Muon Spectrometer<br />

Commissioning<br />

and<br />

Integration<br />

<strong>Joao</strong> <strong>Guimaraes</strong> <strong>da</strong> <strong>Costa</strong><br />

Physics Overview<br />

<strong>Harvard</strong> <strong>University</strong><br />

<strong>Laboratory</strong> <strong>of</strong> <strong>Particle</strong> Physics and Cosmology<br />

DoE Site Visit 2007<br />

August 27, 2007<br />

Masahiro Morii<br />

for<br />

Kevin Black, Lashkar Kashif,


MDT Endcap Early 2007<br />

January 2007<br />

First wheel construction<br />

Srivas<br />

George<br />

Verena<br />

<strong>Joao</strong><br />

Muon Spectrometer Integration -- DOE site visit 2007 -- <strong>Joao</strong> <strong>Guimaraes</strong><br />

2


Sector-by-Sector Commissioning<br />

• MDT-EC chambers were commissioned at different stages<br />

• At construction sites<br />

• At the sector-assembly building<br />

• At surface before being lowered into the cavern<br />

• Sector-by-sector in the cavern<br />

Using stan<strong>da</strong>lone DAQ station<br />

In collaboration with colleagues<br />

from<br />

Michigan and BU<br />

Verena<br />

Srivas<br />

George<br />

Muon Spectrometer Integration -- DOE site visit 2007 -- <strong>Joao</strong> <strong>Guimaraes</strong><br />

3


Integration <strong>of</strong> MDT chambers with<br />

global DAQ readout, trigger, online monitoring<br />

and <strong>of</strong>fline s<strong>of</strong>tware<br />

Germany<br />

Greece<br />

Italy<br />

Austria<br />

Netherlands<br />

MDT<br />

MDT<br />

Barrel<br />

Endcap<br />

MDT System<br />

USA<br />

Russia<br />

Muon Spectrometer Integration -- DOE site visit 2007 -- <strong>Joao</strong> <strong>Guimaraes</strong><br />

4


Tasks at Hand<br />

Connect Wheels to the Outside World<br />

• Obtain Hardware:<br />

• Power supplies<br />

• Readout boards (MRODs)<br />

• Cables/Connections<br />

• Gas<br />

• Safety systems (smoke<br />

detectors, etc)<br />

GOAL<br />

Take <strong>da</strong>ta from control room<br />

integrated with ATLAS detector<br />

using<br />

final configurations as much as possible<br />

• Setup integrated system:<br />

• Readout s<strong>of</strong>tware<br />

• Slow controls<br />

• Online monitoring<br />

• Configure <strong>of</strong>fline s<strong>of</strong>tware<br />

Drive<br />

completion <strong>of</strong><br />

detector<br />

Muon Spectrometer Integration -- DOE site visit 2007 -- <strong>Joao</strong> <strong>Guimaraes</strong><br />

5


ATLAS Integration Runs (Milestone 2)<br />

Offline<br />

Data Storage<br />

Event Building<br />

Central Trigger<br />

Central DAQ<br />

Monitoring<br />

Calorimeters<br />

Muon Spectrometer<br />

Inner Detector<br />

Tile LAr Barrel<br />

Endcap<br />

Pixel TRT SCT<br />

MDT RPC MDT<br />

TGC<br />

CSC<br />

Timeline<br />

M2<br />

Muon Spectrometer Integration -- DOE site visit 2007 -- <strong>Joao</strong> <strong>Guimaraes</strong><br />

Feb. 28 6


ATLAS Integration Runs (Milestone 3)<br />

Offline<br />

Data Storage<br />

Event Building<br />

Central Trigger<br />

Central DAQ<br />

Monitoring<br />

Calorimeters<br />

Muon Spectrometer<br />

Inner Detector<br />

Tile LAr Barrel<br />

Endcap<br />

Pixel TRT SCT<br />

MDT RPC MDT<br />

TGC<br />

CSC<br />

Timeline<br />

M2 M3<br />

Muon Spectrometer Integration -- DOE site visit 2007 -- <strong>Joao</strong> <strong>Guimaraes</strong><br />

