bp and shell: rising risks in tar sands investments - Oil Change ...
bp and shell: rising risks in tar sands investments - Oil Change ...
bp and shell: rising risks in tar sands investments - Oil Change ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
APPENDICES<br />
Appendix 1: BP <strong>in</strong>vestments<br />
BP project Phase Capacity b/d Target s<strong>tar</strong>t up date<br />
Sunrise 1 50,000 2012<br />
SAGD 2 50,000 2014<br />
3 50,000 2016<br />
4 50,000 2018<br />
Appendix 2: Shell <strong>in</strong>vestments<br />
Shell project Phase Capacity b/d Target s<strong>tar</strong>t up date<br />
Athabasca <strong>Oil</strong> S<strong>and</strong>s Current Muskeg River 155,000 2002<br />
Project (AOSP) Muskeg River expansion & 115,000 2010<br />
debottleneck<strong>in</strong>g<br />
Jackp<strong>in</strong>e Phase 1A 100,000 2010<br />
Jackp<strong>in</strong>e Phase 1B 100,000 2012<br />
Jackp<strong>in</strong>e Phase 2 100,000 2014<br />
Pierre River Phase 1 100,000 2018<br />
Pierre River Phase 2 100,000 2021<br />
Cold Lake Orion Phase 1 10,000 2007<br />
Phase 2 10,000 2009<br />
Peace River Cadotte Lake 12,500 1986<br />
Carmon Creek Phase 1 37,500 2010<br />
Carmon Creek Phase 2 50,000 2015<br />
Appendix 3: BP assets<br />
Asset<br />
Production<br />
method<br />
Current production<br />
capacity (b/d)<br />
Possible recovery<br />
capacity barrels<br />
S<strong>tar</strong>t date Partners Development<br />
In situ projects<br />
Sunrise SAGD 60,000 2.25 billion 2012 50% Husky<br />
Up to 200,000 b/d<br />
between 2015–2020<br />
Kirby<br />
Probably SAGD<br />
60–70,000<br />
estimated potential<br />
? ?<br />
BP owns l<strong>and</strong> leases <strong>and</strong> recently<br />
announced it is seek<strong>in</strong>g partners to<br />
develop a project here.<br />
No firm deal exists yet but BP has referred<br />
to its potential on a number of occasions<br />
Ref<strong>in</strong>ery projects<br />
Toledo Ref<strong>in</strong>ery<br />
155,000 of which<br />
60,000 is currently<br />
heavy oil<br />
1919 50% Husky<br />
170,000 by 2015 of which<br />
120,000 will be syncrude<br />
Whit<strong>in</strong>g Ref<strong>in</strong>ery<br />
405,000 of which<br />
95,000 is currently<br />
heavy oil<br />
1890 100% BP<br />
Currently await<strong>in</strong>g regulatory approval<br />
for $3.8billion reconfigur<strong>in</strong>g to <strong>in</strong>crease<br />
syncrude ref<strong>in</strong><strong>in</strong>g by 260,000 b/d by 2011<br />
Gas projects<br />
Trans-Alaska-Denali<br />
Pipel<strong>in</strong>e<br />
Gas pipel<strong>in</strong>e 2019? ConocoPhillips<br />
Mist Mounta<strong>in</strong> Coal bed methane ? ? ? ?<br />
In April 2008, BP <strong>and</strong> ConocoPhillips<br />
announced they are push<strong>in</strong>g ahead with<br />
this major gas pipel<strong>in</strong>e<br />
BP is spend<strong>in</strong>g $100 million on explor<strong>in</strong>g this<br />
coal field <strong>and</strong> plans to <strong>in</strong>vest $3billion if it goes<br />
ahead. The June announcement of the BC<br />
government grant<strong>in</strong>g tenure has been delayed<br />
Noel Tight Gas Tight gas ? ? ? ?<br />
28