The <strong>Borough</strong> <strong>of</strong> <strong>Hightstown</strong><br />

Water Department<br />

148 N. Main St.<br />

<strong>Hightstown</strong>, New Jersey 08520<br />

Telephone: 609-490-5117<br />

Facsimile: 609-490-5111<br />

<strong>August</strong> 1, <strong>2012</strong><br />

To:<br />

From:<br />

Re:<br />

Michael Theokas<br />

<strong>Borough</strong> Administrator<br />

Sean McGuire<br />

Water Plant Operator<br />

Fluoride System<br />

In order to place the Fluoride System into operation, we will need to purchase two<br />

(2) chemical pumps. (One for the supply to the town and one for the fill supply<br />

tank – the second will also serve as a back-up pump) the approximate cost <strong>of</strong><br />

$890.00 per pump. ($1,780.00).<br />

We will also need approximately three (3) work days (24 hrs.) to clear the room <strong>of</strong><br />

storage and to prepare for the Fluoride feed. For safety, the ceiling ventilation in<br />

the room will also need improvement at an approximate cost <strong>of</strong> $72.00.<br />

We have 90 gallons <strong>of</strong> fluoride on hand as <strong>of</strong> <strong>August</strong> 1, <strong>2012</strong>, but will need an<br />

estimated 675 additional gallons to complete the year.<br />

Our budget line for Fluoride has a current balance <strong>of</strong> $9,000.00 for <strong>2012</strong>. It is<br />

assumed that the cost <strong>of</strong> the chemical will rise when we go out for bid. (I believe<br />

we are in the 2 nd year <strong>of</strong> a 2 year contract.)<br />

The purchase Personal Protection Equipment for the safe handling <strong>of</strong> Hydr<strong>of</strong>luoric<br />

Acid is also needed. This would include respirators, goggles and chemical suits.<br />

The estimated start up cost for this equipment is $350.00, with additional costs to<br />

be incurred as supplies need to be replaced.<br />

Please let me know if you need additional information.