<strong>Voorbereidingsdagen</strong><br />

15-16 <strong>augustus</strong> <strong>20</strong>12<br />

NSC B3<br />

H. Eleveld


Parijs <strong>20</strong>10<br />

• Totaal 27 papers geen bijdrage NL<br />

• De papers zijn verdeeld onder de B3 leden<br />

• De leden van B3 hebben een samenvatting<br />

plus leesadvies geschreven<br />

• Samenvatting plus deze presentatie is<br />

( komt) digitaal beschikbaar<br />

2


Leden NSC B3: Substations<br />

K.P. Knol ( voorzitter) Liandon B.V.<br />

F.L. Baldinger Locamation Control Systems B.V.<br />

H. Eleveld (secretaris) KEMA CONSULTING<br />

D. Boender Stedin Netbeheer B.V.<br />

T van Rijn Alliander N.V.<br />

A.J.P.M Geraerds Essent Energie<br />

C.G.A. Koreman TenneT<br />

J.J.M. Langedijk Siemens Nederland N.V.<br />

M. van Meggelen AREVA T&D Nederland BV)<br />

E de Meulemeester KEMA CONSULTING<br />

M. Rienks TenneT<br />

T.G. Spriensma Eurovolt Consultancy BV.<br />

J.L. Verpoorten ABB Energie B.V.<br />

A. Visser SBI Connectors Espana S.A<br />

J.A. Wiersma Stedin Netbeheer BV.<br />

J.J Smit TU Delft<br />

3


The four main strategic directions for CIGRE technical activities and as<br />

well for SC B3 Substations are:<br />

· The Electrical Power System of the Future: Smart super<br />

Equipmt.<br />

grids, smart grids...<br />

· Making best use of the existing power system<br />

50GW wind<br />

in the North?<br />

· Focus on environment and substainability<br />

· Communication on power system issues to the<br />

audience<br />

PS1 : 13 papers<br />

Advances in substations technologies<br />

PS2 : 14 papers<br />

Increased bulk transmission<br />

30GW sun<br />

DC links and<br />

interconnections<br />

in the south?<br />

Substation Developments 4<br />

Control<br />

Source: Nexans<br />

4


An internet-like grid<br />

Central & local sources<br />

Integration of<br />

new applications<br />

Central & local<br />

intelligence<br />

Smart (power)<br />

electronics<br />

5<br />

5


Preferential subjects (PS)<br />

The four main strategic directions for CIGRE technical activities and as<br />

well for SC B3 Substations are:<br />

· The Electrical Power System of the Future: super<br />

grids, smart grids...<br />

· Making best use of the existing power system<br />

· Focus on environment and substainability<br />

· Communication on power system issues to the<br />

audience<br />

PS1 : 13 papers<br />

Advances in substations technologies<br />

PS2 : 14 papers<br />

Substation Developments<br />

6


PS1: Advances in substations<br />

technologies<br />

• Substations in case of stronger constraints with<br />

respect to footprint and environment<br />

• (severe climatic conditions and public amenity)<br />

• EHV/UHV substations<br />

• Design and construction of substations for<br />

offshore wind farms<br />

• Design of GIL for bulk power transmission<br />

7


PS2: Substation Developments<br />

• Impacts of future network concept, e.g. “smart grids”,<br />

on substation design, primary and secondary<br />

• Connecting new renewable generation incl. offshore<br />

substations.<br />

• Coping with major growth, (mega-cities and<br />

metropolitan areas)<br />

• Designs for least environmental impact.<br />

• Innovative designs/layouts to increase operational<br />

flexibility, overcome site constraints (including<br />

economical consequences)<br />

• Impact and experience of the process bus on the<br />

substation as a whole<br />

8


Papers PS1 :<br />

• B3-101 Real-time monitoring and Capture of Power System<br />

Transients<br />

9


Papers PS1 :<br />

