H. Eleveld
Parijs <strong>20</strong>10<br />
• Totaal 27 papers geen bijdrage NL<br />
• De papers zijn verdeeld onder de B3 leden<br />
• De leden van B3 hebben een samenvatting<br />
plus leesadvies geschreven<br />
• Samenvatting plus deze presentatie is<br />
( komt) digitaal beschikbaar<br />
2
Leden NSC B3: Substations<br />
K.P. Knol ( voorzitter) Liandon B.V.<br />
F.L. Baldinger Locamation Control Systems B.V.<br />
H. Eleveld (secretaris) KEMA CONSULTING<br />
D. Boender Stedin Netbeheer B.V.<br />
T van Rijn Alliander N.V.<br />
A.J.P.M Geraerds Essent Energie<br />
C.G.A. Koreman TenneT<br />
J.J.M. Langedijk Siemens Nederland N.V.<br />
M. van Meggelen AREVA T&D Nederland BV)<br />
E de Meulemeester KEMA CONSULTING<br />
M. Rienks TenneT<br />
T.G. Spriensma Eurovolt Consultancy BV.<br />
J.L. Verpoorten ABB Energie B.V.<br />
A. Visser SBI Connectors Espana S.A<br />
J.A. Wiersma Stedin Netbeheer BV.<br />
J.J Smit TU Delft<br />
3
The four main strategic directions for CIGRE technical activities and as<br />
well for SC B3 Substations are:<br />
· The Electrical Power System of the Future: Smart super<br />
Equipmt.<br />
grids, smart grids...<br />
· Making best use of the existing power system<br />
50GW wind<br />
in the North?<br />
· Focus on environment and substainability<br />
· Communication on power system issues to the<br />
audience<br />
PS1 : 13 papers<br />
Advances in substations technologies<br />
PS2 : 14 papers<br />
Increased bulk transmission<br />
30GW sun<br />
DC links and<br />
interconnections<br />
in the south?<br />
Substation Developments 4<br />
Control<br />
Source: Nexans<br />
4
An internet-like grid<br />
Central & local sources<br />
Integration of<br />
new applications<br />
Central & local<br />
intelligence<br />
Smart (power)<br />
electronics<br />
5<br />
5
Preferential subjects (PS)<br />
The four main strategic directions for CIGRE technical activities and as<br />
well for SC B3 Substations are:<br />
· The Electrical Power System of the Future: super<br />
grids, smart grids...<br />
· Making best use of the existing power system<br />
· Focus on environment and substainability<br />
· Communication on power system issues to the<br />
audience<br />
PS1 : 13 papers<br />
Advances in substations technologies<br />
PS2 : 14 papers<br />
Substation Developments<br />
6
PS1: Advances in substations<br />
technologies<br />
• Substations in case of stronger constraints with<br />
respect to footprint and environment<br />
• (severe climatic conditions and public amenity)<br />
• EHV/UHV substations<br />
• Design and construction of substations for<br />
offshore wind farms<br />
• Design of GIL for bulk power transmission<br />
7
PS2: Substation Developments<br />
• Impacts of future network concept, e.g. “smart grids”,<br />
on substation design, primary and secondary<br />
• Connecting new renewable generation incl. offshore<br />
substations.<br />
• Coping with major growth, (mega-cities and<br />
metropolitan areas)<br />
• Designs for least environmental impact.<br />
• Innovative designs/layouts to increase operational<br />
flexibility, overcome site constraints (including<br />
economical consequences)<br />
• Impact and experience of the process bus on the<br />
substation as a whole<br />
8
Papers PS1 :<br />
• B3-101 Real-time monitoring and Capture of Power System<br />
Transients<br />
9
Papers PS1 :<br />
• B3-102 Compact Substation for Quick Installation<br />
10
Papers PS1 :<br />
• B3-103 Service experience of IEC 61850 Process Bus using Non<br />
Conventional Instrument Transformers and implications<br />
in the evolution of High Voltage Switching Plant<br />
11
Papers PS1 :<br />
• B3-104 Electrical and Non-Electrical Evironment of Wind<br />
Turbine Main Components<br />
12
Papers PS1 :<br />
