ETA-10-0423-ATS evo - Etanco
ETA-10-0423-ATS evo - Etanco
ETA-10-0423-ATS evo - Etanco
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Page 5 of <strong>ETA</strong>-<strong>10</strong>/<strong>0423</strong>, issued on 13.12.20<strong>10</strong>, English translation prepared by ZAG<br />
materials (comparison with nominal values) by verifying dimensions and determining the<br />
material properties, e.g. tensile strength, hardness, surface finish<br />
The manufactured components of the anchor shall be subjected to the following tests:<br />
− Dimensions of the component parts:<br />
screw (thread, lengths, wrench, marking);<br />
sleeve (length, thickness, catch size);<br />
cone (thread, diameters);<br />
hexagonal nut (thread, wrench, height);<br />
washer (diameter, thickness).<br />
− Material properties:<br />
screw (yielding and ultimate tensile strength);<br />
sleeve (hardness);<br />
cone (hardness);<br />
hexagonal nut (proof load or hardness);<br />
washer (hardness).<br />
− Visual control of correct assembly and of completeness of the anchor.<br />
The factory production control shall be in accordance with the “Control Plan” of<br />
13.12.20<strong>10</strong> relating to the European technical approval <strong>ETA</strong>–<strong>10</strong>/<strong>0423</strong> issued on<br />
13.12.20<strong>10</strong>, which is part of the technical documentation of this European technical<br />
approval. The “Control Plan” is laid down in the context of the factory production control<br />
system operated by the manufacturer and deposited at the Slovenian National Building<br />
and Civil Engineering Institute (ZAG).<br />
The results of factory production control shall be recorded and evaluated in accordance<br />
with the provisions of the “Control Plan”.<br />
3.2.1.2 Other tasks of the manufacturer<br />
The manufacturer shall, on the basis of a contract, involve a body which is approved for<br />
the tasks referred to in a section 3.1 in the field of torque-controlled expansion anchors in<br />
order to undertake the actions laid down in section 3.3. For this purpose the “Control<br />
Plan” referred to in sections 3.2.1.1 and 3.2.2 shall be handed over by the manufacturer<br />
to the approved body or bodies involved.<br />
The manufacturer shall make a declaration of conformity, stating that the construction<br />
product is in conformity with the provisions of the European technical approval <strong>ETA</strong>–<br />
<strong>10</strong>/<strong>0423</strong> issued on 13.12.20<strong>10</strong>.<br />
3.2.2 Tasks of notified bodies<br />
The notified body shall perform the:<br />
- initial type testing of the product,<br />
- initial inspection of factory and of factory production control,<br />
- continuous surveillance, assessment and approval of factory production control.<br />
in accordance with the provisions laid down in the “Control plan” of 13.12.20<strong>10</strong>, which is<br />
the part of technical documentation of this European technical approval.<br />
The notified body shall retain the essential points of its actions referred to above and state<br />
the results obtained and conclusions drawn in a written report.<br />
The notified certification body involved by the manufacturer shall issue an EC certificate<br />
of conformity control stating the conformity with the provisions of this European technical<br />
approval.