• B3-102 Compact Substation for Quick Installation<br />

10


Papers PS1 :<br />

• B3-103 Service experience of IEC 61850 Process Bus using Non<br />

Conventional Instrument Transformers and implications<br />

in the evolution of High Voltage Switching Plant<br />

11


Papers PS1 :<br />

• B3-104 Electrical and Non-Electrical Evironment of Wind<br />

Turbine Main Components<br />

12


Papers PS1 :<br />

• B3-105 Developing a Roadmap for Introduction of IEC61850<br />

based solutions for HV substations in the Republic of<br />

Ireland<br />

13


Papers PS1 :<br />

• B3-106 A new solution for space saving of substations in Tehran<br />

Regional Electric Company<br />

14


Papers PS1 :<br />

• B3-107 The challenge for busbar disconnectors of gas<br />

insulated switchgear (GIS) in a 4<strong>20</strong>kV mixed technology<br />

(Hybrid) substation<br />

15


Papers PS1 :<br />

• B3-108 DIGITAL SUBSTATION – Tests of Process Bus with GIS<br />

Non Conventional Instrument Transformers<br />

16


Papers PS1 :<br />

• B3-109 TRACTION POWER SUBSTATIONS BUILT IN THE TUNNEL<br />

OF THE SIERRA DE GUADARRAMA<br />

• Paper cancelled<br />

17


Papers PS1 :<br />

• B3-110 Valencia Plan, model project to integrate facilities into<br />

the environment and reduce spaces<br />

18


Papers PS1 :<br />

• B3-111 FIRST MULTIVENDOR 400 KV TRANSMISSION LINE<br />

PROTECTION SCHEME USING AN IEC 61850-9-2<br />

DIGITAL NETWORK FOR OPTICAL CT´S AND<br />

PROTECTION RELAYS<br />

<strong>19</strong>


Papers PS1 :<br />

• B3-112 Optimal robot navigation for inspection and<br />

surveillance in electric substations<br />

<strong>20</strong>


Papers PS1 :<br />

• B3-113 DESIGN CHALLENGES IN THE 765kV AIR INSULATED<br />

SUBSTATION<br />

21


leesadvies PS1 :<br />

• B3-102 Compact Substation for Quick Installation<br />

– Special reporter Question 1.2:<br />

– What are the drivers for the implementation of fast deployment installations?<br />

– How necessary or effective is the standardization of the equipment design?<br />

– What about the installation period for such temporary use? Are there other<br />

– experiences in mobile substation application?<br />

• B3-105 Developing a Roadmap for Introduction of IEC61850<br />

based solutions for HV substations in the Republic of<br />

Ireland<br />

– Special reporter Question 1.3:<br />

– Is IEC 61850 the right tool for smart grid implementation?<br />

– Is there already enough service experience to evaluate IEC 61850 for complex<br />

systems?<br />

– What are the consequences for substation operations?<br />

– Which testing methods are suggested to be applied, in particular for the use in<br />

systems like smart grids?<br />

22


leesadvies PS1 :<br />

• B3-106 A new solution for space saving of substations in<br />

Tehran Regional Electric Company<br />

– Special reporter Question 1.6:<br />

– However are there examples of projects, where such a solution does not work?<br />

– What about the cost-effectiveness of integration of substations and lines into the<br />

geographic service area?<br />

– Are these applications with reduced footprint also of interest, even if there is<br />

enough space available?<br />

• B3-107 The challenge for busbar disconnectors of gas<br />

insulated switchgear (GIS) in a 4<strong>20</strong>kV mixed technology<br />

(Hybrid) substation<br />

– Special reporter Question 1.7:<br />

– Are there already experiences with such mixed solution installations in this<br />

regard?<br />

– What have manufacturers done or plan to solve these problems?<br />

– Are there other problems to be expected, if AIS equipment and MTS equipment<br />

