Format Dx Project Works - Eskom
Format Dx Project Works - Eskom
Format Dx Project Works - Eskom
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
THE INSURED (Continued)<br />
• 3 •<br />
THE SCHEDULE (Continued)<br />
v) To the extent required by or provided for in any Contract or Agreement.<br />
i) Suppliers Manufacturers Vendors or other persons undertaking work<br />
at The Contract Site in respect of liability loss or damage arising out of<br />
their activities on The Contract Site including during the loading for<br />
transport to The Contract Site, transit thereto and offloading thereon.<br />
ii) Transport Contractors and persons providing Storage Facilities, Plant<br />
Owners and/or Operators in respect of liability loss or damage arising<br />
out of the Contract.<br />
iii) <strong>Project</strong> Managers and all other Engineering Consultants, Architects,<br />
Land Surveyors, Quantity Surveyors, Advisors or Consultants or any<br />
other Professional Party in respect of their involvement in the<br />
performance of the Contract at The Contract Site but excluding loss<br />
damage or liability arising out of neglect act error or omission in the<br />
professional service for which they are appointed.<br />
For their respective rights and interests.<br />
It is agreed that The Insured includes officers, employees and contract staff<br />
Subject always that the terms of General Memorandum No. 1 shall apply to i) ii) iii) iv) and v) above.<br />
THE PERIOD OF INSURANCE:<br />
a) From 01 April 2008 to 31 March 2009<br />
b) And any subsequent period for which the Insured shall pay and the Insurers shall agree to accept<br />
Renewal premium.<br />
c) Any subsequent period as provided for in terms of General memorandum 10 of this policy<br />
d) Followed by a Contractual Defects Liability or Maintenance Period not exceeding 12 months