator shall be of FESTO make or approved imported equivalent with<br />

Borosilicate bowl with metal shroud for outdoor application.<br />

13. Closure time for the ROV shall be less than 3 seconds.<br />

14. Quick closing facility shall be available in manual mode also.<br />

15. The actuator shall be AUDCO or imported and the approved manufacturers are BETTIS<br />

(USA), KTM (JAPAN), ROTARK (UK), BIFFI(ITALY), HYTORQ(UK),<br />

ELOMATIC(HOLLAND), NELES-JAMESBERY,TYCO-KEYSTONE<br />

16. The valve shall be metal seated Pressure balanced Ball valve of fire safe design with API<br />

monogram.


HINDUSTAN PETROLEUM CORPORATION LIMITED<br />

LPG PROJECTS, HINDUSTAN BHAVAN-3, 8 S.V. MARG, BALLARD ESTATE,<br />

MUMBAI-400001<br />

17. THIRD PARTY INSPECTION<br />

Manufacturers test certificate shall be produced from the original manufacturer for the<br />

imported actuator.<br />

Proof of import also shall be verified by the third party inspection agency and the valves<br />

identified.<br />

The total assembly shall be offered for inspection to 3 rd party agencies.<br />

SCOPE OF INSPECTION:<br />

A. Visual inspection.<br />

B. Dimensional check.<br />

C. Scrutiny of material test certificates.<br />

D. Performance test.<br />

18. DELIVERY PERIOD:<br />

Deliveries shall be made within 16 Weeks from the date of receipt of LOI / PO / advice from Sr.<br />

Manager – LPG Projects. Commissioing shall be done within 15 days of advise from HPCL.<br />

19. OPERATING CONDITIONS<br />

SERVICE LPG LIQUID LPG VAPOUR<br />

SP. GRAVITY 0.53 -<br />

UNITS : FLOW/PRESSURE CU.M./HR. N CU.M./HR.<br />

KG/SQ. CM. KG/SQ.CM.<br />

INLET PRESSURE 9KG/SQ. CM. 9KG/SQ.CM.<br />

INLET TEMPERATURE 47 DEGREE C 47 DEGREE C<br />

MOLECULAR WEIGHT - 55<br />

VISCOSITY AT<br />

FLOW TEMPERATURE 0.5 CPS 0.5 CPS<br />

PRESSURE DROP MAX/MIN MIN.NEGLIGIBLE MIN.NEGLIGIBLE<br />

MAX. DP<br />

(DIFFERENTIAL PRESSURE) 15KG/SQ.CM. 15KG/SQ.CM.


HINDUSTAN PETROLEUM CORPORATION LIMITED<br />

LPG PROJECTS, HINDUSTAN BHAVAN-3, 8 S.V. MARG, BALLARD ESTATE,<br />

MUMBAI-400001<br />

20. ACTUATOR DETAILS (AUDCO / IMPORTED)<br />

MANUFACTURER VTS<br />

(APPROVED: AUDCO, BETTIS, KTM, ROTARK, BIFFI, EL-O-MATIC, HYTORQ, NELES-<br />

JAMESBERY,TYCO-KEYSTONE)<br />

MODEL VTS<br />

ACTION ON AIR FAILURE CLOSE<br />

OPERATOR TYPE PISTON<br />

SIZE VTS<br />

SPRING RETURN TO CLOSE<br />

TORQUE REQUIRED (MINIMUM TORQUE) 130% OF THE VALVE<br />

PREDICTED SOUND LEVEL 80 dB<br />

MIN. AIR PRESSURE REQD.(NOT MORE THAN VTS<br />

4 KG/SQ.CM)<br />

LIMIT SWITCH D P D T<br />

LIMIT SWITCH BOX EX.PROOF (IMPORTED)<br />

LIMIT SWITCH MAKE VTS<br />

INDICATION OPEN/CLOSE<br />

CONTACT RATING VTS<br />

MANUAL OVERRIDE REQUIRED<br />

QUICK CLOSING IN MANUAL MODE REQUIRED<br />

FILTER & REGULATOR GAUGE REQUIRED WITH OUTPUT<br />

PORTS 2<br />

FLP SOLENOID VALVE 3 WAY BRASS<br />

MAKER'S SERIES NUMBER VTS<br />

1. EQUIPMENT SHALL COMPLY WITH THIS DATA SHEET. DEVIATIONS (TO BE<br />

STATED AS SUCH) AND REMAINING INFORMATION SHALL BE CLEARLY<br />

SPECIFIED BY VENDOR.<br />

2. ALL THE TORQUE VALUES OF THE ACTUATOR (AIR BREAK, AIR END,<br />

SPRING BREAK AND SPRING END) SHALL BE HIGHER THAN THE 130%<br />

TORQUE REQUIREMENTS OF THE VALVE (VALVE BREAK TORQUE).