are mixed within a common substation?<br />

23


leesadvies PS1 :<br />

• B3-108 DIGITAL SUBSTATION – Tests of Process Bus with GIS<br />

Non Conventional Instrument Transformers<br />

24


PS2: Substation Developments<br />

• Impacts of future network concept, e.g. “smart grids”, on<br />

substation design, primary and secondary<br />

• Connecting new renewable generation incl. offshore<br />

substations.<br />

• Coping with major growth, (mega-cities and metropolitan areas)<br />

• Designs for least environmental impact.<br />

• Innovative designs/layouts to increase operational flexibility,<br />

overcome site constraints (including economical consequences)<br />

• Impact and experience of the process bus on the substation as<br />

a whole<br />

25


PS2: Substation Developments<br />

• Impacts of future network concept, e.g. “smart grids”, on<br />

substation design, primary and secondary<br />

• Connecting new renewable generation incl. offshore<br />

substations.<br />

• Coping with major growth, (mega-cities and metropolitan areas)<br />

• Designs for least environmental impact.<br />

• Innovative designs/layouts to increase operational flexibility,<br />

overcome site constraints (including economical consequences)<br />

• Impact and experience of the process bus on the substation as<br />

a whole<br />

26


Papers PS2 :<br />

• B3-<strong>20</strong>1 On-line monitoring of substation condition – a Romanian<br />

experience<br />

27


Papers PS2 :<br />

• B3-<strong>20</strong>2 The on-line monitoring systems combined with Decision<br />

Support System for HV and EHV Terna’s Substations<br />

maintenance<br />

28


Papers PS2 :<br />

• B3-<strong>20</strong>3 Recycling, uprating and upgrading of a High Voltage<br />

Substation located at downtown of a big city<br />

29


Papers PS2 :<br />

• B3-<strong>20</strong>4 Applying IEC 60865 on Low tension Inter-plant Spans in<br />

EHV Switchyards<br />

30


Papers PS2 :<br />

• B3-<strong>20</strong>6 ENHANCEMENT OF SUBSTATION RELIABILITY BY<br />

RETROFITTING EXISTING BUS CONFIGURATION APPLYING<br />

HYBRID SWITCHGEAR<br />

32


Papers PS2 :<br />

• B3-<strong>20</strong>7 Safety analysis for Grounding Potential Rise of Two<br />

Neighbouring Substations: Case Study of Metropolitan<br />

Electricity Authority’s System<br />

33


Papers PS2 :<br />

• B3-<strong>20</strong>8 Monitoring and condition assessment for GIS substations<br />

and GIL<br />

34


Papers PS2 :<br />

• B3-<strong>20</strong>9 Short circuit Uprating, methodology throughout the<br />

diversity of required skills On behalf of B3-23<br />

35


Papers PS2 :<br />

• B3-210 Design Experience of 230/115/69kV Substation<br />

Refurbishment / ExtensionProject in Philippine Grid<br />

Network<br />

36


Papers PS2 :<br />

• B3-213 On-site tests at UHV substation<br />

39


Papers PS2 :<br />

• B3-214 QUALITY ANALYSIS OF CONNECTORS USED IN THE<br />

UPRATING OF SAN CARLOS AND CHIVOR SUBSTATIONS<br />

40


Leesadvies PS2 :<br />

• B3-<strong>20</strong>4 Applying IEC 60865 on Low tension Inter-plant Spans in<br />

EHV Switchyards<br />

– Special reporter Question 2.3:<br />

– Do other utilities also have experiences in this regard? Are there specific geometries<br />

or other design solutions which could be recommended for bundled conductors and<br />

spacer distribution?<br />

• B3-<strong>20</strong>7 Safety analysis for Grounding Potential Rise of Two<br />

Neighbouring Substations: Case Study of Metropolitan<br />

Electricity Authority’s System<br />

– Special reporter Question 2.6:<br />

– Are there known grounding problems of this type in substations?<br />

– Is the support of manufactures sufficient for the utilities? Who is doing the job?<br />

• B3-213 On-site tests at UHV substation<br />

– Special reporter Question 2.11: What is the optimized on-site test procedure to ensure<br />

the proper functionality of<br />

– the equipment? What are the test experiences of UHV substations so far? Can<br />

– improvements be suggested already?<br />

41


Leesadvies PS2 :<br />

• B3-214 QUALITY ANALYSIS OF CONNECTORS USED IN THE<br />

UPRATING OF SAN CARLOS AND CHIVOR SUBSTATIONS<br />

– Special reporter Question 2.14:<br />

– What are the experiences of other utilities with the quality of connectors?<br />

– Can manufacturers give information about how to define quality?<br />

– Are there other elements in the power line through a substation which need more<br />

attention?<br />

42