Horn Thin Timber Sale - USDA Forest Service
Horn Thin Timber Sale - USDA Forest Service
Horn Thin Timber Sale - USDA Forest Service
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Horn</strong> <strong>Thin</strong> <strong>Timber</strong> <strong>Sale</strong><br />
Logging Feasibility Report<br />
North Nestucca EA<br />
Hebo Ranger District<br />
Siuslaw National <strong>Forest</strong><br />
Tillamook County, Oregon<br />
Prepared by: Matt Ruedy<br />
Date: July 19, 2013
<strong>Horn</strong> <strong>Thin</strong> <strong>Timber</strong> <strong>Sale</strong><br />
Table of Contents<br />
1. <strong>Sale</strong> Description<br />
2. Resource Management Objectives<br />
3. Unit Logging Summary and Yarding Method<br />
4. Line Capacities of Proposed Yarder and Carriage<br />
5. Estimated Labor<br />
6. Estimated DailyYarding Production<br />
7. Estimated Yarding Distances<br />
8. Unit Summary<br />
9. Payload Analysis Summary (Profile runs available at Hebo District)<br />
10. CT6.42# Contract Clause<br />
11. Logging Plan Narrative
<strong>Horn</strong> <strong>Thin</strong> <strong>Timber</strong> <strong>Sale</strong><br />
1. <strong>Sale</strong> Description:<br />
<strong>Horn</strong> <strong>Thin</strong> <strong>Timber</strong> <strong>Sale</strong> is a commercial thinning sale containing approximately 448<br />
acres. The sale area is located in sections 2, 3, 4, 5, 8, 9 & 10, T4S, R10W, W.M.,<br />
Tillamook County, Oregon. <strong>Forest</strong> <strong>Service</strong> roads 1023 and 1024 and numerous spur<br />
roads off of them access the seven units within the sale area.<br />
Douglas fir, western hemlock, red alder and Sitka spruce are the dominant species in<br />
most units. Directional felling may be required. As much as feasible big leaf maple will<br />
not be felled in the units. No Pacific yew was observed during stand exams, cruising and<br />
logging systems analyses. Any Pacific yew found during logging operations will not be<br />
felled. Minimum DBH for trees to be harvested is 7.0”. Trees less than 7.0” will be<br />
protected where practical.<br />
The sale is designed to yard with skyline (83%) and ground-based (17%) systems.<br />
There are areas that will need multi-span configurations to yard the unit or portions of<br />
them. These are shown on yarding maps.<br />
A yarder that has a 50 foot tower height was chosen to run in skyline analysis. A carriage<br />
that has multi-span capability and slackpulling capabilities was used in the analysis.<br />
Tail-trees are necessary on most skyline roads. Multiple stump anchors may be needed<br />
for some landing locations as they are located in younger stands, the existing trees may<br />
be too small and the existing stumps may be too old to use.<br />
A yarding system capable of lifting 20,000 pounds and transporting logs at least 1,200<br />
feet to the landing area.<br />
Ground based yarding shall be limited to slopes of 30 percent or less and use designated<br />
skid trails. All designated skid trails must be approved by the sale administrator.<br />
Trimble GIS was used to calculate unit acres and meet Region 6 Acreage Determination<br />
Standards.<br />
A string box was used to determine length for temporary roads.
<strong>Horn</strong> <strong>Thin</strong> <strong>Timber</strong> <strong>Sale</strong><br />
2. Resource Management Objectives:<br />
The stand prescriptions, unit layout, logging and transportation plans will be designed to<br />
meet the following resource objectives:<br />
- Develop stand into late-successional habitat consistent with the Northwest <strong>Forest</strong><br />
Plan and the Northern Coast Range Adaptive Management Area Late<br />
Successional Reserve Assessment.<br />
-<br />
- Manage riparian reserves consistent with the Northwest <strong>Forest</strong> Plan’s Aquatic<br />
Conservation Strategy.<br />
- Protect water quality and fish habitat in all streams.<br />
- Minimize soil disturbance during all phases of harvest activity.<br />
- Protect T&E wildlife species by limiting operating seasons.<br />
<strong>Horn</strong> <strong>Thin</strong> <strong>Timber</strong> <strong>Sale</strong><br />
3. Unit Logging Summary and Yarding Method:<br />
<strong>Sale</strong> Name: <strong>Horn</strong> <strong>Thin</strong><br />
Units: 164, 165, 166, 180, 184, 208 & 209.<br />
Ground Based Units: 165, 180, 184, 208 & 209<br />
Skyline Based Units: 164, 165, 166, 180, 184, 208 & 209<br />
Volume: 7.39 mmbf/15,010 ccf<br />
Tower: 50 ft. (Madill 6150 SPCM used in analysis)<br />
