<strong>ILC</strong> optimistic time schedule (Feb 2007)<br />
TENTATIVE OVERALL TIME SCHEDULE<br />
RDR/Reviews<br />
Bid to Host Specs<br />
Preparation of Bids to Host<br />
Site Selection Process<br />
Site Independent Eng. Studies<br />
(All CFS)<br />
EDR (All CFS)<br />
Selection of Main Consultants<br />
Site Investigations<br />
Call for Tender Preparation<br />
(CE Works + early Services)<br />
Call for Tender Procedure<br />
(CE Works + early Services)<br />
Contract(s) Placing<br />
(CE Works + early Services)<br />
Administrative Procedures<br />
+ Site Preparation Utilities<br />
CE + other CFS Works<br />
Machine Supply, Install, Assembly<br />
2007<br />
T 0 = 2012<br />
-5 -4 -3 -2 -1 +1 +2 +3 +4 +5 +6 +7<br />
2018<br />
Commissioning<br />
7-Feb-07<br />
R&D GDE/ACFA Closing<br />
Beijing<br />
Global Design Effort 14<br />
Winfried Mitaroff <strong>HEPHY</strong> Projektbericht, 19. November 2007