HINDUSTAN PETROLEUM CORPORATION LIMITED<br />

LPG PROJECTS, HINDUSTAN BHAVAN-3, 8 S.V. MARG, BALLARD ESTATE,<br />

MUMBAI-400001<br />

· VTS - VENDOR TO SPECIFY<br />

21. VENDOR DATA REQUIREMENTS<br />

TYPE OF DRAWINGS & DATA REQUIRED SCHEDULE LEAD TIME AFTER<br />

TO BE SUBMITTED LOI / P.O. /ALONG WITH BID<br />

DIMENSIONED OUTLINE DRAWINGS WITHIN 2 WEEKS FROM<br />

P.O.<br />

INSTALLATION, MAINTENANCE &<br />

OPERATING INSTRUCTIONS WITH SUPPLY<br />

PERFORMANCE TEST REPORT WITH SUPPLY<br />

CONTROL VALVE NOISE CALCULATIONS ALONG WITH<br />

TECHNICAL BID<br />

RECOMMENDED SPARE PARTS (PRICED) ALONG WITH BID<br />

COMPLETE SPARE PARTS LIST ALONG WITH TECHNICAL BID<br />

TYPE TEST CERTIFICATE FOR ELECTRICAL ITEM FOR WITH SUPPLY<br />

USE IN AREA CLASSIFICATION FROM UL. FM.<br />

PTB. ETC. DEPENDING UPON COUNTRY OF ORIGIN<br />

22. SPECIFICATION FOR BALL VALVE<br />

A. Construction Details<br />

SERVICE LIQUIFIED PETROLEUM GAS(LPG)<br />

1. Design Standard API 6D<br />

2. Fire Safe Certification API 607 / 6F / BS 6755 Pt.2<br />

3. Stem Blow out Proof / Antistatic<br />

4. Construction 2 Piece/3 Piece<br />

5. Port Full Bore / Bi-directional<br />

6. Ends


HINDUSTAN PETROLEUM CORPORATION LIMITED<br />

LPG PROJECTS, HINDUSTAN BHAVAN-3, 8 S.V. MARG, BALLARD ESTATE,<br />

MUMBAI-400001<br />

50mm size & above Flanged 300#, raised face, serrated Finish<br />

Flange details to ANSI B16.5<br />

Face to face to ANSI B16.10<br />

40 mm size and below Socket welded to B16.11 with Sch.80 seamless pipe extension<br />

piece 100 mm long on either side<br />

7. Operation ACTUATOR (Air Pressure shall open the valve, closure by<br />

spring upon release of air)<br />

8. Open / Close condition To be clearly marked<br />

9. Min. thickness for As per ANSI B16.34<br />

API 6D valves<br />

10. Pressure relieving device for Required<br />

body and bonnet cavity<br />

11. Spring Loading on body seat Required<br />

for triunion mounted ball<br />

12. Gland Bolted<br />

13. Back seat arrangement for Required<br />

repacking under full working pressure<br />

B. MATERIALS<br />

1. Body Cast Carbon Steel, ASTM A216 Gr.WCB<br />

2. Side / Tail Piece Cast Carbon Steel, ASTM A216 Gr.WCB<br />

3. Ball Stainless Steel AISI 316 / ASTM A351 Gr.CF8M<br />

4. Stem Stainless Steel AISI 316 (No Casting)<br />

5. Body Seat (Ball Sealing Ring) PTFE<br />

6. Body Gasket / Seal Grafoil<br />

7. Body stud & Nut Alloy Steel ASTM A193 B7 / A194 2H<br />

8. Stem (Gland) Packing Grafoil<br />

9. Back Seal (Stem Ring) PTFE<br />

10. Anti Static Spring Spring Steel<br />

11. Gland Nut Stainless Steel AISI 316<br />

12. Lever Carbon Steel<br />

13. Lock Plate Mild Steel<br />

14. Stop Pin Mild Steel<br />

C. Testing<br />

1. Standard API 6D / BS 6755 (Part I)<br />

2. Shell Test 80 kg/Sqcm (G)<br />

3. Seat Test 58 kg/sqcm (G)


NOTE:<br />

HINDUSTAN PETROLEUM CORPORATION LIMITED<br />

LPG PROJECTS, HINDUSTAN BHAVAN-3, 8 S.V. MARG, BALLARD ESTATE,<br />

MUMBAI-400001<br />

4. Air Test 7 kg/sqcm (G)<br />

1 . THE TORQUE VALUE FOR OPERATING THE VALVE SHALL BE CLEARLY<br />

INDICATED WITH SUPPORTING DOCUMENTS FROM THE MANUFACTURER.<br />

2. VALVE SHALL HAVE API MONOGRAM.<br />

3. TENDERES ARE REQUESTED NOT TO DEVIATE FROM ANY OF THE TECHNICAL<br />

REQUIREMENTS, AS ALL SUCH QUOTATIONS ARE LIABLE TO BE REJECTED.<br />

B. FOR VALVES FROM ITEM NO. 5 & 6.<br />

1. The control valve shall be furnished complete with air filter regulator set, limit switches,<br />

solenoid valve and quick exhaust valve which shall be mounted on the control valve.<br />

2. The air filter regulator, solenoid valve and quick exhaust valve shall be pre-tubed with control<br />

valve. The connection size shall be 3/8" NPT.<br />

3. All electrical accessories, such as limit switch, solenoid valve should be explosion proof<br />

suitable for (NEC) class 1 DIV 1 Group B, C, D and weather proof to IP65.<br />

4. The solenoid valves shall be energized under 'normal' process conditions and suitable for<br />

operation on 24 V DC. When the coil voltage is available the position of valve shall be<br />

