03.01.2014 Views

GDSN Interoperability Test Final Report - GS1

GDSN Interoperability Test Final Report - GS1

GDSN Interoperability Test Final Report - GS1

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

DGI <strong>Interoperability</strong> <strong>Test</strong>ing<br />

A Data Pool is deemed interoperable with the <strong>Test</strong> Group in the<br />

<strong>Interoperability</strong> <strong>Test</strong> Event if it completes the required test cases of<br />

the <strong>Test</strong> Criteria. A Data Pool is either interoperable or it is not<br />

interoperable with members of the <strong>Test</strong> Group passing the final run.<br />

Waivers or exceptions are not given in demonstrating<br />

interoperability for the <strong>Test</strong> Criteria unless the entire <strong>Test</strong> group and<br />

DGI agree.<br />

DGI engenders a neutral testing environment to facilitate<br />

interoperability and conformance testing. It is DGI’s purpose to<br />

facilitate interoperability among the largest group of Data Pools in<br />

the <strong>Test</strong> group in an objective manner.<br />

A DGI <strong>Interoperability</strong> <strong>Test</strong> Event has three progressively more<br />

stringent phases. The phases include:<br />

1. Debug Phase,<br />

2. Dry Run Phase<br />

3. <strong>Final</strong> Run Phase<br />

Each phase becomes more and more stringent with respect to<br />

testing requirements and pass/fail criteria.<br />

The Debug Phase is for the purpose of debugging Data Pools and<br />

enhancing stability in preparation of the Dry Run phase. Code<br />

changes and retesting of the test instances are frequent and<br />

necessary to create a stable and interoperable test group.<br />

The Dry Run Phase is composed of single or multiple practice<br />

periods. The Dry Run duplicates the subsequent <strong>Final</strong> Run phase.<br />

Data pools not demonstrating interoperability over the test cases<br />

with all members of the <strong>Test</strong> Group by the end of this phase may<br />

not participate in the <strong>Final</strong> Run Phase.<br />

The <strong>Final</strong> Run Phase is the Phase where Data Pools that have<br />

successfully completed the Debug and Dry Run Phases<br />

demonstrate interoperability in executing all test cases through fullmatrix<br />

testing. In this phase, no error in any test instances may<br />

occur without all parties involved being declared administratively<br />

failed until further investigation by DGI. Completion of this phase<br />

creates the certified interoperable data pools.<br />

Copyright © Drummond Group Inc. 2005 <strong>GDSN</strong> 3Q05 <strong>Final</strong> <strong>Report</strong> page 12

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!