Republic of the Philippines<br />

COMMISSION ON AUDIT<br />

Regi<strong>on</strong>al Office <str<strong>on</strong>g>No</str<strong>on</strong>g>. III<br />

BIDS AND AWARDS COMMITTEE<br />

City of San Fernando, Pampanga<br />

Tel <str<strong>on</strong>g>No</str<strong>on</strong>g>. (045) 963-6114 • Telefax <str<strong>on</strong>g>No</str<strong>on</strong>g>. (045) 961-5139 • E-mail: coaregi<strong>on</strong>3@yahoo.com.ph• Website: www.coa.gov.ph<br />

BID BULLETIN NO. 2<br />

February 5, 2007<br />

C<strong>on</strong>tract Reference <str<strong>on</strong>g>No</str<strong>on</strong>g>: 2007-01<br />

C<strong>on</strong>tract Name: C<strong>on</strong>structi<strong>on</strong> of Two-Storey COA Provincial Satellite Office<br />

TO: All Prospective <str<strong>on</strong>g>Bid</str<strong>on</strong>g>ders<br />

In resp<strong>on</strong>se to the queries raised during the first pre-bid c<strong>on</strong>ference <strong>on</strong> February 5, 2007, the<br />

following amendments in the bid documents are hereby issued for the guidance of all<br />

c<strong>on</strong>cerned:<br />

REFERENCE CLARIFICATION/AMENDMENT/REITERATION<br />

BILL OF QUANTITIES<br />

ITEM NO. 1.07- Project<br />

Identificati<strong>on</strong> and Signage<br />

ITEM NO. 1.08 Building<br />

PermitsProject Identificati<strong>on</strong><br />

and Signage<br />

ITEM NO. 2.01 Demoliti<strong>on</strong><br />

of existing building including<br />

site clearing and cutting of<br />

trees.<br />

ITEM NO. 2.06 Gravel<br />

Fill/Beddings, G-1<br />

ITEM NO. 2.07 Soil<br />

Pois<strong>on</strong>ing and Termite<br />

C<strong>on</strong>trol<br />

ITEM NO. IV<br />

REINFORCING STEEL<br />

BARS<br />

ITEM NO. VI- MASONRY<br />

WORKS<br />

Specificati<strong>on</strong>s shall be in accordance with the Nati<strong>on</strong>al Building Code<br />

requirement<br />

<str<strong>on</strong>g>Bid</str<strong>on</strong>g>der shall not provide any bid in this pay item. The amount of<br />

P10,000.00 has been provided for this item since COA shall take care of<br />

securing the building permit. This amount shall not be billed by the<br />

c<strong>on</strong>tractor.<br />

Site identificati<strong>on</strong> <strong>on</strong> the dumpsite to be used in the hauling of debris and<br />

demolished materials shall be the resp<strong>on</strong>sibility of the c<strong>on</strong>tractor/bidder.<br />

Gravel beddings shall be applied <strong>on</strong> all footings, slab <strong>on</strong> fill and footing<br />

tie beam<br />

Brand to be used shall be at the minimum "Lentrex" or approved<br />

equivalent. Warranty shall be 5 years.<br />

Thickness of Steel Deck is 0.8mm (as per approved plan) instead of .08m<br />

as reflected in the BOQ.<br />

Quantity of 829.08 sq m is to be changed to two (2) separate pay items<br />

under this ITEM NO. VI, viz:<br />

6.01 4"CHB 472.sq.m.<br />

6.01 6"CHB 337.sq.m.<br />

ITEM NO. 7.02 Roofing<br />

and Roofdeck and Fire Exit<br />

This item includes polycarb<strong>on</strong>ate roofing, fire exit ladder and structural<br />

steel. Reference drawings are in A-4/7 and A-6/7. Thickness of<br />

polycarb<strong>on</strong>ate shall be 6mm twinwall.<br />

<str<strong>on</strong>g>Bid</str<strong>on</strong>g> <str<strong>on</strong>g>Bulletin</str<strong>on</strong>g> <str<strong>on</strong>g>No</str<strong>on</strong>g>. 2-C<strong>on</strong>structi<strong>on</strong> of Two-Storey COA Satellite Office 1:2


ITEM NO. VIII-<br />

MOISTURE AND<br />

THERMAL PROTECTION<br />

ITEM NO. 10.02-Floor and<br />

Wall Tiles<br />

Pay Item 4"x36" laminated<br />

wood planks<br />

Pay Item Rubberized Paint<br />

ITEM NO. 12.01-Pay Item<br />

Window-1 (W-1)<br />

ITEM NO. 12.01-Pay Item<br />

Window-2 (W-2)<br />

Reference drawings for this item shall be A-4/7 (Roof Plan).<br />

Waterproofing material shall be elastomeric paint or approved equivalent.<br />

Works for this item shall include provisi<strong>on</strong> of insulati<strong>on</strong> material.<br />

Material to be used shall be industrial type of rubberized paint<br />

Please disregard the specificati<strong>on</strong>s in the drawings (A-6/7, W-1). Bill of<br />

Quantities (BOQ) specificati<strong>on</strong>s shall prevail.<br />

Please disregard the specificati<strong>on</strong>s in the drawings (A-6/7, W-2). BOQ<br />

specificati<strong>on</strong>s shall prevail.<br />

ITEM NO. 12.03 Mirror<br />

Finish Stair Railings-Pay<br />

item 0.90mx.70m steel grilles<br />

OTHERS:<br />

SITE<br />

PLAN<br />

DEVELOPMENT<br />

PRE-BID CONFERENCE<br />

BID OPENING DATE<br />

BILLING AND PAYMENT<br />

<str<strong>on</strong>g>Bid</str<strong>on</strong>g> for this particular pay item shall already include the provisi<strong>on</strong> of<br />

12mm sq bar auxiliary rails.<br />

Land development is not part of this c<strong>on</strong>tract<br />

A sec<strong>on</strong>d pre-bid c<strong>on</strong>ference shall be held <strong>on</strong> February 12, 2007,<br />

1:30pm at the 3 rd Floor, COA Training Center.<br />

<str<strong>on</strong>g>Bid</str<strong>on</strong>g> opening date shall be <strong>on</strong> February 26, 2007 at 9:00am, 3 rd Floor,<br />

COA Training Center instead of the original date of February 19, 2007.<br />

Payment to c<strong>on</strong>tractor’s billings shall be in accordance with Secti<strong>on</strong> 32<br />

of the General C<strong>on</strong>diti<strong>on</strong>s of the C<strong>on</strong>tract included in the <str<strong>on</strong>g>Bid</str<strong>on</strong>g>ding<br />

Documents.<br />

It is understood that pertinent and appropriate provisi<strong>on</strong>s of the <str<strong>on</strong>g>Bid</str<strong>on</strong>g>ding Documents such as<br />

the Instructi<strong>on</strong>s to <str<strong>on</strong>g>Bid</str<strong>on</strong>g>ders, <str<strong>on</strong>g>Bid</str<strong>on</strong>g> Data Sheet, Bill of Quantities, General C<strong>on</strong>diti<strong>on</strong>s of the<br />

C<strong>on</strong>tract, Drawings and Technical Specificati<strong>on</strong>s are accordingly amended, clarified and<br />

reiterated accordingly.<br />

FLAVIA S. BLEZA<br />

BAC Chairman<br />