Carriage: Able to pass shackles and have slackpulling capabilities (Acme 20 used in<br />
analysis)<br />
Tractor: Crawler tractor for landing clearing<br />
Skidder
Delimber<br />
Loader/shovel<br />
Tail tree hardware<br />
Intermediate support rigging hardware<br />
Chokers: Length 12’, diameter ½”<br />
Tagline: Length 200’, diameter ½”<br />
<strong>Horn</strong> <strong>Thin</strong> <strong>Timber</strong> <strong>Sale</strong><br />
4. Line Capacities of Yarder and Proposed Carriage:<br />
Line Diameter Drum Capacity<br />
Skyline 0.875 2,000 feet/EIPS<br />
Mainline 0.625 2,300 feet/EIPS<br />
Haulback 0.50 4,300 feet/EIPS<br />
Strawline<br />
n/a<br />
Guyline 0.625 300 feet/EIPS<br />
Choker 0.50<br />
Carriage: Eagle Eaglet; 1,200 pounds<br />
<strong>Horn</strong> <strong>Thin</strong> <strong>Timber</strong> <strong>Sale</strong><br />
5. Estimated Labor:<br />
Yarding Labor<br />
Number<br />
Hooktender 1<br />
Rigging slinger 1<br />
Choker setter w/radio 1<br />
Choker setter 1<br />
Yarder engineer 1<br />
Loader operator 1<br />
Delimber operator 1<br />
Landing chaser 1
<strong>Horn</strong> <strong>Thin</strong> <strong>Timber</strong> <strong>Sale</strong><br />
6. Estimated daily yarding production:<br />
15 mbf/day net log scale<br />
<strong>Horn</strong> <strong>Thin</strong> <strong>Timber</strong> <strong>Sale</strong><br />
7. Estimated Yarding Distances:<br />
Unit # Average Yarding Distance Maximum Yarding Distance<br />
164 1,031’ 1,370’<br />
165 575’ 1,163’<br />
166 865’ 1,005’<br />
180 585’ 1,550’<br />
184 410’ 949’<br />
208 583’ 929’<br />
209 392’ 559’<br />
<strong>Horn</strong> <strong>Thin</strong> <strong>Timber</strong> <strong>Sale</strong><br />
8. Unit Summary:<br />
Stand/unit# Sky<br />
Acreage<br />
Ground<br />
Acreage<br />
New<br />
Temp<br />
Road<br />
Length<br />
(ft)<br />
Existing<br />
Temp<br />
Road<br />
Length<br />
(ft)<br />
# Corridors<br />
Skyline/Groundbase<br />
# Landings<br />
Skyline/Groundbase<br />
164 23.88 0 0 0 8/0 7<br />
165 96.18 11.69 0 1,883’ 87/25 43<br />
166 33.16 0 0 0 14/0 9<br />
180 148.53 36.64 91’ 505’ 122/40 77<br />
184 27.47 15.65 441’ 1,128’ 21/34 20<br />
208 21.66 0 0 697’ 16/0 7<br />
209 20.62 13.38 0 1,158’ 32/33 22<br />
Totals 371.50 77.36 532’ 5,371’ 300/132 185*<br />
*Multiple landings used for skyline/groundbase
<strong>Horn</strong> <strong>Thin</strong> <strong>Timber</strong> <strong>Sale</strong><br />
9. Payload Analysis Summary:<br />
Payload analysis calculations were based on a 0.875 diameter skyline cable and a 50 foot<br />
tower coupled with a carriage that can pass shackles and has lateral yarding capabilities.<br />
In order to gain adequate deflection, tailtrees were uses on most analyzed profiles.<br />
Additional lift can be gained in some cases by hanging across draws and up adjacent<br />
slopes.<br />
The payload analysis was determined by using the SkylineXL 3.01 Profile Analysis<br />
program and standing skyline or multi-span skyline systems. Adequate tree sizes are<br />
available for tailtrees and intermediate supports using a rigging height of up to 30 feet.<br />
Adequate payloads equate to three average logs or two long logs (whole tree length,<br />
measured from stump cut to 6.0” top).<br />
Net payloads to landing ranged from 4,184 lbs to 13,264 lbs.<br />
<strong>Horn</strong> <strong>Thin</strong> <strong>Timber</strong> <strong>Sale</strong><br />
10. CT6.42# Contract Clauses:<br />
CT6.42# SPECIAL YARDING/SKIDDING METHODS. (1/93) Methods other than<br />
those specified may be approved. When appropriate, such approval shall include changes<br />
in current contract rates and <strong>Sale</strong> Area Map shall be revised.<br />
1. Except during lateral yarding, the yarding system must keep one end suspended<br />
above ground during in-haul.<br />
2. The carriage shall be positioned such that during lateral yarding, logs are to be<br />
yarded away from stream courses.<br />
3. Ground-lead yarding is permitted within 50 feet of payment unit boundaries, 50<br />
feet of tail trees, and 50 feet of tower position.<br />
4. Skyline roads will be spaced so as to cause the least amount of damage to the<br />
residual stand. This may require spacing from no closer than 100 feet or no<br />
further apart than 150 feet at back end of the road when radial roads are used. If<br />
parallel roads are to be used design the distance to be 200 feet center to center.<br />
Where situations warrant changes to this the <strong>Forest</strong> <strong>Service</strong> will determine if this<br />
can change on a case by case basis.
