UTILITY SERVICES - <strong>ELECTRICITY</strong> SERVICES (CONSUMPTIVE)<br />
SERVICES RENDERED UNIT REMARKS 2012/13 VAT 2013/14 2013/14<br />
excl. VAT Yes/No Recalculated R<br />
excl. VAT incl. VAT<br />
RESIDENTIAL CONSUMERS<br />
Free basic electricity DOMESTIC kWh No free basic service<br />
Free basic electricity LIFELINE kWh Consumers receiving less than 250 kWh/month<br />
on average will be charged at the Lifeline Tariff<br />
and will receive a free basic supply of up to 60<br />
kWh per month. Consumers receiving between<br />
250 kWh and 450 kWh per month on average<br />
will receive a free basic supply of 25 kWh per<br />
month NOTE: Qualifying residential consumers<br />
using pre-payment meters will not receive the<br />
free basic service of electricity for months in<br />
which no energy is purchased unless this is<br />
specifically claimed at a vending outlet in each<br />
such month.<br />
The free 60 or 25 kWh forms part of the first<br />
block of 150 kWh for Lifeline consumers (e.g.<br />
first 60 kWh are free, next 90 kWh are at the<br />
appropriate rate.)<br />
Qualifying residential consumers using credit<br />
meters will be credited with as much of the free<br />
basic service of electricity as is used during the<br />
metering period.<br />
New residential consumers (supplies 450 kWh received/month)<br />
No free basic service<br />
Energy charge Block 1 c/kWh 0-150kWh 113.20 y 125.00 142.50<br />
2013/03/19 01:33 PM Utility Services - Electricity - Consumptive - 60kWh 51.1
UTILITY SERVICES - <strong>ELECTRICITY</strong> SERVICES (CONSUMPTIVE)<br />
SERVICES RENDERED UNIT REMARKS 2012/13 VAT 2013/14 2013/14<br />
excl. VAT Yes/No Recalculated R<br />
excl. VAT incl. VAT<br />
Block 2 c/kWh 150.1-350kWh 118.11 y 125.00 142.50<br />
Block 3 c/kWh 350.1-600kWh 118.11 y 125.00 142.50<br />
Block 4 c/kWh 600.1+kWh 140.18 y 152.00 173.28<br />
LIFELINE (
UTILITY SERVICES - <strong>ELECTRICITY</strong> SERVICES (CONSUMPTIVE)<br />
SERVICES RENDERED UNIT REMARKS 2012/13 VAT 2013/14 2013/14<br />
excl. VAT Yes/No Recalculated R<br />
excl. VAT incl. VAT<br />
SMALL POWER USERS (For supply up to a<br />
maximum of 500 kVA)<br />
SMALL POWER USERS 1 (High consumption -<br />
>1000 kWh / MONTH) This tariff will also be utilised for Net Metered<br />
Connections by small Commercial Consumers,<br />
where Consumers offset their small scale<br />
generation against their purchases from the<br />
Municipality, provided that their purchases<br />
exceed their generation over the prescribed<br />
period. An additional meter reading fee may<br />
also be applicable.<br />
Service charge R/day 19.16 y 20.67 23.56<br />
Energy charge c/kWh 103.40 y 111.52 127.13<br />
SMALL POWER USERS 2 (Low consumption -<br />
UTILITY SERVICES - <strong>ELECTRICITY</strong> SERVICES (CONSUMPTIVE)<br />
SERVICES RENDERED UNIT REMARKS 2012/13 VAT 2013/14 2013/14<br />
excl. VAT Yes/No Recalculated R<br />
excl. VAT incl. VAT<br />
LARGE POWER USERS (Medium Voltage)<br />
This tariff is compulsory for consumers with<br />
installed capacity above 1 MVA unless they elect<br />
to be supplied at the Time of Use tariff.<br />
Service charge R/day 31.91 y 34.42 39.24<br />
Energy charge c/kWh 50.39 y 54.35 61.96<br />
