2008-09 Vandals - University of Idaho Athletics
2008-09 Vandals - University of Idaho Athletics
2008-09 Vandals - University of Idaho Athletics
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
A plan is in place for remodeling the Kibbie Dome<br />
to better suit the needs <strong>of</strong> its student-athletes. In<br />
September <strong>2008</strong>, <strong>Idaho</strong> student-athletes began<br />
to enjoy state-<strong>of</strong>-the-art athletic training and<br />
equipment rooms, as well as three newly-constructed<br />
classrooms.<br />
The first phase was remodeling the old shop and<br />
constructing a 120-seat classroom and two 20-seat<br />
classrooms.<br />
Next up was the remodel <strong>of</strong> the athletic training<br />
facility and equipment room. The athletic training<br />
room almost doubled in size with an increase <strong>of</strong> 1,680<br />
square feet for a total 3,520. Approximately 1,600<br />
square feet was added to the equipment room for a<br />
total <strong>of</strong> just more than 4,100.<br />
“Upgrading our facilities is <strong>of</strong> utmost importance<br />
for our student-athletes and the entire <strong>Idaho</strong> athletic<br />
department,” Director <strong>of</strong> <strong>Athletics</strong> Dr. Rob Spear said.<br />
“Constant facility improvement is a vital piece in our<br />
goal <strong>of</strong> becoming a premier athletic department.”<br />
facility enhancement<br />
Above: Views <strong>of</strong> the new 120-seat classroom<br />
Below/Left: The athletic training room increased<br />
by 1,680 square feet<br />
<strong>2008</strong>-<strong>09</strong> <strong>Idaho</strong> Vandal Basketball 29