<strong>Procurement</strong> <strong>Guidelines</strong><br />
performance requirements would result in extra cost, or loss of revenue or loss<br />
of other benefits to the borrower. Provision may also be made for a bonus to<br />
be paid to suppliers or contractors for completion of works or delivery of goods<br />
ahead of the times specified in the contract when such earlier completion or<br />
delivery would be of benefit to the borrower.<br />
Force Majeure<br />
2.42 The conditions of contract shall stipulate that failure on the part of the<br />
parties to perform their obligations under the contract will not be considered a<br />
default if such failure is the result of an event of force majeure as defined in the<br />
conditions of contract.<br />
Applicable Law and Settlement of Disputes<br />
2.43 The conditions of contract shall include provisions dealing with the<br />
applicable law and the forum for the settlement of disputes. International<br />
commercial arbitration has practical advantages over other methods for the<br />
settlement of disputes. Therefore, ADB recommends that borrowers use this<br />
type of arbitration in contracts for the procurement of goods and works. ADB<br />
shall not be named arbitrator or be asked to name an arbitrator. In case of<br />
works contracts, supply and installation contracts, and turnkey contracts, the<br />
dispute settlement provision shall also include mechanisms such as dispute<br />
review boards or adjudicators, which are designed to permit a speedier dispute<br />
settlement.<br />
C. Bid Opening, Evaluation, and Award of Contract<br />
Time for Preparation of Bids<br />
2.44 The time allowed for the preparation and submission of bids shall be<br />
determined with due consideration of the particular circumstances of the<br />
project and the magnitude and complexity of the contract. Generally, not less<br />
than six weeks from the date of the invitation to bid or the date of availability<br />
of bidding documents, whichever is later, shall be allowed for ICB. Where<br />
large works or complex items of equipment are involved, a longer period may<br />
be necessary to enable prospective bidders to conduct investigations before