FLOORING TECHNOLOGIES - Bostik
FLOORING TECHNOLOGIES - Bostik
FLOORING TECHNOLOGIES - Bostik
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Application<br />
The soundness of the substrates should be checked prior to flooring screed<br />
applications. No application should be performed on the substrates that are not strong<br />
enough to bear their own weight.<br />
Swollen, flaked-off, loose substrates and old damaged layers should be removed from<br />
the surface before applying the flooring screeds.<br />
The substrate should be primed with a suitable primer in compliance with the<br />
absorbency and porosity of the floor.<br />
Bonding is excellent in the surfaces that are primed with right primer and the<br />
consumption is reduced. The durability and performance of the flooring screed to be<br />
applied on the top coat increase.<br />
Before the application, the powder material is poured into a clean container filled with<br />
clean water (please refer to mixing water ratio for flooring screeds) and slowly mixed<br />
with a low-speed mixer until obtaining a lump-free mixture for minimum 5 minutes.<br />
Flooring Technologies<br />
10