20100204-3055 FERC PDF (Unofficial) 02/04/2010<br />

<strong>Project</strong> <strong>No</strong>. <strong>405</strong>-087 8<br />

Modification (4) would coordinate the results of this study with those from study<br />

3.6. Because studies 3.5 and 3.6 both address the effectiveness of upstream passage at<br />

the Conowingo dam, the findings of each study may be useful in the interpretation and<br />

conclusions drawn in the other. Therefore, the study reports from each of these two<br />

studies (3.5 and 3.6) should discuss the relevant findings from both studies, to the extent<br />

they are useful in interpreting the data and making recommendations for improving the<br />

effectiveness of upstream passage at the east fish lift.<br />

Staff recommends incorporation of modification (5) in order to avoid confusion in<br />

the study results.<br />

Modification (6) addresses the possible need for additional field study in 2011<br />

based on the results of 2010 studies. Staff do not consider it appropriate at this time to<br />

assume that additional study will be necessary. However, Exelon should clarify that<br />

additional tests of agency-recommended project manipulations may be required in 2011<br />

if the Commission determines that the information would be needed to evaluate any<br />

proposed, recommended, or required measures.<br />

Interior’s recommendations to assess the influence of all independent variables on<br />

radio-tagged fish movement and behavior, determine the location of all tagged fish<br />

before, during, and after changes to project operations, and plot the hourly locations on<br />

plan view maps would all add to the value of the study for evaluating the need for any<br />

additional 2011 field work and, ultimately, evaluating any proposed, recommended, or<br />

required measures.<br />

Interior’s recommendation to add additional remote monitoring stations to detect<br />

radio-tagged fish has merit because Interior’s recommended new locations would<br />

otherwise be unsampled under Exelon’s proposed study design. Placing a station directly<br />

below the spillway would help identify if fish get lost and/or stranded in this area. By<br />

placing a station somewhere between the tailrace and Port Deposit (the site of station 8),<br />

additional information about shad behavior may be learned, especially as it relates to<br />

passage delays which could be affecting upstream passage effectiveness.<br />

3.6 Conowingo East Fish Lift Attraction Flows<br />

In this study, Exelon plans to study the relationship between shad passage and<br />

attraction flow velocities during the 2010 shad passage season (and possibly 2011).<br />

Exelon also plans to review 2008 and 2009 “historical data” from the East fish lift and<br />

produce a report discussing the historical and current data along with data gathered<br />

during study 3.5 Upstream Fish Passage Effectiveness Study.