“normally closed”.<br />

5. Cable entry sizes of solenoid valves and limit switches shall be 1/2" NPT (F).<br />

7. Wires from solenoid valve shall be terminated inside a flameproof terminal box.<br />

8. The body material of solenoid valve shall be Brass / Aluminum alloy / Stainless steel.<br />

9. Vendor shall submit along with quotation technical literature describing operational features,<br />

dimensions, standard adopted and other details for purchasers review.<br />

10. Instrument supplied shall be suitable for operation in an ambient temperature range 5 degree<br />

C to 55 degree C.<br />

11. Solenoid valves shall be of ASCO / ROTEX make or approved imported equivalent only.<br />

12. Filter Regulator shall be of FESTO make or approved imported equivalent with<br />

Borosilicate bowl with metal shroud for outdoor application.<br />

13. Opening time for the ROV shall be less than 3 seconds when the coil supply is switched off.


HINDUSTAN PETROLEUM CORPORATION LIMITED<br />

LPG PROJECTS, HINDUSTAN BHAVAN-3, 8 S.V. MARG, BALLARD ESTATE,<br />

MUMBAI-400001<br />

14. Quick opening facility shall be available in manual mode also.<br />

15. The actuator shall be AUDCO or imported and the approved manufacturers are BETTIS<br />

(USA), KTM (JAPAN), ROTARK (UK), BIFFI(ITALY), HYTORQ(UK),<br />

ELOMATIC(HOLLAND), NELES-JAMESBERY, TYCO-KEYSTONE<br />

16. The valve shall be metal seated Pressure balanced Ball valve with API monogram.<br />

17. THIRD PARTY INSPECTION<br />

Manufacturers test certificate shall be produced from the original manufacturer for the<br />

imported actuator.<br />

Proof of import also shall be verified by the third party inspection agency and the valves<br />

identified.<br />

The total assembly shall be offered for inspection to one of the Third Party Inspection<br />

agencies.<br />

SCOPE OF INSPECTION:<br />

A. Visual inspection.<br />

B. Dimensional check.<br />

C. Scrutiny of material test certificates.<br />

D. Performance test.<br />

18. DELIVERY PERIOD:<br />

Deliveries shall be made within 16 Weeks from the date of receipt of LOI / PO / advice from Sr.<br />

