13.10.2013 Views

Trogamid-T - Ferret

Trogamid-T - Ferret

Trogamid-T - Ferret

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

CENTRAL LUBRICATION INSTRUMENTS<br />

MONITORING PROGRAM FOR CENTRALIZED<br />

LUBRICATION<br />

User interface Win9x, NT4, 2000 or XP.<br />

OVAL D MEASURING STATION<br />

16/32/48/64/80 or 96<br />

measuring points/station<br />

Alarm relays<br />

SR6<br />

SR-30<br />

OILAN<br />

OVAL I/0 MEASURING STATION<br />

16/32 or 48<br />

measuring points/station<br />

THIRD PARTY CONNECTION<br />

Kytola's centralized oil lubrication monitoring<br />

system can be used with the conventional variable<br />

area flow meters (VE, KA, TLA) or the oval gear<br />

meters (SR).<br />

The system has been designed so that measurement<br />

or alarm signals can easily be passed on to upper<br />

level systems, such as PLC's, DCS's etc.<br />

The flow meter panels are delivered to the customer<br />

completely wired and tested.<br />

NK x ALARM AMPLIFIER<br />

x = the number of sensors<br />

(2/6/12/24/30)<br />

Supply 24 VAC/VDC, 110/230 VAC<br />

Relay 10A, 250 VAC<br />

Output<br />

KA<br />

TLA<br />

VE6A<br />

www.kytola.com<br />

7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!