5. When skyline, haulback or other cable pass through areas of residual trees or<br />
reproduction more than 18 inches in height, lines shall be pulled out of the<br />
residual trees or reproduction area prior to restringing the next skyline road.<br />
6. Skyline corridors shall be as narrow as possible but normally not exceed 12 feet in<br />
width.<br />
7. Location of all skyline roads shall be agreed and approved prior to felling and or<br />
yarding.<br />
8. Yarding across streams shall require logs to be fully suspended for 50 feet slope<br />
distance both sides of stream channel and or outside the buffered area.<br />
9. A slackpulling carriage able to maintain a fixed position on the skyline during<br />
lateral yarding and can pass over intermediate supports. The carriage must be<br />
capable of lateral yarding up to 75 feet from skyline. An extra 75’ of tagline may<br />
be needed on the end of the carriage choker.<br />
10. Tractor assist may be required.<br />
<strong>Horn</strong> <strong>Thin</strong> <strong>Timber</strong> <strong>Sale</strong><br />
11. Logging Plan Narrative:<br />
All unit boundaries are marked with blue boundary tags, blue ribbon and orange paint.<br />
All landings are marked with yellow tags and florescent pink flagging.<br />
All temporary spurs (existing and new) are marked with yellow tags and solid blue/white<br />
flagging.<br />
Minor clearing is required for some landings.<br />
Landings are located to minimize yarding over buffered stream and headwalls.<br />
All roads and landings will be reviewed on the ground by a District hydrologist and the<br />
<strong>Forest</strong> transportation planner for the timber sale appraisal and contract.<br />
Log hauling will be limited to dry season on most temporary roads because of cost<br />
associated with the quantity of rock needed.<br />
There are perennial streams and headwalls that exist within the units. Theses areas will<br />
be buffered and excluded from the units. Buffer boundaries will be marked on the
ground to protect slope stability and water quality. Full log suspension is required over<br />
streams and headwalls. Intermittent streams will not be buffered.<br />
Skyline landings generally use fan-shaped and parallel settings, with most turnroads<br />
using single-span configurations. Tailholding on opposing slopes is emphasized, where<br />
opportunities exist, to reduce the need for tailtrees and intermediate supports.<br />
Where yarding will occur over streams, some areas may lack the deflection necessary to<br />
obtain full suspension of logs during whole-tree yarding. Shorter log lengths will be<br />
required over these areas.<br />
Some ground-based logging is planned in units 165, 180, 184, 208 & 209. Most of the<br />
remaining units will require some loader/shovel logging along the roadway or on<br />
designated skid trails.<br />
Directional felling may be needed in several units. Extra tagline may be needed in areas<br />
that require directional felling.<br />
Units 164, 165, 166, 184, 208 & 209 contain ½ acre and 1 acre “gaps”. Largest Doug fir<br />
in middle of gap designated with orange tracer paint.<br />
Units 165 and 184 have survey monuments and bearing trees. These are designated with<br />
orange tracer paint and are identified on sale area maps.
General Information<br />
Unit # : 164<br />
Stand # :<br />
302164<br />
Legal Location:<br />
S4, T4S, R10W, W.M., Tillamook Co., OR Acres: 23.88<br />
Photo Number: 35-11a 72 Residual TPA Post Harvest:<br />
65<br />
Silvicultural Prescription: DxD 16 Residual TPA Post DWD & Snags:<br />
5<br />
Recon by/Date:<br />
M.Ruedy, 4/2013<br />
Source of volume estimate:<br />
Power Lines:<br />
Invasive/Sensitive Plants:<br />
Dump Sites:<br />
Survey Monuments:<br />
Improvements:<br />
<strong>Horn</strong> <strong>Thin</strong> Unit Summary sheet<br />
Hebo Ranger District<br />
Volume Information<br />
Cruise Estimated Volume:<br />
Special Considerations<br />