Manager – LPG Projects. Commissioning shall be within 15 days of advise.<br />

19. OPERATING CONDITIONS<br />

SERVICE WATER<br />

SP. GRAVITY 1.0<br />

UNITS : FLOW/PRESSURE CU.M./HR.<br />

KG/SQ. CM.<br />

INLET PRESSURE 10KG/SQ. CM.<br />

INLET TEMPERATURE 50 DEGREE C<br />

PRESSURE DROP MAX/MIN MIN. NEGLIGIBLE


HINDUSTAN PETROLEUM CORPORATION LIMITED<br />

LPG PROJECTS, HINDUSTAN BHAVAN-3, 8 S.V. MARG, BALLARD ESTATE,<br />

MUMBAI-400001<br />

20. ACTUATOR DETAILS (AUDCO / IMPORTED)<br />

MANUFACTURER VTS<br />

(APPROVED: AUDCO, BETTIS, KTM, ROTARK, BIFFI, EL-O-MATIC, HYTORQ, NELES-<br />

JAMESBERY,TYCO-KEYSTONE)<br />

MODEL VTS<br />

ACTION ON AIR FAILURE OPEN<br />

OPERATOR TYPE PISTON<br />

SIZE VTS<br />

SPRING RETURN TO OPEN (in de-energised condition)<br />

TORQUE REQUIRED (MINIMUM TORQUE) 130% OF THE VALVE<br />

PREDICTED SOUND LEVEL 80 dB<br />

MIN. AIR PRESSURE REQD.(NOT MORE THAN VTS<br />

4 KG/SQ.CM)<br />

LIMIT SWITCH D P D T<br />

LIMIT SWITCH BOX EX.PROOF (IMPORTED)<br />

LIMIT SWITCH MAKE VTS<br />

INDICATION OPEN in de-energised condition / CLOSE in<br />

energised condition<br />

CONTACT RATING VTS<br />

QUICK OPENING IN MANUAL MODE REQUIRED<br />

FILTER & REGULATOR GAUGE REQUIRED WITH OUTPUT<br />

PORTS 2<br />

FLP SOLENOID VALVE 3 WAY BRASS<br />

MAKER'S SERIES NUMBER VTS<br />

1. EQUIPMENT SHALL COMPLY WITH THIS DATA SHEET. DEVIATIONS (TO BE<br />

STATED AS SUCH) AND REMAINING INFORMATION SHALL BE CLEARLY<br />

SPECIFIED BY VENDOR.<br />

2. ALL THE TORQUE VALUES OF THE ACTUATOR (AIR BREAK, AIR END,<br />

SPRING BREAK AND SPRING END) SHALL BE HIGHER THAN THE 130%<br />

TORQUE REQUIREMENTS OF THE VALVE (VALVE BREAK TORQUE).<br />

· VTS - VENDOR TO SPECIFY


HINDUSTAN PETROLEUM CORPORATION LIMITED<br />

LPG PROJECTS, HINDUSTAN BHAVAN-3, 8 S.V. MARG, BALLARD ESTATE,<br />

MUMBAI-400001<br />

21. VENDOR DATA REQUIREMENTS<br />

TYPE OF DRAWINGS & DATA REQUIRED SCHEDULE LEAD TIME AFTER<br />

TO BE SUBMITTED LOI / P.O. /ALONG WITH BID<br />

DIMENSIONED OUTLINE DRAWINGS WITHIN 2 WEEKS FROM<br />

P.O.<br />

INSTALLATION, MAINTENANCE &<br />

OPERATING INSTRUCTIONS WITH SUPPLY<br />

PERFORMANCE TEST REPORT WITH SUPPLY<br />

CONTROL VALVE NOISE CALCULATIONS ALONG WITH<br />

TECHNICAL BID<br />

RECOMMENDED SPARE PARTS (PRICED) ALONG WITH<br />

TECHNICAL BID<br />

COMPLETE SPARE PARTS LIST ALONG WITH TECHNICAL BID<br />

TYPE TEST CERTIFICATE FOR ELECTRICAL ITEM FOR WITH SUPPLY<br />

USE IN AREA CLASSIFICATION FROM UL. FM.<br />

PTB. ETC. DEPENDING UPON COUNTRY OF ORIGIN


HINDUSTAN PETROLEUM CORPORATION LIMITED<br />

LPG PROJECTS, HINDUSTAN BHAVAN-3, 8 S.V. MARG, BALLARD ESTATE,<br />

MUMBAI-400001<br />

22. SPECIFICATION FOR BALL VALVE<br />

A. Construction Details<br />

SERVICE WATER<br />

1. Design Standard API 6D<br />

2. Stem Blow out Proof / Antistatic<br />

3. Construction 2 Piece/3 Piece<br />

4. Port Full Bore / Bi-directional<br />

5. Ends<br />

50mm size & above Flanged 150#, raised face, serrated Finish<br />

Flange details to ANSI B16.5<br />

Face to face to ANSI B16.10<br />

40 mm size and below Socket welded to B16.11 with Sch.80 seamless pipe extension<br />

piece 100 mm long on either side<br />

7. Operation ACTUATOR (Air Pressure shall CLOSE the valve,<br />

OPENING by spring upon release of air)<br />

8. Open / Close condition To be clearly marked<br />

9. Min. thickness for As per ANSI B16.34<br />

API 6D valves<br />

10. Pressure relieving device for Required<br />

body and bonnet cavity<br />

11. Spring Loading on body seat Required<br />

for triunion mounted ball<br />

12. Gland Bolted<br />

13. Back seat arrangement for Required<br />

repacking under full working pressure<br />

B. MATERIALS<br />

1. Body Cast Carbon Steel, ASTM A216 Gr.WCB<br />

2. Side / Tail Piece Cast Carbon Steel, ASTM A216 Gr.WCB<br />

3. Ball Stainless Steel AISI 316 / ASTM A351 Gr.CF8M<br />

4. Stem Stainless Steel AISI 316 (No Casting)<br />

5. Body Seat (Ball Sealing Ring) PTFE


HINDUSTAN PETROLEUM CORPORATION LIMITED<br />

LPG PROJECTS, HINDUSTAN BHAVAN-3, 8 S.V. MARG, BALLARD ESTATE,<br />

MUMBAI-400001<br />

6. Body Gasket / Seal Grafoil<br />

7. Body stud & Nut Alloy Steel ASTM A193 B7 / A194 2H<br />

8. Stem (Gland) Packing Grafoil<br />

9. Back Seal (Stem Ring) PTFE<br />

10. Anti Static Spring Spring Steel<br />

11. Gland Nut Stainless Steel AISI 316<br />

12. Lever Carbon Steel<br />

13. Lock Plate Mild Steel<br />

14. Stop Pin Mild Steel<br />

C. Testing<br />

NOTE:<br />

1. Standard API 6D / BS 6755 (Part I)<br />

2. Shell Test 40 kg/Sqcm (G)<br />

3. Seat Test 25 kg/sqcm (G)<br />

4. Air Test 7 kg/sqcm (G)<br />

1 . THE TORQUE VALUE FOR OPERATING THE VALVE SHALL BE CLEARLY<br />

INDICATED WITH SUPPORTING DOCUMENTS FROM THE MANUFACTURER.<br />

2. VALVE SHALL HAVE API MONOGRAM.<br />

3. TENDERES ARE REQUESTED NOT TO DEVIATE FROM ANY OF THE TECHNICAL<br />

REQUIREMENTS, AS ALL SUCH QUOTATIONS ARE LIABLE TO BE REJECTED.


