05.01.2014 Views

Peter Pope

Peter Pope

Peter Pope

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Chronology<br />

• September 20, 2010 – Range collects gas<br />

samples.<br />

• October 13, 2010 – Landowner contacts<br />

RRC District Office to advise that EPA will<br />

sample his well in late October to determine<br />

source of gas.<br />

• October 15, 2010 – Range pressure tests<br />

Butler 1-H well. Held 845 psi.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!