Yes No Yes No<br />
x<br />
Fences:<br />
x<br />
x<br />
Heritage Sites:<br />
x<br />
x<br />
Meadows:<br />
x<br />
x<br />
Water Systems:<br />
x<br />
x<br />
Other:<br />
x<br />
Road and Landing Information<br />
Landing Road Type<br />
Road Existing or<br />
Length New<br />
Landing<br />
164A 1023 Existing<br />
164B 1023 Existing<br />
164C 1023 Existing<br />
164D 1023 Existing<br />
164E 1023 Existing<br />
164F 1023 Existing<br />
164G 1023 Existing<br />
Road Type<br />
393 mbf/800 ccf<br />
Road<br />
Length<br />
Existing<br />
or New<br />
Notes
Landing<br />
Logging<br />
System Type<br />
Guyline<br />
Anchor<br />
Trees<br />
Logging Systems Information<br />
Multiple<br />
Guy<br />
Anchors<br />
Special<br />
Anchors<br />
Intermediate<br />
Supports<br />
Tailtrees<br />
Logging Profiles Run<br />
and Azimuth/Length<br />
164A S B 1 TT, 20<br />
164B S B 1 TT, 20<br />
164C S B 1 TT, 20<br />
164D S B 1 TT, 20<br />
164E S B 1 TT, 20 Yes 359, 1,127<br />
164F S B 1 TT, 20<br />
164G S B 1 TT, 20<br />
Key: Logging System abbreviations are Skyline (S), Ground-Based (GB), Yoader (Y), Helicopter (H), or a combination of<br />
logging systems for each landing. Guyline anchor trees abbreviations are P for plantation, M for mature, and B for both.<br />
Special anchor abbreviations are Equipment (Eq), Deadmen (D), Earth (E), guyline (G) anchor, and tailhold (T).<br />
Abbreviations for intermediate supports (IS) and tailtree (TT).<br />
Average Yarding Distance:<br />
Average Mainline Tension:<br />
Maximum Tagline Needed:<br />
Maximum Yarding Distance:<br />
Unit Totals and Averages<br />
1,031'<br />
Average Net Pound per Payload: 7,039 lbs<br />
6,671 lbs Average Slope:<br />
45%<br />
10' Total Number of Corridors:<br />
8<br />
1,370' Total Number of Landings:<br />
7<br />
Notes
General Information<br />
Unit # : 165<br />
Stand # :<br />
302165<br />
Legal Location:<br />
S2,3,10,11, T4S, R10W, W.M., Tillamook Co., OR Acres: 107.87<br />
Photo Number: 35-11a 70 Residual TPA Post Harvest:<br />
75<br />
Silvicultural Prescription: DxD 15 Residual TPA Post DWD & Snags:<br />
5<br />
Recon by/Date:<br />
M.Ruedy 4/2013<br />
Source of volume estimate:<br />
Power Lines:<br />
Invasive/Sensitive Plants:<br />
Dump Sites:<br />
Survey Monuments:<br />
Improvements:<br />
<strong>Horn</strong> <strong>Thin</strong> Unit Summary sheet<br />
Hebo Ranger District<br />
Volume Information<br />
Cruise Estimated Volume:<br />
1,771 mbf/3,604 ccf<br />
Special Considerations<br />
Yes No Yes No<br />
x<br />
Fences:<br />
x<br />
x<br />
Heritage Sites:<br />
x<br />
x<br />
Meadows:<br />
x<br />
x<br />
Water Systems:<br />
x<br />
x<br />
Other:<br />
x<br />
Road and Landing Information<br />
Landing Road Type<br />
Road Existing or<br />
Road Existing<br />
Landing Road Type<br />
Length New<br />
Length or New<br />
165A,B,C 1024 Existing 165AA,BB 1024112 Existing<br />
165D,E,F 1024 Existing 165CC,DD 1024112 Existing<br />
165G,H,I 1024 Existing 165EE,FF 1024112 Existing<br />
165J,K,L 1024 Existing 165GG,HH 1024112 Existing<br />
165M,N,O 1024 Existing 165II,JJ 1024112 Existing<br />
165P,Q 1024 Existing 165KK,LL 1024112 Existing<br />
165R-V non-system 745' Existing 165MM,NN 1024112 Existing<br />
165W,X,Y,Z 1024112 Existing 165OO,PP 1024112 Existing<br />
Existing 165QQ non-system 338' Existing<br />
Notes
Landing<br />
Logging<br />
System Type<br />
Guyline<br />
Anchor<br />
Trees<br />
Logging Systems Information<br />
Multiple<br />
Guy<br />
Anchors<br />
Special<br />
Anchors<br />
Intermediate<br />
Supports<br />
Tailtrees<br />
Logging Profiles Run<br />
and Azimuth/Length<br />
165A,B,C,D S,Y P TT, 20<br />
165E-I S,Y P TT, 20<br />
165J-Q S,Y P 9 TT, 20<br />
165R-V S,Y P TT, 20<br />
165W-CC S,Y M TT, 20<br />
165DD-GG S,Y P TT, 20<br />
165II S,Y P TT, 20<br />
165JJ S,Y P 2 TT, 20 Yes 10, 821<br />
165KK_PP S,Y P TT, 20<br />
165QQ S,Y P 3 TT, 20 Yes 45, 900<br />