HINDUSTAN PETROLEUM CORPORATION LIMITED<br />

LPG PROJECTS, HINDUSTAN BHAVAN-3, 8 S.V. MARG, BALLARD ESTATE,<br />

MUMBAI-400001<br />

SCHEDULE OF<br />

QUANTITIES


HINDUSTAN PETROLEUM CORPORATION LIMITED<br />

LPG PROJECTS, HINDUSTAN BHAVAN-3, 8 S.V. MARG, BALLARD ESTATE,<br />

MUMBAI-400001<br />

SR.NO SPECIFICATION QUANTITY<br />

1 300 # FIRE SAFE ROV 250<br />

NB<br />

3 HUBLI<br />

2 300 # FIRE SAFE ROV 100<br />

NB<br />

6<br />

3 300 # FIRE SAFE ROV 150<br />

NB<br />

2<br />

4 300 # FIRE SAFE ROV 150<br />

NB<br />

2 MYSORE<br />

5 150#FIRE SAFE ROV 150<br />

NB<br />

3 HUBLI<br />

6 150#FIRE SAFE ROV 150<br />

NB<br />

2 MYSORE<br />

7 COMMISSIONING ITEM<br />

UNDER ITEM NO.1<br />

3 HUBLI<br />

8 COMMISSIONING ITEM<br />

UNDER ITEM NO.2<br />

6<br />

9 COMMISSIONING ITEM<br />

UNDER ITEM NO.3<br />

2<br />

10 COMMISSIONING ITEM<br />

UNDER ITEM NO.4<br />

2 MYSORE<br />

11 COMMISSIONING ITEM<br />

UNDER ITEM NO.5<br />

3 HUBLI<br />

12 COMMISSIONING ITEM<br />

UNDER ITEM NO.6<br />

2 MYSORE


Tender No. : 12000050-HB-12001 Tender Published On : 24-Jul-2012 17:14<br />

Std GTC<br />

Sl.No. Description HPCL File HPCL Value Supporting<br />

Doc. Req'd<br />

1 Standard GTC GTC for e tender.PDF - No


HINDUSTAN PETROLEUM CORPORATION LIMITED<br />

LPG – DEPARTMENT-HB-3<br />

I. INSTRUCTIONS TO BIDDERS<br />

This is an e- tender and bids are to be submitted on-line only at<br />

Response in any other form shall not be accepted.<br />

While on-line bidding, bidders would be required to upload the scanned copy in<br />

pdf format of EMD instrument.(or exemption proof, if applicable). For bidding it<br />

is suggested that bidders should not wait for last date/ tender due date for their bid<br />

preparation as several documents are to be uploaded in the offer and prices are to<br />

be entered on screen for all items. There is a facility to keep the bid ready in the<br />

system for final submission, however bidders are requested to keep sufficient time<br />

margin with them for modifications, connectivity issues etc.<br />

The taxes mentioned in techno-commercial sheet on-line (Excise Duty, CST,<br />

Freight, TPI, Packing & Forwarding, Service tax, works contract tax etc.) will be<br />

added to the amount (Sum of (item quantity x item rate quoted by bidder) for<br />

arriving at total offer value. The education cess would be calculated on service<br />

tax. In case bidder quoted some/all taxes as 0%, it would be concluded that bidders<br />

quote is inclusive of all taxes applicable of all taxes applicable on tender due<br />

date/time or extended due date/time.<br />

1. This is only a Price Enquiry and not an order.<br />

2. Two Bid System: Bidders are required to submit offer in two parts namely `Unpriced' &<br />

Priced".<br />

3. Validity: Quoted prices shall be valid for a period of 90 days from the due date/extended due<br />

date for placement of order.<br />

4. If the Bidder is unable to meet our technical specification, they may quote for the closest<br />

available substitute giving details of same for HPCL consideration.<br />

5. Detailed literature along with pamphlets and performance curves as applicable shall be<br />

attached to your offer.<br />

6. Testing/Inspection :Equipment will be subject to inspection by HPCL / 3rd party as per the<br />

scope of inspection attached. Quoted prices shall include Bidder's charges towards testing as per<br />

scope of inspection. Inspection charges payable to 3rd party may be quoted separately. The<br />

approved TPI agencies are BV/EIL/RITES/PDIL/BAX COUNSEL. Scope of inspection to


include Dimensional Checks, Materials Verifications and Hydro Test. OR as per special terms<br />

and conditions.<br />

7. HPCL reserves the right to reject offers not meeting its Technical requirements and<br />

commercial conditions.<br />

8. HPCL reserves the right to accept any tender in whole or in part or reject any or all tenders<br />

without assigning any reason.<br />

9. HPCL shall not be bound to accept the lowest tender and reserves right to accept any or more<br />

tenders in part. Decision of HPCL in this connection shall be final.<br />

10. DELIVERY, PACKING & FORWARDING : Materials to be delivered at site on Door –<br />

Delivery basis at the address mentioned in the tender. All materials shall be covered by<br />

adequately strong wooden / metal / plastic closures. All fragile and delicate components shall be<br />

packed separately individually with proper marking. Item number shall be painted prominently<br />

on the unit.<br />

11. Prices are to be quoted in the following format only :<br />

The Rates quoted by the Tenderer shall in the following format only:<br />

1. Basic Price<br />

2. Packing & Forwarding<br />

3. Excise Duty:<br />

4. Sales Tax without form C<br />

5. Octroi /ENTRY TAX: will be payable extra at actual-did not quote<br />

6. Freight charges on door delivery basis<br />

7. Transit Insurance<br />

8. Third party Inspection Charges<br />

9. Any others charges<br />

II. TERMS AND CONDITIONS<br />

11. Firm Prices: On placement of order, prices will remain firm till complete execution.<br />

12. Delayed Delivery: Delivery is the essence of purchase order. In case of delay in<br />

execution of the order beyond contractual delivery date as stipulated in the order HPCL at its<br />

