26.12.2013 Views

1 - USAid

1 - USAid

1 - USAid

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

I<br />

I'<br />

I<br />

I<br />

I<br />

I<br />

I<br />

I<br />

I<br />

I<br />

I<br />

I<br />

I<br />

I<br />

I<br />

I<br />

I<br />

I<br />

I<br />

1.13 ACCESS TO CLASSIFIED INFORMATION<br />

1.14 LOGISTIC SUPPORT<br />

1.lS<br />

T.O. #: 807<br />

The contractor will not have access to classified information.<br />

The contractor shall be responsible for all logistic support needed to successfully<br />

complete the contract. The BankThai Bank (BTB) will provide the following support for the<br />

work order under this task order:<br />

2 Project Assistants<br />

Training Room Equipped with Overhead Projector.<br />

LCD Projector and Computers<br />

Training Management Room with at least 2 Computers & Printers<br />

Lunches and Coffee Breaks During Training Sessions<br />

Hotel Accommodation at a Three Star Hotel for 2 trainers<br />

Per diem for 2 Trainers $SO per person per day<br />

Reproduction Materials for Trainees<br />

WORKWEEK<br />

The contractor is authorized up to a six-day workweek in the field with no premium<br />

pay.<br />

1.16 AUTHORIZED GEOGRAPHIC CODE<br />

The authorized geographic code for procurement of goods and services under this order<br />

is 93S.<br />

1.17 ADDITIONAL PROVISIONS<br />

Development of Workplan: At the commencement of work. following task order award. the contractor<br />

shall contact the bank at which training or other consulting work will be held and develop a<br />

detailed workplan in consultation with the bank. covering all aspects of the planned<br />

implementation of the work. A copy of the agreed-upon workplan shall be supplied to USAID as<br />

soon as the plan is developed. The workplan shall be updated as needed and appropriate during<br />

the implementation of the work.<br />

Final Report: After the conclusion of the work at each bank. the contractor shall prepare a<br />

final report summarizing the work carried out under the task order. including results achieved<br />

and problems encountered. This report shall be submitted in final form to USAID (ANE/SEA) in<br />

hard copy writing and electronic format (in Microsoft Word) by the completion date of the task<br />

Page S of 6

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!