• B3-105 Developing a Roadmap for Introduction of IEC61850<br />
based solutions for HV substations in the Republic of<br />
Ireland<br />
13
Papers PS1 :<br />
• B3-106 A new solution for space saving of substations in Tehran<br />
Regional Electric Company<br />
14
Papers PS1 :<br />
• B3-107 The challenge for busbar disconnectors of gas<br />
insulated switchgear (GIS) in a 4<strong>20</strong>kV mixed technology<br />
(Hybrid) substation<br />
15
Papers PS1 :<br />
• B3-108 DIGITAL SUBSTATION – Tests of Process Bus with GIS<br />
Non Conventional Instrument Transformers<br />
16
Papers PS1 :<br />
• B3-109 TRACTION POWER SUBSTATIONS BUILT IN THE TUNNEL<br />
OF THE SIERRA DE GUADARRAMA<br />
• Paper cancelled<br />
17
Papers PS1 :<br />
• B3-110 Valencia Plan, model project to integrate facilities into<br />
the environment and reduce spaces<br />
18
Papers PS1 :<br />
• B3-111 FIRST MULTIVENDOR 400 KV TRANSMISSION LINE<br />
PROTECTION SCHEME USING AN IEC 61850-9-2<br />
DIGITAL NETWORK FOR OPTICAL CT´S AND<br />
PROTECTION RELAYS<br />
<strong>19</strong>
Papers PS1 :<br />
• B3-112 Optimal robot navigation for inspection and<br />
surveillance in electric substations<br />
<strong>20</strong>
Papers PS1 :<br />
• B3-113 DESIGN CHALLENGES IN THE 765kV AIR INSULATED<br />
SUBSTATION<br />
21
leesadvies PS1 :<br />
• B3-102 Compact Substation for Quick Installation<br />
– Special reporter Question 1.2:<br />
– What are the drivers for the implementation of fast deployment installations?<br />
– How necessary or effective is the standardization of the equipment design?<br />
– What about the installation period for such temporary use? Are there other<br />
– experiences in mobile substation application?<br />
• B3-105 Developing a Roadmap for Introduction of IEC61850<br />
based solutions for HV substations in the Republic of<br />
Ireland<br />
– Special reporter Question 1.3:<br />
– Is IEC 61850 the right tool for smart grid implementation?<br />
– Is there already enough service experience to evaluate IEC 61850 for complex<br />
systems?<br />
– What are the consequences for substation operations?<br />
– Which testing methods are suggested to be applied, in particular for the use in<br />
systems like smart grids?<br />
22
leesadvies PS1 :<br />
• B3-106 A new solution for space saving of substations in<br />
Tehran Regional Electric Company<br />
– Special reporter Question 1.6:<br />
– However are there examples of projects, where such a solution does not work?<br />
– What about the cost-effectiveness of integration of substations and lines into the<br />
geographic service area?<br />
– Are these applications with reduced footprint also of interest, even if there is<br />
enough space available?<br />
• B3-107 The challenge for busbar disconnectors of gas<br />
insulated switchgear (GIS) in a 4<strong>20</strong>kV mixed technology<br />
(Hybrid) substation<br />
– Special reporter Question 1.7:<br />
– Are there already experiences with such mixed solution installations in this<br />
regard?<br />
– What have manufacturers done or plan to solve these problems?<br />
– Are there other problems to be expected, if AIS equipment and MTS equipment<br />
are mixed within a common substation?<br />
23
leesadvies PS1 :<br />
• B3-108 DIGITAL SUBSTATION – Tests of Process Bus with GIS<br />
Non Conventional Instrument Transformers<br />
24
PS2: Substation Developments<br />
• Impacts of future network concept, e.g. “smart grids”, on<br />
substation design, primary and secondary<br />
• Connecting new renewable generation incl. offshore<br />
substations.<br />
• Coping with major growth, (mega-cities and metropolitan areas)<br />
• Designs for least environmental impact.<br />
• Innovative designs/layouts to increase operational flexibility,<br />
