KD Auclair & Associates, LLC - Hanford Site
KD Auclair & Associates, LLC - Hanford Site
KD Auclair & Associates, LLC - Hanford Site
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
EIR Team Summary of<br />
PRELIMINARY<br />
Observations and Conclusions<br />
‣ The general methodology of the EIS was consistent<br />
with the regulatory requirements of an EIS and served<br />
to evaluate the protectiveness of the various closure<br />
alternatives at the <strong>Hanford</strong> <strong>Site</strong>. {Section 2.3.1.2 }<br />
‣ As a further comment about QA/QC, the reports on the evaluations of<br />
their QA/QC said they had to meet DOE Order 414.1.C requirements.<br />
It is not documented that they did so. So there is a possible deficiency<br />
with regard to meeting QA/QC requirements set out by DOE itself.<br />
1/3/2011 20<br />
HAB 2-17-2010 Presentation – Contract # 046-007-000<br />
<strong>KD</strong> <strong>Auclair</strong> & <strong>Associates</strong>, <strong>LLC</strong>