25.10.2013 Views

Rose Valley Lake - Pennsylvania Fish and Boat Commission

Rose Valley Lake - Pennsylvania Fish and Boat Commission

Rose Valley Lake - Pennsylvania Fish and Boat Commission

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Non-Surface Use Oil <strong>and</strong> Gas<br />

Cooperative Agreement<br />

Mission: To protect, conserve, <strong>and</strong> enhance the Commonwealth’s aquatic resources <strong>and</strong><br />

provide fishing <strong>and</strong> boating opportunities


Mission: Protect, conserve, <strong>and</strong> enhance<br />

the Commonwealth’s aquatic resources*<br />

<strong>and</strong> provide fishing <strong>and</strong> boating<br />

opportunities<br />

<strong>Fish</strong> = fish, amphibians, reptiles, <strong>and</strong> “any<br />

plant or animal that grows or lives in or<br />

upon the water”


Rely on <strong>Fish</strong>ing Licenses, <strong>Boat</strong> Registrations, <strong>and</strong><br />

Related Federal Funds to do Almost Everything . . .


Declining License Sales<br />

1982 - Fee Raised by $3<br />

Sales drop by 7.75%<br />

1991 - $5 Trout/Salmon Stamp<br />

introduced Sales drop by 7.65%<br />

1996 - Fee Raised by $4.25<br />

Sales drop by 8.69%<br />

2005 - Fee Raised by $4.75 &<br />

Trout/Salmon Stamp Raised by $3<br />

Sales drop by 9.6%


Alternative Funding:<br />

Four Major Concepts


License Flexibility


Reimbursement for <strong>Commission</strong> Services<br />

257 US ACOE 404<br />

Permits<br />

20,000 Envelopes<br />

623 DEP Stream <strong>and</strong><br />

Wetl<strong>and</strong> Encroachment<br />

13 DEP Water Allocation<br />

Permits<br />

Permits<br />

902 Aquatic Herbicide<br />

Permits<br />

2900 PNDI<br />

Reviews<br />

325 Triploid<br />

Grass Carp<br />

Permits<br />

680 Timber Rattlesnake Hunt<br />

Permits<br />

2 FERC Hydropower Licenses<br />

135 Scientific Collectors<br />

50 PennDOT Projects<br />

(including 130 Stream <strong>and</strong><br />

Wetl<strong>and</strong> encroachments)<br />

69 Blasting Permits<br />

Permits<br />

12 L<strong>and</strong>fill<br />

Projects<br />

99 <strong>Lake</strong> Drawdown<br />

Permits<br />

142 Mining Permits<br />

Numbers per year


Consumptive Use & Degradation Fees


Natural Gas <strong>and</strong> Water Access


PFBC-Controlled L<strong>and</strong> & Water<br />

~14,000 Acres<br />

Within Marcellus<br />

Region (~43,000<br />

Statewide)<br />

40 Impoundments<br />

Within Marcellus<br />

Region


Natural Gas<br />

Adjoining properties are under lease<br />

Irresponsible to allow gas to be<br />

taken without compensation<br />

No Drilling on PFBC Properties<br />

Model agreement<br />

www.fish<strong>and</strong>boat.com/ngwa.htm


Water Access<br />

Minimize truck traffic<br />

Minimize impacts to other surface<br />

waters<br />

Strict monitoring <strong>and</strong> environmental<br />

requirements<br />

No impacts to anglers <strong>and</strong> boaters


<strong>Rose</strong> <strong>Valley</strong> <strong>Lake</strong><br />

<strong>Commission</strong> property<br />

is +/- 626.28-acres<br />

Located in Gamble<br />

Township, Lycoming<br />

County<br />

389 Acre<br />

Impoundment


BigStar Energy, LP<br />

5-year primary term<br />

$3,500 per acre up-front bonus = $2.14 million<br />

If well is not drilled within 30 months, BigStar<br />

pays additional $750 per acre, or $459,308<br />

18.25% royalty rate with a step-up rate of 19%<br />

upon documented well payout<br />

Non-surface use agreement<br />

Includes water monitoring & water protection<br />

provisions<br />

Money deposited into <strong>Fish</strong> Fund <strong>and</strong> used to<br />

repair high hazard dams


High-Hazard Dams in PA<br />

<strong>Pennsylvania</strong> has 3,254 dams<br />

775 classified as high-hazard by federal National<br />

Dam Safety Program, administered by state DEP<br />

<strong>Commission</strong> manages 56 of the dams<br />

38 are classified as high-hazard<br />

18 are further considered unsafe<br />

Funding level needed to repair <strong>Commission</strong>’s highhazard<br />

dams is estimated to be $125.5 million<br />

Funding for high-hazard, unsafe dams $34.5 million<br />

15


How Will the PFBC Use the Money?<br />

• 18 high-hazard, unsafe dams<br />

• 2 removed from list<br />

• Repairs underway on 6<br />

• Repairs planned for 3<br />

Criteria<br />

People impacted<br />

Cost/Funding<br />

Urgency<br />

Local support<br />

Economic impact<br />

<strong>Fish</strong>ing <strong>and</strong> boating<br />

• 7 remain unfunded 16


Questions?<br />

www.fish<strong>and</strong>boat.com

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!