Demand charge R/kVA 150.03 y 161.82 184.47<br />
WHEELING TARIFF<br />
Energy Surcharge Firm c/kWh 14.07 y 15.18 17.31<br />
Non-Firm c/kWh 8.64 y 9.32 10.62<br />
MEDIUM VOLTAGE TIME OF USE TARIFF<br />
This tariff is only available at medium voltage.<br />
Service charge R/day 5 210.00 y 5 619.71 6 406.47<br />
Energy charge: High demand (June to August)<br />
Peak c/kWh 255.46 y 255.46 291.22<br />
Standard c/kWh 67.55 y 72.86 83.06<br />
Off Peak c/kWh 36.77 y 39.66 45.21<br />
Energy charge: Low demand (September to<br />
May)<br />
Peak c/kWh 72.53 y 78.23 89.18<br />
Standard c/kWh 45.00 y 51.59 58.81<br />
Off Peak c/kWh 31.91 y 34.71 39.57<br />
Demand charge R/kVA 81.03 y 87.39 99.62<br />
MEDIUM VOLTAGE TIME OF USE TARIFF<br />
(ATLANTIS)<br />
This tariff is only available at medium voltage<br />
and in Atlantis.<br />
Service charge R/day 5 210.00 y 5 210.00 5 939.40<br />
Energy charge: High demand (June to August)<br />
Peak c/kWh 255.46 y 255.46 291.22<br />
Standard c/kWh 67.55 y 67.55 77.01<br />
2013/03/19 01:33 PM Utility Services - Electricity - Consumptive - 60kWh 51.4
UTILITY SERVICES - <strong>ELECTRICITY</strong> SERVICES (CONSUMPTIVE)<br />
SERVICES RENDERED UNIT REMARKS 2012/13 VAT 2013/14 2013/14<br />
excl. VAT Yes/No Recalculated R<br />
excl. VAT incl. VAT<br />
Off Peak c/kWh 36.77 y 36.77 41.92<br />
Energy charge: Low demand (September to<br />
May)<br />
Peak c/kWh 72.53 y 72.53 82.68<br />
Standard c/kWh 45.00 y 45.00 51.30<br />
Off Peak c/kWh 31.91 y 31.91 36.38<br />
Demand charge R/kVA 81.03 y 81.03 92.37<br />
This tariff is only available at 66kV or 132kV<br />
HIGH VOLTAGE TIME OF USE TARIFF<br />
depending on the available network.<br />
Service charge R/day 5 210.00 y 5 619.71 6 406.47<br />
Energy charge: High demand (June to August)<br />
Peak c/kWh 247.80 y 247.80 282.49<br />
Standard c/kWh 65.52 y 70.67 80.56<br />
Off Peak c/kWh 35.67 y 38.47 43.86<br />
Energy charge: Low demand (September to<br />
May)<br />
Peak c/kWh 70.35 y 75.88 86.50<br />
Standard c/kWh 43.65 y 50.04 57.05<br />
Off Peak c/kWh 30.95 y 33.67 38.38<br />
Demand charge R/kVA 81.03 y 87.40 99.64<br />
TIME OF USE <strong>TARIFFS</strong>: HOURS OF<br />
OPERATION<br />
Peak: Weekdays 07:00 to 10:00; 18:00 to 20:00<br />
Standard: Weekdays 06:00 to 07:00; 10:00 to<br />
18:00; 20:00 to 22:00.<br />
Off peak: All other times<br />
LIGHTING <strong>TARIFFS</strong><br />
2013/03/19 01:33 PM Utility Services - Electricity - Consumptive - 60kWh 51.5
UTILITY SERVICES - <strong>ELECTRICITY</strong> SERVICES (CONSUMPTIVE)<br />
SERVICES RENDERED UNIT REMARKS 2012/13 VAT 2013/14 2013/14<br />
excl. VAT Yes/No Recalculated R<br />
excl. VAT incl. VAT<br />
STREET LIGHTING <strong>AND</strong> TRAFFIC<br />
SIGNALS<br />
R / 100 W per<br />
Energy charge<br />
burning hour 0.1134 y 0.1223 0.1394<br />
FLOODLIGHTING OF PRIVATE<br />
BUILDINGS<br />
Energy charge<br />
1. Subject to prior approval of the Director:<br />
Planning & Economic Development and the<br />
Director: Electricity Services. 2. Applicant to<br />
bear cost of equipment installation and removal.<br />
3. Ownership of all material shall vest in the<br />
Council.<br />
R / 100 W per<br />
burning hour 0.1238 y 0.1335 0.1522<br />