overcome site constraints (including economical consequences)<br />
• Impact and experience of the process bus on the substation as<br />
a whole<br />
25
PS2: Substation Developments<br />
• Impacts of future network concept, e.g. “smart grids”, on<br />
substation design, primary and secondary<br />
• Connecting new renewable generation incl. offshore<br />
substations.<br />
• Coping with major growth, (mega-cities and metropolitan areas)<br />
• Designs for least environmental impact.<br />
• Innovative designs/layouts to increase operational flexibility,<br />
overcome site constraints (including economical consequences)<br />
• Impact and experience of the process bus on the substation as<br />
a whole<br />
26
Papers PS2 :<br />
• B3-<strong>20</strong>1 On-line monitoring of substation condition – a Romanian<br />
experience<br />
27
Papers PS2 :<br />
• B3-<strong>20</strong>2 The on-line monitoring systems combined with Decision<br />
Support System for HV and EHV Terna’s Substations<br />
maintenance<br />
28
Papers PS2 :<br />
• B3-<strong>20</strong>3 Recycling, uprating and upgrading of a High Voltage<br />
Substation located at downtown of a big city<br />
29
Papers PS2 :<br />
• B3-<strong>20</strong>4 Applying IEC 60865 on Low tension Inter-plant Spans in<br />
EHV Switchyards<br />
30
Papers PS2 :<br />
• B3-<strong>20</strong>6 ENHANCEMENT OF SUBSTATION RELIABILITY BY<br />
RETROFITTING EXISTING BUS CONFIGURATION APPLYING<br />
HYBRID SWITCHGEAR<br />
32
Papers PS2 :<br />
• B3-<strong>20</strong>7 Safety analysis for Grounding Potential Rise of Two<br />
Neighbouring Substations: Case Study of Metropolitan<br />
Electricity Authority’s System<br />
33
Papers PS2 :<br />
• B3-<strong>20</strong>8 Monitoring and condition assessment for GIS substations<br />
and GIL<br />
34
Papers PS2 :<br />
• B3-<strong>20</strong>9 Short circuit Uprating, methodology throughout the<br />
diversity of required skills On behalf of B3-23<br />
35
Papers PS2 :<br />
• B3-210 Design Experience of 230/115/69kV Substation<br />
Refurbishment / ExtensionProject in Philippine Grid<br />
Network<br />
36
Papers PS2 :<br />
• B3-213 On-site tests at UHV substation<br />
39
Papers PS2 :<br />
• B3-214 QUALITY ANALYSIS OF CONNECTORS USED IN THE<br />
UPRATING OF SAN CARLOS AND CHIVOR SUBSTATIONS<br />
40
Leesadvies PS2 :<br />
• B3-<strong>20</strong>4 Applying IEC 60865 on Low tension Inter-plant Spans in<br />
EHV Switchyards<br />
– Special reporter Question 2.3:<br />
– Do other utilities also have experiences in this regard? Are there specific geometries<br />
or other design solutions which could be recommended for bundled conductors and<br />
spacer distribution?<br />
• B3-<strong>20</strong>7 Safety analysis for Grounding Potential Rise of Two<br />
Neighbouring Substations: Case Study of Metropolitan<br />
Electricity Authority’s System<br />
– Special reporter Question 2.6:<br />
– Are there known grounding problems of this type in substations?<br />
– Is the support of manufactures sufficient for the utilities? Who is doing the job?<br />
• B3-213 On-site tests at UHV substation<br />
– Special reporter Question 2.11: What is the optimized on-site test procedure to ensure<br />
the proper functionality of<br />
– the equipment? What are the test experiences of UHV substations so far? Can<br />
– improvements be suggested already?<br />
41
Leesadvies PS2 :<br />
• B3-214 QUALITY ANALYSIS OF CONNECTORS USED IN THE<br />
UPRATING OF SAN CARLOS AND CHIVOR SUBSTATIONS<br />
– Special reporter Question 2.14:<br />
– What are the experiences of other utilities with the quality of connectors?<br />
– Can manufacturers give information about how to define quality?<br />
– Are there other elements in the power line through a substation which need more<br />
attention?<br />
42