24.12.2013 Views

Hariyo Ban Program - Panda - WWF

Hariyo Ban Program - Panda - WWF

Hariyo Ban Program - Panda - WWF

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Objectives:<br />

The main objective of this assignment is to undertake feasibility of water supply for drinking and<br />

irrigation purposes, and develop a detail climate smart re-settlement plan to relocate Dheye communities<br />

in Thangchung of Upper Mustang.<br />

Methodology:<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

Preparation of plan of action with detailed framework of activities, criteria, schedule etc, to be<br />

agreed with <strong>Hariyo</strong> <strong>Ban</strong> <strong>Program</strong><br />

Desk top study to review relevant literature and other available information on water availability,<br />

land tenure, climate and non-climatic impacts and settlement patterns with demography and<br />

culture<br />

Prepare an inception report based on the available literature, agree on the methodology and make<br />

common understanding with <strong>Hariyo</strong> <strong>Ban</strong> core team<br />

Field visit and consultation with local communities at Dheye and other concerned stakeholders<br />

including government line agencies in the District<br />

Undertake water feasibility for drinking and irrigation purposes<br />

GIS mapping of the proposed sites<br />

Prepare detailed plan with clear sketches on type of infrastructure/land use proposed to develop a<br />

climate smart settlement in Thangchung<br />

Consultative meeting to sharing outputs at landscape and national levels<br />

Expected outputs:<br />

• Analysis of demography of population affected by climate change in Dheye village documented<br />

• Perception of community as well as GoN authorities on the existing Dheye situation and planned<br />

actions mapped and analysed based on the existing vulnerability assessment.<br />

• Detailed geographical information on proposed relocation site (Thangchung) studied and<br />

• documented<br />

• On-going development activities in the proposed resettlement site documented<br />

• Land tenure situation in proposed site analysed and recommendations made<br />

• Feasibility of proposed resettlement site studied in light of current conditions and likely future<br />

climate impacts<br />

• Feasibility study on water supply for drinking and irrigation purposes<br />

• Design of houses (local context specific) with costs<br />

• Land-use plan of resettlement area<br />

• Detailed climate smart settlement plan with estimate budget<br />

5. Deliverables<br />

The deliverables of the study are:<br />

• Inception report including detailed plan of action with detailed frame work activities,<br />

methodology to be applied, schedule etc<br />

• Draft report on feasibility study of water supply and resettlement plan<br />

• Final report incorporating comments and suggestions given by <strong>Hariyo</strong> <strong>Ban</strong> team<br />

• Other relevant maps, GIS layers, photographs, negatives and other relevant documents procured<br />

or produced under this contract, in digital and/or hard copy as appropriate, with related analysis,<br />

model, and diagrams<br />

Climate smart settlement Page 2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!