18.02.2014 Views

LED Lighting Today and in Your Future - EEB Hub

LED Lighting Today and in Your Future - EEB Hub

LED Lighting Today and in Your Future - EEB Hub

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>LED</strong> <strong>Light<strong>in</strong>g</strong> <strong>Today</strong> <strong>and</strong> <strong>in</strong> <strong>Your</strong> <strong>Future</strong><br />

S<strong>and</strong>ra Stashik, PE, FIES, LEED AP<br />

Specification Market<strong>in</strong>g Manager<br />

Acuity Br<strong>and</strong>s <strong>Light<strong>in</strong>g</strong>


Learn<strong>in</strong>g Objectives<br />

• Underst<strong>and</strong> a Brief History of <strong>LED</strong> Development<br />

• Underst<strong>and</strong> the market transformation to <strong>LED</strong>s <strong>and</strong><br />

have a look to the future of <strong>LED</strong> sources<br />

• Know the benefits <strong>and</strong> challenges of us<strong>in</strong>g white<br />

<strong>LED</strong>s for architectural applications<br />

• Know which questions to ask when evaluat<strong>in</strong>g <strong>LED</strong><br />

lum<strong>in</strong>aires<br />

Dec. 11, 2012<br />

<strong>EEB</strong> HUB Presentation ©2012 Acuity Br<strong>and</strong>s <strong>Light<strong>in</strong>g</strong>,<br />

Inc. All rights reserved.<br />

2


A Brief <strong>LED</strong> History<br />

• 1962 First visible <strong>LED</strong> (Holonyak@GE)<br />

– 0.001 lumens<br />

• 1960’s Red <strong>LED</strong>s (H.P. <strong>and</strong> Monsanto)<br />

– 0.01 lumens<br />

• 1970’s–1980’s Green <strong>LED</strong>s, Watches, Calculators<br />

– 0.1 lumens<br />

• 1990’s Blue <strong>LED</strong>s (Nakamura@Nichia)<br />

– 1 lumen<br />

• 2000+<br />

– 10-100 lumens<br />

• 2005<br />

– 1000 lumens (multichip packages)<br />

• 2011<br />

– 3000+ lumens (multichip packages)<br />

Dec. 11, 2012<br />

<strong>EEB</strong> HUB Presentation ©2012 Acuity Br<strong>and</strong>s<br />

<strong>Light<strong>in</strong>g</strong>, Inc. All rights reserved.<br />

4


A Fast- Chang<strong>in</strong>g Market<br />

Size of Market by Source ($10 billion)<br />

2008 2012<br />

L<strong>in</strong>ear FL.<br />

42%<br />

L<strong>in</strong>ear FL.<br />

43%<br />

- projected<br />

Inc<strong>and</strong>.<br />

25%<br />

Other<br />

2%<br />

HID<br />

7%<br />

CFL<br />

21%<br />

Inc<strong>and</strong>.<br />

21%<br />

Other<br />

1%<br />

HID<br />

5%<br />

CFL<br />

19%<br />

<strong>LED</strong><br />

3%<br />

($300M)<br />

Source: Strategies <strong>in</strong> Light 2009<br />

<strong>LED</strong><br />

11%<br />

($1.1billion)<br />

Dec. 11, 2012<br />

<strong>EEB</strong> HUB Presentation ©2012 Acuity Br<strong>and</strong>s <strong>Light<strong>in</strong>g</strong>, Inc.<br />

All rights reserved.<br />

5


DOE – Driv<strong>in</strong>g SSL Transformation<br />

Dec. 11, 2012<br />

<strong>EEB</strong> HUB Presentation ©2012 Acuity Br<strong>and</strong>s <strong>Light<strong>in</strong>g</strong>, Inc.<br />

All rights reserved.<br />

6


DOE <strong>Light<strong>in</strong>g</strong> Facts<br />

St<strong>and</strong>ardized summary of verifiable<br />

product performance data, measured<br />

by <strong>in</strong>dustry st<strong>and</strong>ardized test<strong>in</strong>g<br />

• Industry tool to help buyers<br />

• Resource to evaluate reported<br />

product performance aga<strong>in</strong>st<br />

manufacturer claims<br />

• Label <strong>and</strong> product list data<br />

backed by verification of<br />

performance test<strong>in</strong>g<br />

• Provides “apples-to-apples”<br />

comparison<br />

• Open-access program <strong>and</strong><br />

product<br />

Dec. 11, 2012<br />

<strong>EEB</strong> HUB Presentation ©2012 Acuity Br<strong>and</strong>s <strong>Light<strong>in</strong>g</strong>, Inc.<br />

