10<br />

Bovanenkovo – Ukhta – Torzhok<br />

Gas Transmission System<br />

Route length – 2,540 kilometers,<br />

including new Bovanenkovo –<br />

Ukhta gas transmission corridor<br />

stretching for 1,240 kilometers<br />

(annual design capacity –<br />

140 billion m 3 of gas)<br />

and Ukhta – Torzhok gas pipeline<br />

stretching for 1,300 kilometers<br />

(annual design capacity –<br />

81.5 billion m 3 of gas).<br />

Bovanenkovo – Ukhta gas trunkline<br />

system was commissioned in 2012.<br />