30.12.2013 Views

FLOORING TECHNOLOGIES - Bostik

FLOORING TECHNOLOGIES - Bostik

FLOORING TECHNOLOGIES - Bostik

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Application<br />

The soundness of the substrates should be checked prior to flooring screed<br />

applications. No application should be performed on the substrates that are not strong<br />

enough to bear their own weight.<br />

Swollen, flaked-off, loose substrates and old damaged layers should be removed from<br />

the surface before applying the flooring screeds.<br />

The substrate should be primed with a suitable primer in compliance with the<br />

absorbency and porosity of the floor.<br />

Bonding is excellent in the surfaces that are primed with right primer and the<br />

consumption is reduced. The durability and performance of the flooring screed to be<br />

applied on the top coat increase.<br />

Before the application, the powder material is poured into a clean container filled with<br />

clean water (please refer to mixing water ratio for flooring screeds) and slowly mixed<br />

with a low-speed mixer until obtaining a lump-free mixture for minimum 5 minutes.<br />

Flooring Technologies<br />

10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!