20100204-3055 FERC PDF (Unofficial) 02/04/2010<br />

<strong>Project</strong> <strong>No</strong>. <strong>405</strong>-087 6<br />

Shortnose and Atlantic Sturgeon Life History Studies (Study 3.22)<br />

In order to inform an evaluation of potential protection, mitigation, or<br />

enhancement measures, the study plan must be revised to indicate that the study report<br />

will include a comparison between the Conowingo fish lift and any East Coast passage<br />

facilities where successful shortnose or Atlantic sturgeon upstream passage has been<br />

documented. Also, Exelon must consult with Commerce on the deployment of a second<br />

array of receivers near the mouth of the Susquehanna River to monitor the lower river for<br />

sturgeon tagged with acoustic transmitters, in addition to the array proposed by Exelon<br />

near the project dam.<br />

Dreissenid Mussel Monitoring Study (Study 3.24)<br />

The study plan must be revised to clarify in section 3.24.2 that zebra mussel<br />

veligers (larvae) were documented during 2009 at the Peach Bottom Atomic Power<br />

Station intake canal.<br />

Creel Survey of Conowingo Pond and the Susquehanna River below Conowingo Dam<br />

(Study 3.25)<br />

In order to obtain an accurate representation of angler use at the project, the study<br />

plan must be revised to include an aerial count schedule which includes counts conducted<br />

during peak fishing times, both in the morning and evening, in addition to mid-day. The<br />

schedule must also consist of either randomized sampling between weekdays and<br />

weekends, or a near-equivalent sampling of each period.<br />

Recreational Inventory and Needs Assessment (Study 3.26)<br />

The plan proposes a literature review to identify recreational organizations that<br />

would be utilized as data sources as well as surveyed via phone. To ensure that sufficient<br />

input from the angling community is solicited, the list of entities included in the literature<br />

review phone surveys must include fishing organizations within the project because of<br />

the apparent popularity of angling. Also, in order to accurately evaluate whether existing<br />

recreation facilities and access to the Susquehanna River in the investigation area are<br />

meeting current user needs, Task 1 of section 3.26.7 (methodology) must be expanded to<br />

include on-site surveys conducted at Fisherman’s Park and downstream fishing sites<br />

within the project boundary.<br />

To ensure recreational safety is adequately assessed in terms of current project<br />

operation, the study plan must be revised to indicate that the location of the line<br />

designated to restrict boaters from accessing the tailrace will specifically be re-evaluated<br />

as part of the study.