16.01.2014 Views

Analyses of Hydrogen Storage Materials and On-Board Systems

Analyses of Hydrogen Storage Materials and On-Board Systems

Analyses of Hydrogen Storage Materials and On-Board Systems

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Approach<br />

Overview<br />

Our on-board cost <strong>and</strong> performance estimates are based on detailed<br />

technology assessment <strong>and</strong> bottom-up cost modeling.<br />

Performance/<br />

Tech Assessment<br />

•Literature Search<br />

•Outline Assumptions<br />

•System Design <strong>and</strong><br />

Configurations<br />

•Process Models<br />

Cost Modeling<br />

•Document BOM<br />

•Determine Material<br />

Costs<br />

•Identify Processes <strong>and</strong><br />

Mnf. Equipment<br />

•Sensitivity <strong>Analyses</strong><br />

Overall Model<br />

Refinement<br />

•Developer <strong>and</strong><br />

Industry Feedback<br />

•Revise Assumptions<br />

<strong>and</strong> Model Inputs<br />

Interconnect<br />

Forming<br />

<strong>of</strong><br />

Interconnect<br />

Shear<br />

Interconnect<br />

Paint Braze<br />

onto<br />

Interconnect<br />

Braze<br />

$14<br />

$12<br />

Assembly &<br />

Inspection<br />

BOP<br />

Anode<br />

Anode<br />

Powder Prep<br />

Tape Cast<br />

Slip Cast<br />

Electrolyte<br />

Electrolyte<br />

Small Powder<br />

Prep<br />

Vacuum<br />

Plasma<br />

Spray<br />

Screen<br />

Print<br />

Fabrication<br />

Blanking /<br />

Slicing<br />

Sinter in Air<br />

1400C<br />

QC Leak<br />

Check<br />

Cathode<br />

Cathode<br />

Small Powder<br />

Prep<br />

Screen<br />

Print<br />

Vacuum<br />

Plasma<br />

Spray<br />

Sinter in Air<br />

Finish Edges<br />

System Cost, $/kWh<br />

$10<br />

$8<br />

$6<br />

$4<br />

Dehydriding Subsystem<br />

Tank<br />

Media<br />

Slurry Spray<br />

Slurry<br />

Spray<br />

Stack Assembly<br />

$2<br />

Note: Alternative production processes appear in gray to the<br />

bottom <strong>of</strong> actual production processes assumed<br />

$0<br />

TIAX Base Case 5,000 psi 10,000 psi<br />

BOM = Bill <strong>of</strong> <strong>Materials</strong><br />

SL/042905/D0268 ST19_Lasher_H2 <strong>Storage</strong>_final1.ppt<br />

3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!