Northern Tyumen Regions (SRTO) – Torzhok Gas<br />
Pipeline<br />
Gas pipeline length –<br />
2,200 kilometers. Number of<br />
compressor stations – 13<br />
(968 MW of total capacity). Design<br />
capacity – 20.5 to 28.5 billion m 3<br />
per year (at various sections).<br />
Linear section of gas pipeline was<br />
put onstream in 2006.<br />
10 compressor stations (CS) with<br />
total capacity of 743 MW were<br />
constructed in early 2010.<br />
Another three CS were put<br />
onstream in parallel with<br />
Bovanenkovo – Ukhta gas pipeline<br />
in 2012.<br />