option can:<br />

either<br />

i) accept the delayed delivery on price reduced by sum equivalent to half percent (1/2%) of<br />

the basic value of goods not delivered per week of delay or part there of subject to a<br />

maximum of 5% of total basic value of order.<br />

or


ii) Cancel the order in part or full and purchase such cancelled quantities from elsewhere on<br />

account at the risk of the seller without prejudice to its right under (i) above in respect of<br />

goods delivered. All costs and expenses incurred by HPCL, if any, resulting from<br />

cancellation of order shall be recovered from the seller.<br />

13.Terms of Payment: PAYMENT will be made as per special terms and conditions, if any<br />

given .<br />

Or<br />

Payment against invoices shall be made on receipt of equipment / material at site against<br />

submission of following documents along with your Bill / Invoice :<br />

i) Delivery Challan / Lorry Receipt duly acknowledged by our site. ii) Manufacturer Test<br />

Certificate iii) Third Party Inspection / Clearance Report iv) Manufacturer Guarantee Certificate<br />

v) Performance Bank Guarantee for 10% of Basic Order value.<br />

75% Payment of the bill amount duly recommended by User Department will be paid in7 days<br />

of receipt of bill with material and balance 25% will be paid after verification/ certification of<br />

material in 15 days of submission of documents at our Disbursement Section in Mumbai through<br />

e payment mode only. Please note that HPCL cannot make any advance with order OR against<br />

despatch documents through Bank.<br />

14. STATUTORY LEVIES:<br />

Variations of taxes and duties arising out of the amendments to the Central /State<br />

enactments, in respect of sale of goods / services covered under this bid shall be to HPCL.s<br />

account, so long as :<br />

They relate to the period after the opening of the price bid, but before the contracted<br />

completion period (excluding permitted extensions due to delay on account of the contractors, if<br />

any) or the actual completion period, whichever is earlier; and The vendor furnishes<br />

documentary evidence of incurrence of such variations, in addition to the invoices/documents for<br />

claiming taxes and duties, wherever applicable.<br />

The contractor shall provide accurate particulars of PAN number as required, under<br />

Section 206AA of Income Tax Act 1961.<br />

15. Guarantee: Supplies shall be fully guaranteed against any manufacturing defects / poor<br />

workmanship / inferior design or quality etc. for a period of 12 months from the date of<br />

commissioning or 18 months from the date of delivery whichever is earlier. During this period,<br />

seller will arrange to repair / replace any defective part free of cost or replace complete set if<br />

required.<br />

Performance Bank Guarantee issued by any Nationalised Bank for 10% of basic order value of<br />

material supply and valid for above guarantee period shall be furnished.


16) Letter of Intent is an acceptance of offer by the <strong>Corporation</strong> and the tenderer should<br />

acknowledge receipt of the Purchase order within 15 days of mailing of the Order and any<br />

delay in acknowledging the receipt will be a breach of contract.<br />

17:ARBITRATION<br />

17.1 All disputes and differences of whatsoever nature, whether existing or which shall at any<br />

time arise between the parties hereto touching or concerning the agreement, meaning, operation<br />

or effect thereof or to the rights and liabilities of the parties or arising out of or in relation thereto<br />

whether during or after completion of the contract or whether before after determination,<br />

foreclosure, termination or breach of the agreement (other than those in respect of which the<br />

decision of any person is, by the contract, expressed to be final and binding) shall, after written<br />

notice by either party to the agreement to the other of them and to the Appointing Authority<br />

hereinafter mentioned, be referred for adjudication to the Sole Arbitrator to be appointed as<br />

hereinafter provided.<br />

17.2 The appointing authority shall either himself act as the Sole Arbitrator or nominate some<br />

officer/retired officer of <strong>Hindustan</strong> <strong>Petroleum</strong> <strong>Corporation</strong> <strong>Limited</strong> (referred to as owner or<br />

HPCL) or a retired officer of any other Government Company in the Oil Sector of the rank of<br />

Ch. Manager & above or any retired officer of the Central Government not below the rank of a<br />

Director, to act as the Sole Arbitrator to adjudicate the disputes and differences between the<br />

parties. The contractor/vendor shall not be entitled to raise any objection to the appointment of<br />

such person as the Sole Arbitrator on the ground that the said person is/was an officer and/or<br />

shareholder of the owner, another Govt. Company or the Central Government or that he/she has<br />

to deal or had dealt with the matter to which the contract relates or that in the course of his/her<br />

duties, he/she has/had expressed views on all or any of the matters in dispute or difference.<br />

17.3 In the event of the Arbitrator to whom the matter is referred to, does not accept the<br />

appointment, or is unable or unwilling to act or resigns or vacates his office for any reasons<br />

whatsoever, the Appointing Authority aforesaid, shall nominate another person as aforesaid, to<br />

act as the Sole Arbitrator.<br />

17.4 Such another person nominated as the Sole Arbitrator shall be entitled to proceed with the<br />

arbitration from the stage at which it was left by his predecessor. It is expressly agreed between<br />

the parties that no person other than the Appointing Authority or a person nominated by the<br />

Appointing Authority as aforesaid, shall act as an Arbitrator. The failure on the part of the<br />