Key: Logging System abbreviations are Skyline (S), Ground-Based (GB), Yoader (Y), Helicopter (H), or a combination of<br />
logging systems for each landing. Guyline anchor trees abbreviations are P for plantation, M for mature, and B for both.<br />
Special anchor abbreviations are Equipment (Eq), Deadmen (D), Earth (E), guyline (G) anchor, and tailhold (T).<br />
Abbreviations for intermediate supports (IS) and tailtree (TT).<br />
Average Yarding Distance:<br />
Average Mainline Tension:<br />
Maximum Tagline Needed:<br />
Maximum Yarding Distance:<br />
General Information: Total of 43 landings.<br />
Unit Totals and Averages<br />
575' Average Net Pound per Payload: 8,611 lbs<br />
9,413 lbs Average Slope:<br />
55%<br />
10' Total Number of Corridors:<br />
87<br />
1,185'<br />
Total Number of Landings:<br />
Notes
General Information<br />
Unit # : 166<br />
Stand # :<br />
302166<br />
Legal Location:<br />
S4, T4S, R10W, W.M., Tillamook Co., OR Acres: 33.16<br />
Photo Number: 34-10A 71 Residual TPA Post Harvest:<br />
75<br />
Silvicultural Prescription: DxD 15 Residual TPA Post DWD & Snags:<br />
5<br />
Recon by/Date:<br />
M.Ruedy 4/2013<br />
Source of volume estimate:<br />
Power Lines:<br />
Invasive/Sensitive Plants:<br />
Dump Sites:<br />
Survey Monuments:<br />
Improvements:<br />
<strong>Horn</strong> <strong>Thin</strong> Unit Summary sheet<br />
Hebo Ranger District<br />
Volume Information<br />
Cruise Estimated Volume:<br />
Special Considerations<br />
Yes No Yes No<br />
x<br />
Fences:<br />
x<br />
x<br />
Heritage Sites:<br />
x<br />
x<br />
Meadows:<br />
x<br />
x<br />
Water Systems:<br />
x<br />
x<br />
Other:<br />
x<br />
Road and Landing Information<br />
Landing Road Type<br />
Road Existing or<br />
Length New<br />
Landing<br />
166A 1023 Existing<br />
166B 1023 Existing<br />
166C 1023 Existing<br />
166D 1023 Existing<br />
166E 1023 Existing<br />
166F 1023 Existing<br />
166G 1023 Existing<br />
166H 1023 Existing<br />
166I 1023 Existing<br />
Road Type<br />
546 mbf/ 1,110 ccf<br />
Road<br />
Length<br />
Existing<br />
or New<br />
Notes
Landing<br />
Logging<br />
System Type<br />
Guyline<br />
Anchor<br />
Trees<br />
Logging Systems Information<br />
Multiple<br />
Guy<br />
Anchors<br />
Special<br />
Anchors<br />
Intermediate<br />
Supports<br />
Tailtrees<br />
Logging Profiles Run<br />
and Azimuth/Length<br />
166A S,Y P TT, 20 Yes 346, 750<br />
166B S,Y P TT, 20<br />
166C S,Y P TT, 20<br />
166D S,Y P TT, 20<br />
166E S,Y M TT, 20<br />
166F S,Y M TT, 20<br />
166G S,Y M TT, 20<br />
166H S,Y M TT, 20<br />
166I S,Y M TT, 20<br />
Key: Logging System abbreviations are Skyline (S), Ground-Based (GB), Yoader (Y), Helicopter (H), or a combination of<br />
logging systems for each landing. Guyline anchor trees abbreviations are P for plantation, M for mature, and B for both.<br />
Special anchor abbreviations are Equipment (Eq), Deadmen (D), Earth (E), guyline (G) anchor, and tailhold (T).<br />
Abbreviations for intermediate supports (IS) and tailtree (TT).<br />
Average Yarding Distance:<br />
Average Mainline Tension:<br />
Maximum Tagline Needed:<br />
Maximum Yarding Distance:<br />
Unit Totals and Averages<br />
865' Average Net Pound per Payload: 13,266 lbs<br />
13,388 lbs Average Slope:<br />
45%<br />
10' Total Number of Corridors:<br />
15<br />
1,004' Total Number of Landings:<br />
9<br />
Notes
General Information<br />
Unit # : 180<br />
Stand # :<br />
302180<br />
Legal Location:<br />
S4,5,8,9, T4S, R10W, W.W., Tillamook Co., OR Acres: 185.17<br />
Photo Number: 34-10A 71 Residual TPA Post Harvest:<br />
85<br />
Silvicultural Prescription: DxD 14 Residual TPA Post DWD & Snags:<br />
5<br />
Recon by/Date:<br />
M.Ruedy 4/2013<br />
Source of volume estimate:<br />
Power Lines:<br />
Invasive/Sensitive Plants:<br />
Dump Sites:<br />
Survey Monuments:<br />
Improvements:<br />
<strong>Horn</strong> <strong>Thin</strong> Unit Summary sheet<br />
Hebo Ranger District<br />
Volume Information<br />
