10<br />
Bovanenkovo – Ukhta – Torzhok<br />
Gas Transmission System<br />
Route length – 2,540 kilometers,<br />
including new Bovanenkovo –<br />
Ukhta gas transmission corridor<br />
stretching for 1,240 kilometers<br />
(annual design capacity –<br />
140 billion m 3 of gas)<br />
and Ukhta – Torzhok gas pipeline<br />
stretching for 1,300 kilometers<br />
(annual design capacity –<br />
81.5 billion m 3 of gas).<br />
Bovanenkovo – Ukhta gas trunkline<br />
system was commissioned in 2012.<br />