Appointing Authority to make an appointment on time shall only give rise to a right to a<br />

Contractor to get such an appointment made and not to have any other person appointed as the<br />

Sole Arbitrator.<br />

17.5 The Award of the Sole Arbitrator shall be final and binding on the parties to the Agreement.


17.6 The work under the Contract shall, however, continue during the Arbitration proceedings<br />

and no payment due or payable to the concerned party shall be withheld (except to the extent<br />

disputed) on account of initiation, commencement or pendency of such proceedings.<br />

17.7 The Arbitrator may give a composite or separate Award(s) in respect of each dispute or<br />

difference referred to him and may also make interim award(s) if necessary.<br />

17.8 The fees of the Arbitrator and expenses of arbitration, if any, shall be borne equally by the<br />

parties unless the Sole Arbitrator otherwise directs in his award with reasons. The lumpsum fees<br />

of the Arbitrator shall be Rs. 40,000/- per case for transportation contracts and Rs. 60,000/- for<br />

engineering contracts and if the sole Arbitrator completes the arbitration including his award<br />

within 5 months of accepting his appointment, he shall be paid Rs. 10,000/- additionally as<br />

bonus. Reasonable actual expenses for stenographer, etc. will be reimbursed. Fees shall be paid<br />

stagewise i.e. 25% on acceptance, 25% on completion of pleadings/documentation, 25% on<br />

completion of arguments and balance on receipt of award by the parties<br />

17.9 Subject to the aforesaid, the provisions of the Arbitration and Conciliation Act, 1996 or any<br />

statutory modification or re-enactment thereof and the rules made thereunder, shall apply to the<br />

Arbitration proceedings under this Clause.<br />

17.10 The Contract shall be governed by and constructed according to the laws in force in India.<br />

The parties hereby submit to the exclusive jurisdiction of the Courts situated at Mumbai for all<br />

purposes. The Arbitration shall be held at say Mumbai and conducted in English language.<br />

17.11 The Appointing Authority is the Functional Director of <strong>Hindustan</strong> <strong>Petroleum</strong> <strong>Corporation</strong><br />

<strong>Limited</strong>.<br />

18.0 DELIVERY PERIOD : as per special terms and conditions.


(SPECIMEN)<br />

BANK GUARANTEE FOR PERFORMANCE OF THE OBLIGATIONS OF SUPPLIER /<br />

CONTRACTOR<br />

(on non-judicial stamp paper of appropriate value)<br />

To,<br />

<strong>Hindustan</strong> <strong>Petroleum</strong> <strong>Corporation</strong> Ltd.,<br />

LPG Department, Marketing Division,<br />

8 Shoorji Vallabhdas Marg,<br />

Ballard Estate, Mumbai-400001<br />

IN CONSIDERATION OF THE HINDUSTAN PETROLEUM CORPORATION LTD. A Government of India<br />

Company registered under the Companies Act, 1956, having its registered office at<br />

17, Jamshedji Tata Road, Bombay - 400 020 (hereinafter called "the <strong>Corporation</strong>"<br />

which expression shall include its successors and assigns) having<br />

awarded to M/s ___________________________________________________ a partnership<br />

firm/sole proprietor business/a company registered under the Companies Act, 1956<br />

having its office at ______________________________ (hereinafter referred to as<br />

"the Supplier" which expression shall wherever the subject or context so permits<br />

includes its successors and assigns) a supply contract in terms inter alia, of<br />

"the <strong>Corporation</strong>'s" Order No. ____________ dated __________________ and the<br />

General purchase conditions of "the <strong>Corporation</strong>" and upon the condition of<br />

"supplier's" furnishing security for the performance of "the Supplier's"<br />

obligations and/or discharge of "the supplier's" liability under and/or in<br />

connection with the said supply contract upto a sum of _______________<br />

(Rupees_____________________) amounting to 10% (ten percent) of the total contract<br />

value.<br />

We, ______________________ (hereinafter called "the Bank" which expression shall<br />

include its successors and assigns) hereby jointly and severally undertake and<br />

guarantee to pay to "the <strong>Corporation</strong>" in rupees forthwith on demand in writing and<br />

without protest or demur of any and all moneys anywise payable by "the Supplier"<br />

to "the <strong>Corporation</strong>" under, in respect of or in connection with the said supply<br />

contract inclusive of all the <strong>Corporation</strong>'s losses and damage and costs,<br />

(inclusive between attorney and client) charges, and expenses and other moneys<br />

anywise payable in respect of the above as specified in any notice of demand made<br />

by "the <strong>Corporation</strong>" to the Bank with reference to this Guarantee upto and<br />

aggregate limit of ___________ (Rupees __________________________ ) and "the<br />