Feb. 28 Jun. 4 7


ATLAS Integration Runs (Milestone 4)<br />

Offline<br />

Data Storage<br />

Event Building<br />

Central Trigger<br />

Central DAQ<br />

Monitoring<br />

Calorimeters<br />

Muon Spectrometer<br />

Inner Detector<br />

Tile LAr Barrel<br />

Endcap<br />

Pixel TRT SCT<br />

MDT RPC MDT<br />

TGC<br />

CSC<br />

Timeline<br />

M2 M3 M4<br />

Feb. 28 Jun. 4 Aug. 23<br />

Muon Spectrometer Integration -- DOE site visit 2007 -- <strong>Joao</strong> <strong>Guimaraes</strong>


The first sector (5 chambers)<br />

March 2007<br />

First readout with<br />

final electronics<br />

from USA15<br />

Muon Spectrometer Integration -- DOE site visit 2007 -- <strong>Joao</strong> <strong>Guimaraes</strong><br />

9


Cosmic Ray run<br />

(Milestone 3 - June 4)<br />

14 MDT chambers<br />

1 trigger sector (TGC)<br />

First display <strong>of</strong> an<br />

endcap cosmic ray track<br />

Kevin Black<br />

Muon Spectrometer Integration -- DOE site visit 2007 -- <strong>Joao</strong> <strong>Guimaraes</strong><br />

10


Lessons from M3<br />

(MDT Monitoring)<br />

• Data storage problems (slow access to tape)<br />

• Trigger prescaled (~60) due to <strong>da</strong>ta writing speed!!<br />

• Lack <strong>of</strong> calibrations available for online and <strong>of</strong>fline studies<br />

• Official procedure very slow (month) -- <strong>of</strong>fline calibration centers<br />

• Srivas calibrated with online <strong>da</strong>ta --> FAST<br />

• Detector and <strong>da</strong>ta quality monitoring<br />

• High level monitoring (<strong>of</strong>fline, tracks) }Flying<br />

• Low level monitoring (DAQ crate level)<br />

blind<br />

• Barrel MDT run for one week with wrong timing!<br />

Decided to help with MDT Online Monitoring<br />

Michael Kagan<br />

Shulamit Moed<br />

Provide fast <strong>da</strong>ta quality<br />

feedback <strong>of</strong> muon system<br />

(both endcap and barrel)<br />

See Shulamit’s talk for details<br />

Muon Spectrometer Integration -- DOE site visit 2007 -- <strong>Joao</strong> <strong>Guimaraes</strong><br />

11


Alberto Belloni<br />

Michael Kagan<br />

Summer 2007<br />

Additions to the Team<br />

Masahiro Morii<br />

Essential for<br />

Milestone 4 Run<br />

Jee Woo Peter Park<br />

Shulamit Moed<br />

Chin Lin Woo<br />

Muon Spectrometer Integration -- DOE site visit 2007 -- <strong>Joao</strong> <strong>Guimaraes</strong><br />

12


Progress!<br />

(Now: Milestone 4 - Aug. 23)<br />

80 MDT chambers<br />

4 trigger sectors (TGC)<br />

More chambers integrated<br />

NOW then the MDT barrel<br />

Jan 2007<br />

See Alberto’s talk for details<br />

Number <strong>of</strong> chambers integrated<br />

Barrel Endcap<br />

Aug 2007<br />

50% <strong>of</strong> chamber installed<br />

are already integrated<br />

Muon Spectrometer Integration -- DOE site visit 2007 -- <strong>Joao</strong> <strong>Guimaraes</strong><br />

13


Plan for Future<br />

• Proceed with integration <strong>of</strong> big wheel side A<br />

• Drive the integration <strong>of</strong> the endcap and barrel MDT<br />

• Configuration <strong>of</strong> DAQ s<strong>of</strong>tware for both endcap and barrel<br />

• Verena organizing manual for MDT shifters<br />

• Shifters training<br />

• Maintain responsibility for the DAQ for the endcap<br />

MDT (extend help to the barrel system)<br />

• Alberto Belloni<br />

• Verena Martinez Outschoorn<br />

• Srivas Prasad<br />

• Provide quick online monitoring feedback<br />

• Shulamit Moed, Michael Kagan<br />

}Already indispensable<br />

in the control room<br />

Muon Spectrometer Integration -- DOE site visit 2007 -- <strong>Joao</strong> <strong>Guimaraes</strong><br />

14