Cruise Estimated Volume:<br />
3,041 mbf/ 6,186 ccf<br />
Special Considerations<br />
Yes No Yes No<br />
x<br />
Fences:<br />
x<br />
x<br />
Heritage Sites:<br />
x<br />
x<br />
Meadows:<br />
x<br />
x<br />
Water Systems:<br />
x<br />
x<br />
Other:<br />
x<br />
Road and Landing Information<br />
Landing Road Type<br />
Road Existing or<br />
Road Existing<br />
Landing Road Type<br />
Length New<br />
Length or New<br />
180A-J 1023 Existing 180K-T 1023112 Existing<br />
180AA-MM 1023 Existing 180U-Z 1023 Existing<br />
SSS-UUU non-system 505' Existing<br />
180OO-YY 1023114 Existing VVV-ZZZ 1023113 Existing<br />
180ZZ non-system 150' Existing<br />
AAA-EEE 1023114 Existing<br />
FFF-KKK 1023115 Existing<br />
LLL-QQQ 1023114 Existing<br />
180RRR non-system 91' New<br />
Notes
Landing<br />
Logging<br />
System Type<br />
Guyline<br />
Anchor<br />
Trees<br />
Logging Systems Information<br />
Multiple<br />
Guy<br />
Anchors<br />
Special<br />
Anchors<br />
Intermediate<br />
Supports<br />
Tailtrees<br />
Logging Profiles Run<br />
and Azimuth/Length<br />
180B S M 1 TT, 30 Yes 222, 1,900<br />
180A, C-J S,Y M 3 TT, 30<br />
180K-T S,Y M TT, 30<br />
180U-Z S,Y M TT, 30<br />
AA-MM S,Y B TT, 30<br />
TT, 30<br />
OO-ZZ S,Y B TT, 30<br />
AAA-QQQ Y P TT, 20<br />
RRR Y P TT, 20<br />
SSS-UUU Y P TT, 20<br />
VVV-ZZZ Y P TT, 20<br />
Key: Logging System abbreviations are Skyline (S), Ground-Based (GB), Yoader (Y), Helicopter (H), or a combination of<br />
logging systems for each landing. Guyline anchor trees abbreviations are P for plantation, M for mature, and B for both.<br />
Special anchor abbreviations are Equipment (Eq), Deadmen (D), Earth (E), guyline (G) anchor, and tailhold (T).<br />
Abbreviations for intermediate supports (IS) and tailtree (TT).<br />
Average Yarding Distance:<br />
Average Mainline Tension:<br />
Maximum Tagline Needed:<br />
Maximum Yarding Distance:<br />
Unit Totals and Averages<br />
585' Average Net Pound per Payload: 3,887 lbs<br />
4,184 lbs Average Slope:<br />
40%<br />
75' Total Number of Corridors:<br />
122<br />
1,550'<br />
Total Number of Landings:<br />
Notes<br />
General Information: Total number landings is 77. Directional fall timber in designated areas and 200' of tagline<br />
at end of chokers needed to log behind tailtrees.
General Information<br />
Unit # : 184<br />
Stand # :<br />
302184<br />
Legal Location:<br />
S2,10, T4S, R10W, W.M., Tilamook County, OR Acres: 43.12<br />
Photo Number: 35-11A 70 Residual TPA Post Harvest:<br />
85<br />
Silvicultural Prescription: DxD 14 Residual TPA Post DWD & Snags:<br />
5<br />
Recon by/Date:<br />
M.Ruedy 4/2013<br />
Source of volume estimate:<br />
Power Lines:<br />
Invasive/Sensitive Plants:<br />
Dump Sites:<br />
Survey Monuments:<br />
Improvements:<br />
Widow <strong>Thin</strong> Unit Summary sheet<br />
Hebo Ranger District<br />
Volume Information<br />
Cruise Estimated Volume:<br />
709 mbf/ 1,443 ccf<br />
Special Considerations<br />
Yes No Yes No<br />
x<br />
Fences:<br />
x<br />
x<br />
Heritage Sites:<br />
x<br />
x<br />
Meadows:<br />
x<br />
x<br />
Water Systems:<br />
x<br />
x<br />
Other:<br />
x<br />
Road and Landing Information<br />
Landing Road Type<br />
Road Existing or<br />
Road Existing<br />
Landing Road Type<br />
Length New<br />
Length or New<br />
184A 1024113 Existing 184K 1024113 Existing<br />
184B 1024113 Existing 184L 1024113 Existing<br />
184C 1024113 Existing 184M 1024113 Existing<br />
184D 1024113 Existing 184N 1024113 Existing<br />
184E 1024113 Existing 184O 1024113 Existing<br />
184F 1024113 Existing 184P-R 442' New<br />
184G 1024113 Existing 184S nonsystem 1,030' Existing<br />
184H 1024113 Existing 184T 1024 Existing<br />
184I 1024113 Existing<br />
184J nonsystem 99' Existing<br />
Notes
Landing<br />
Logging<br />
System Type<br />
Guyline<br />
Anchor<br />
Trees<br />
Logging Systems Information<br />
Multiple<br />
Guy<br />
Anchors<br />
Special<br />
