EIR Team Summary of<br />

PRELIMINARY<br />

Observations and Conclusions<br />

‣ The general methodology of the EIS was consistent<br />

with the regulatory requirements of an EIS and served<br />

to evaluate the protectiveness of the various closure<br />

alternatives at the <strong>Hanford</strong> <strong>Site</strong>. {Section 2.3.1.2 }<br />

‣ As a further comment about QA/QC, the reports on the evaluations of<br />

their QA/QC said they had to meet DOE Order 414.1.C requirements.<br />

It is not documented that they did so. So there is a possible deficiency<br />

with regard to meeting QA/QC requirements set out by DOE itself.<br />

1/3/2011 20<br />

HAB 2-17-2010 Presentation – Contract # 046-007-000<br />

<strong>KD</strong> <strong>Auclair</strong> & <strong>Associates</strong>, <strong>LLC</strong>