24.08.2013 Views

Small Hydro Development in Nayar river valley in Lesser ... - ESHA

Small Hydro Development in Nayar river valley in Lesser ... - ESHA

Small Hydro Development in Nayar river valley in Lesser ... - ESHA

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

DIVERSION WEIR<br />

To be designed to pass the probable maximum flood<br />

through gates.<br />

With narrow diversion sites the cost of construct<strong>in</strong>g a<br />

weir with gates becomes higher due to excavation<br />

cost for widen<strong>in</strong>g the <strong>river</strong> section to provide enough<br />

section to pass the flood.<br />

For Santoodhar – II<br />

- Cost of ungated overflow weir Rs. 34.33 Million<br />

- Cost of gated weir Rs. 52.45 Million<br />

Hence, overflow type ungated weir<br />

with under sluice adopted.<br />

25

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!