Bank" hereby agrees with "the <strong>Corporation</strong>" that:<br />

1. This Guarantee/Undertaking shall be a continuing Guarantee / Undertaking<br />

and shall remain valid and irrecoverable for all claims of "the<br />

<strong>Corporation</strong>" and liabilities of "the Supplier" arising upto and until<br />

midnight of _______________<br />

2. This Guarantee/Undertaking shall be in addition to any other guarantee or<br />

security whatsoever that "the <strong>Corporation</strong>" may now or any time anywise have<br />

in relation to "the Supplier's obligation/liabilities under and/or<br />

connection with the said supply contract, and "the <strong>Corporation</strong>" shall have<br />

full authority to take recourse to or enforce this security in preference<br />

to the other security(ies) at its sole discretion and no failure on the<br />

part of "the <strong>Corporation</strong>" to enforcing or requiring enforcement to any<br />

other security shall have the effect of releasing "the Bank" from its full<br />

liability hereunder.<br />

3. "The <strong>Corporation</strong>" shall be at liberty without reference to "the Bank" and<br />

without affecting the full liability of "the Bank" hereunder to take any<br />

other security in respect of "the Supplier's" obligation and/or liabilities


under or in connection with the said supply contract and to vary the term<br />

vis-a-vis "the supplier" of the said supply contract or to grant time<br />

and/or indulgence to "the Supplier" or to reduce or to increase or<br />

otherwise vary the prices of the total contract value or to release or to<br />

forebear from enforcement of all or any of the obligations of "the<br />

supplier" under the said supply contract and/or the remedies of "the<br />

<strong>Corporation</strong>" under any other security(ies) now or hereafter held by "the<br />

<strong>Corporation</strong>" and no such dealing(s), variation(s) or other indulgence(s) or<br />

agreement(s) with "the supplier" or release of forbearance whatsoever shall<br />

have the effect of releasing "the Bank" from its full liability to "the<br />

<strong>Corporation</strong>" hereunder or of prejudicing<br />

rights of "the <strong>Corporation</strong>" against "the Bank".<br />

4. This Guarantee/Undertaking shall not be determined or affected by the<br />

liquidation or winding up, dissolution or change of constitution or<br />

insolvency of "the supplier" but shall in all respects and for all purposes<br />

be binding and operative until payment of all moneys payable to "the<br />

<strong>Corporation</strong>" in terms hereof.<br />

5."The Bank" hereby waives all rights at any time inconsistent with the<br />

terms of this Guarantee/Undertaking and the obligations of "the Bank" in<br />

terms hereof shall not be anywise affected or suspended by reason of any<br />

dispute having been raised by "the suppliers" (whether or not pending<br />

before any arbitrator, officer, tribunal or court) or any denial of<br />

liability by "the supplier" or any other order of communication whatsoever<br />

by "the supplier" stopping or preventing or purporting to stop or prevent<br />

any payment by "the Bank" to "the <strong>Corporation</strong>" in terms hereof.<br />

6.The amount stated in any notice of demand addressed by "the <strong>Corporation</strong>"<br />

to "the Bank" as liable to be paid to "the <strong>Corporation</strong>" by "the supplier"<br />

or as suffered or incurred by "the <strong>Corporation</strong>" on account of any losses or<br />

damages or costs, charges/and/or expenses shall be as between "the Bank"<br />

and "the <strong>Corporation</strong>" be conclusive of the amount so liable to be paid to<br />

"the <strong>Corporation</strong>" or suffered or incurred by "the <strong>Corporation</strong>", as the case<br />

may be, and payable by "the Bank" to "the <strong>Corporation</strong>", in terms hereof.<br />

7. Not withstanding anything contained herein above :<br />

i) Our liability under this guarantee shall not exceed ..........<br />

ii) This Bank Guarantee shall be valid upto and including .......; and<br />

iii) We are liable to pay the guarantee amount or any part thereof under this Bank<br />

Guarantee only and only if you serve upon us a written claim or demand on or #<br />

before the expiry of 30 days from the date of expiry of this guarantee.<br />

8. "The Bank" has power to issue this guarantee in favour of "the <strong>Corporation</strong>" in<br />

terms of the documents and/or the agreement/contract or MOU entered into between<br />

"the supplier" and "the Bank" in this regard.<br />

IN WITNESS Where of __________________ Bank, has executed this document at<br />

________________ on _______________ 2012 .<br />

____________________________ Bank<br />

(by its constituted attorney)<br />

(signature of a person authorized to<br />

sign on behalf of "the Bank")


Tender No. : 12000050-HB-12001 Tender Published On : 24-Jul-2012 17:14<br />

NSIC Certificate<br />

Sl.No. Description HPCL File HPCL Value Supporting<br />

Doc. Req'd<br />

1 Please provide valid NSIC Certificate if applicable - Allowed


Tender No. : 12000050-HB-12001 Tender Published On : 24-Jul-2012 17:14<br />

Declaration by Vendors<br />

Sl.No. Description HPCL File HPCL Value Supporting<br />

Doc. Req'd<br />

1 Please confirm that you have not been banned or delisted by any Govt or Quasi<br />

Govt agencies OR PSUs. Iy yes , please provide the details of the same.<br />

- Allowed


Tender No. : 12000050-HB-12001 Tender Published On : 24-Jul-2012 17:14<br />

Evaluation Criteria<br />

Sl.No. Description HPCL File HPCL Value Supporting<br />

Doc. Req'd<br />

1 Evaluation Criteria: Evaluation shall be done on itemwise lowest delivered cost for<br />

supply plus commissioing charges of respective items. Hence vendor should quote<br />

accordingly. If vandor quotes for supply of ROVs & not quoted for commissioing of<br />

the respective ROV, then their offer will not be considered for evaluation.<br />

- No