Anchors<br />
Intermediate<br />
Supports<br />
Tailtrees<br />
Logging Profiles Run<br />
and Azimuth/Length<br />
184A S,Y P TT, 20<br />
184B S,Y P 1 TT, 20<br />
184C S,Y P 1 TT, 20<br />
184D S,Y P 1 TT, 20 Yes 7, 1,009<br />
184E S,Y P 1 TT, 20<br />
184F S,Y P TT, 20<br />
184G S,Y P 1 TT, 20<br />
184H S,Y P TT, 20<br />
184I S,Y P TT, 20<br />
184J S,Y,G P TT, 20<br />
184K S,Y P TT, 20<br />
184K S,Y P TT, 20<br />
184L S,Y P TT, 20<br />
184M S,Y,G P TT, 20<br />
184N S,Y,G P TT, 20<br />
184O S,Y,G P TT, 20<br />
184P,Q,R S,Y,G P TT, 20<br />
184S S,Y,G P TT, 20<br />
184T S,Y P TT, 20<br />
Key: Logging System abbreviations are Skyline (S), Ground-Based (GB), Yoader (Y), Helicopter (H), or a combination of<br />
logging systems for each landing. Guyline anchor trees abbreviations are P for plantation, M for mature, and B for both.<br />
Special anchor abbreviations are Equipment (Eq), Deadmen (D), Earth (E), guyline (G) anchor, and tailhold (T).<br />
Abbreviations for intermediate supports (IS) and tailtree (TT).<br />
Average Yarding Distance:<br />
Average Mainline Tension:<br />
Maximum Tagline Needed:<br />
Maximum Yarding Distance:<br />
Unit Totals and Averages<br />
410' Average Net Pound per Payload: 6,817 lbs<br />
5,255 lbs Average Slope:<br />
45%<br />
50' Total Number of Corridors:<br />
21<br />
949' Total Number of Landings:<br />
20<br />
Notes
General Information<br />
Unit # : 208<br />
Stand # :<br />
302208<br />
Legal Location:<br />
S10, T4S, R10W, W.M., Tillamook Co., OR Acres: 21.66<br />
Photo Number: 35-11A 69 Residual TPA Post Harvest:<br />
75<br />
Silvicultural Prescription: DxD 15 Residual TPA Post DWD & Snags:<br />
5<br />
Recon by/Date:<br />
M.Ruedy 4/2013<br />
Source of volume estimate:<br />
Power Lines:<br />
Invasive/Sensitive Plants:<br />
Dump Sites:<br />
Survey Monuments:<br />
Improvements:<br />
<strong>Horn</strong> <strong>Thin</strong> Unit Summary sheet<br />
Hebo Ranger District<br />
Volume Information<br />
Cruise Estimated Volume:<br />
Special Considerations<br />
Yes No Yes No<br />
x<br />
Fences:<br />
x<br />
x<br />
Heritage Sites:<br />
x<br />
x<br />
Meadows:<br />
x<br />
x<br />
Water Systems:<br />
x<br />
x<br />
Other:<br />
x<br />
Road and Landing Information<br />
Landing Road Type<br />
Road Existing or<br />
Length New<br />
Landing<br />
208A 1024 Existing<br />
208B 1024 Existing<br />
208C 1024 Existing<br />
208D 1024 Existing<br />
208E 1024 Existing<br />
208F 1024 Existing<br />
208G non-system 700' Existing<br />
Road Type<br />
356 mbf/ 725 ccf<br />
Road<br />
Length<br />
Existing<br />
or New<br />
Notes
Landing<br />
Logging<br />
System Type<br />
Guyline<br />
Anchor<br />
Trees<br />
Logging Systems Information<br />
Multiple<br />
Guy<br />
Anchors<br />
Special<br />
Anchors<br />
Intermediate<br />
Supports<br />
Tailtrees<br />
Logging Profiles Run<br />
and Azimuth/Length<br />
208A S P TT, 20<br />
208B S P TT, 20 Yes 100,1,080<br />
208C S P TT, 20<br />
208D S P TT, 20<br />
208E S P TT, 20<br />
208F S P TT, 20<br />
208G S P TT, 20 Yes 100, 922<br />
Key: Logging System abbreviations are Skyline (S), Ground-Based (GB), Yoader (Y), Helicopter (H), or a combination of<br />
logging systems for each landing. Guyline anchor trees abbreviations are P for plantation, M for mature, and B for both.<br />
Special anchor abbreviations are Equipment (Eq), Deadmen (D), Earth (E), guyline (G) anchor, and tailhold (T).<br />
Abbreviations for intermediate supports (IS) and tailtree (TT).<br />
Average Yarding Distance:<br />
Average Mainline Tension:<br />
Maximum Tagline Needed:<br />
Maximum Yarding Distance:<br />
Unit Totals and Averages<br />
583' Average Net Pound per Payload: 10,955 lbs<br />
8,662 lbs Average Slope:<br />
40%<br />
50' Total Number of Corridors:<br />
16<br />
929' Total Number of Landings:<br />
7<br />
Notes<br />
General Information: Large diameter trees outside unit for tailholds. Landings A-F are along road 1024.
General Information<br />
Unit # : 209<br />
Stand # :<br />
302209<br />
Legal Location:<br />
S9, T4S, R10W., W.M., Tillamook Co., OR Acres: 34<br />
Photo Number:<br />
Residual TPA Post Harvest:<br />
75<br />
Silvicultural Prescription: DxD 15 Residual TPA Post DWD & Snags:<br />
5<br />
Recon by/Date:<br />
M.Ruedy 4/2013<br />
Source of volume estimate:<br />
Power Lines:<br />
Invasive/Sensitive Plants:<br />
Dump Sites:<br />
Survey Monuments:<br />
Improvements:<br />
<strong>Horn</strong> <strong>Thin</strong> Unit Summary sheet<br />
Hebo Ranger District<br />
Volume Information<br />
Cruise Estimated Volume:<br />
Special Considerations<br />
Yes No Yes No<br />
x<br />
Fences:<br />
x<br />
x<br />
Heritage Sites:<br />
x<br />
x<br />
Meadows:<br />
x<br />
x<br />
Water Systems:<br />
x<br />
x<br />
Other:<br />
x<br />
Road and Landing Information<br />
Landing Road Type<br />
Road Existing or<br />
Road Existing<br />
Landing Road Type<br />
Length New<br />
Length or New<br />
209A 1024114 Existing 209Q 1024114 Existing<br />
209B 1024114 Existing 209R 1024114 Existing<br />
209C 1024114 Existing 209S 1024114 Existing<br />
209D 1024114 Existing 209T 1024114 Existing<br />
209E 1024114 Existing 209U non-system 186' Existing<br />
209F 1024114 Existing 209V 1024114 Existing<br />
209G-M non-system 972' Existing<br />
209N 1024114 Existing<br />
209O 1024114 Existing<br />
209P 1024114 Existing<br />
Notes<br />
559 mbf/ 1,139 ccf
Landing<br />
Logging<br />
System Type<br />
Guyline<br />
Anchor<br />
Trees<br />
Logging Systems Information<br />
Multiple<br />
Guy<br />
Anchors<br />
Special<br />
Anchors<br />
Intermediate<br />
Supports<br />
Tailtrees<br />
209V S B TT 3<br />
209A-D S B TT 3<br />
209E S B 1 TT 3<br />
209F S B 1 TT 3<br />
209G-J GB,Y P TT 3<br />
209K S,GB,Y P TT 3<br />
209L S,GB,Y P TT 3<br />
209M S,GB,Y P TT 3<br />
209N GB,Y M TT 3<br />
209O GB,Y M TT 3<br />
209P GB,Y M TT 10<br />
209Q Y M TT 10<br />
209R Y M TT 10<br />
209S Y M TT 10<br />
209T Y M TT 10<br />
209U S P TT 3<br />
209W S P TT 3<br />
Logging Profiles Run<br />
and Azimuth/Length<br />
Key: Logging System abbreviations are Skyline (S), Ground-Based (GB), Yoader (Y), Helicopter (H), or a combination of<br />
logging systems for each landing. Guyline anchor trees abbreviations are P for plantation, M for mature, and B for both.<br />
Special anchor abbreviations are Equipment (Eq), Deadmen (D), Earth (E), guyline (G) anchor, and tailhold (T).<br />
Abbreviations for intermediate supports (IS) and tailtree (TT).<br />
Average Yarding Distance:<br />
Average Mainline Tension:<br />
Maximum Tagline Needed:<br />
Maximum Yarding Distance:<br />
Unit Totals and Averages<br />
392' Average Net Pound per Payload: 13,455 lbs<br />
11,787 lbs Average Slope:<br />
75%<br />
20' Total Number of Corridors:<br />
32<br />
559'<br />
Total Number of Landings:<br />
Notes<br />
General Information: Landings U, A-F, K,L M,U,W will have to tailhold across <strong>Horn</strong> Creek to get adequate lift.<br />
Total number of landings is 22.
!(<br />
166<br />
!(<br />
!(<br />
!(<br />
!(<br />
!( !(<br />
!(<br />
!( !( !( !(!(<br />
!(!(!(<br />
180<br />
!( !(<br />
!(<br />
!(<br />
!(<br />
!(<br />
!( !(<br />
!(<br />
!(<br />
!( !(<br />
!( !(<br />
!( !(<br />
!( !(<br />
!(<br />
!(!(!( !(<br />
!(!(!(!(<br />
!(<br />
!( !( !(<br />
!( !( !( !( 180<br />
!( !( !( !( !(<br />
!(<br />
!(<br />
!(<br />
!( !(!(!(!(<br />
!(<br />
!(<br />
!(<br />
!(<br />
!(<br />
!(<br />
!(<br />
!(<br />
!(<br />
!(<br />
!(!(!(!(<br />
!( !(<br />
180<br />
!(<br />
!(!(!(<br />
!(<br />
!(<br />
!(<br />
!(<br />
164<br />
!( !(<br />
!( !(<br />
!(<br />
!(<br />
!(<br />
!(<br />
184<br />
!( !( !( !(<br />
!( !(!(<br />
!(<br />
!(<br />
!( !(<br />
!(!(<br />
!(<br />
184<br />
!(<br />
!(!(<br />
!(<br />
209<br />
!( !( !( !(!(<br />
!( !(<br />
!(<br />
!(<br />
!( !(!(!(!(<br />
!( !( !( !( !( !( !(<br />
!(<br />
!(<br />
208<br />
!( !(!( !(<br />
165<br />
!(<br />
!(<br />
!(<br />
!(<br />
!(<br />
!(<br />
!(<br />
!(<br />
!(!(<br />
!(<br />
!(<br />
165<br />
!( !(!(!(!( !(<br />
165<br />
!( !(!(<br />
!( !(!(!(!(!(!( !( !( !(<br />
!(<br />
!(!(!(!(<br />
!(<br />
!(!(<br />
!(<br />
!(<br />
!(<br />
!(!(<br />
1034116<br />
1034000<br />
1024116<br />
1024112<br />
1024117<br />
1024000<br />
1034126<br />
<strong>Horn</strong> <strong>Thin</strong><br />
Logging Systems Map<br />
1024113<br />
1023000<br />
1024120<br />
1024121<br />
1024114<br />
1024115<br />
0 375 750 1,500 2,250 3,000<br />
Feet<br />
Legend<br />
!( Landings<br />
Corridors<br />
SkidRoads<br />
Temporary Roads<br />
Existing Roads<br />
Subdivision Boundary