All rights reserved.<br />

7


DOE Programs for SSL<br />

Lum<strong>in</strong>ous Efficacy (LM/W)<br />

Lum<strong>in</strong>ous Efficacy (LM/W)<br />

60<br />

60<br />

Claimed<br />

Claimed<br />

Measured<br />

Measured<br />

50<br />

50<br />

40<br />

40<br />

30<br />

30<br />

20<br />

20<br />

10<br />

10<br />

Dec. 11, 2012<br />

0<br />

Downlight<br />

0<br />

Downlight<br />

Downlight<br />

Downlight<br />

Downlight<br />

Downlight<br />

Downlight<br />

RT5D<strong>LED</strong><br />

Downlight<br />

RT5D<strong>LED</strong><br />

Outdoor Area<br />

Surface Mount<br />

Outdoor Area<br />

Tasklight<br />

Surface Mount<br />

Tasklight<br />

Tasklight<br />

Tasklight<br />

Undercab<strong>in</strong>et<br />

Undercab<strong>in</strong>et<br />

Undercab<strong>in</strong>et<br />

Undercab<strong>in</strong>et<br />

Undercab<strong>in</strong>et<br />

http://www1.eere.energy.gov/build<strong>in</strong>gs/ssl/reports.html<br />

<strong>EEB</strong> HUB Presentation ©2012 Acuity Br<strong>and</strong>s <strong>Light<strong>in</strong>g</strong>, Inc.<br />

All rights reserved.<br />

Undercab<strong>in</strong>et<br />

Undercab<strong>in</strong>et<br />

Undercab<strong>in</strong>et<br />

Undercab<strong>in</strong>et<br />

Undercab<strong>in</strong>et<br />

8


The Promise of <strong>LED</strong> Digital <strong>Light<strong>in</strong>g</strong>…<br />

• efficient<br />

• long last<strong>in</strong>g, “green” technology<br />

• aesthetic (color, size/form factor,<br />

architectural <strong>in</strong>tegration)<br />

• high quality of illum<strong>in</strong>ation<br />

• <strong>in</strong>telligent, adaptive<br />

• simple, configurable, scalable<br />

• cost effective<br />

Dec. 11, 2012<br />

<strong>EEB</strong> HUB Presentation ©2012 Acuity Br<strong>and</strong>s <strong>Light<strong>in</strong>g</strong>,<br />

Inc. All rights reserved.<br />

9


<strong>LED</strong> Benefits<br />

Benefits<br />

Energy efficient<br />

Directional<br />

Long life<br />

Inf<strong>in</strong>itely dimmable<br />

No Mercury, UV or IR<br />

Rugged<br />

Instant On<br />

Love cold temperatures<br />

Dec. 11, 2012<br />

<strong>EEB</strong> HUB Presentation ©2012 Acuity Br<strong>and</strong>s<br />

<strong>Light<strong>in</strong>g</strong>, Inc. All rights reserved.<br />

11


SSL Lum<strong>in</strong>aire Test<strong>in</strong>g<br />

Validation Test<strong>in</strong>g<br />

• Above <strong>and</strong> Beyond UL8750<br />

• IP Rat<strong>in</strong>gs<br />

• FCC Compliance<br />

• Transportation Vibrations<br />

• Surge Test<strong>in</strong>g<br />

Manufactur<strong>in</strong>g Test<strong>in</strong>g<br />

• Early Life Failure detection<br />

• 10 Cycles – On-Off<br />

Dec. 11, 2012<br />

<strong>EEB</strong> HUB Presentation ©2012 Acuity Br<strong>and</strong>s <strong>Light<strong>in</strong>g</strong>, Inc.<br />

All rights reserved.<br />

12


There are so many good reasons to renovate…<br />

Dec. 11, 2012<br />

<strong>EEB</strong> HUB Presentation ©2012 Acuity Br<strong>and</strong>s<br />

<strong>Light<strong>in</strong>g</strong>, Inc. All rights reserved.<br />

13


<strong>LED</strong>s at The Home Depot<br />

• Available for sale s<strong>in</strong>ce 2009<br />

• Now offer 104 <strong>LED</strong> options <strong>in</strong>-store <strong>and</strong> on-l<strong>in</strong>e<br />

• Key to success is commitment to quality <strong>and</strong> partner<strong>in</strong>g<br />

with world-class manufacturers<br />

• Conduct thorough quality test<strong>in</strong>g on all <strong>LED</strong> skus<br />

• M<strong>and</strong>ate participation <strong>in</strong> <strong>Light<strong>in</strong>g</strong> Facts program<br />

• Product must meet our customer’s expectations<br />

Dec. 11, 2012<br />

Courtesy of Bill Hamilton – The Home Depot, 2012 Solid State Market Introduction Workshop<br />

<strong>EEB</strong> HUB Presentation ©2012 Acuity Br<strong>and</strong>s <strong>Light<strong>in</strong>g</strong>, Inc.<br />

All rights reserved.<br />

14


Commercial Build<strong>in</strong>g Energy Use<br />

350 TWh/Yr<br />

L<strong>in</strong>ear fluorescent alone =<br />

250 TWh/Yr<br />

Dec. 11, 2012<br />

<strong>EEB</strong> HUB Presentation ©2012 Acuity Br<strong>and</strong>s <strong>Light<strong>in</strong>g</strong>,<br />

Inc. All rights reserved.<br />

15


But surely<br />

most<br />

commercial<br />

light<strong>in</strong>g has<br />

already been<br />

retrofit, right?<br />

Dec. 11, 2012<br />

<strong>EEB</strong> HUB Presentation ©2012 Acuity Br<strong>and</strong>s <strong>Light<strong>in</strong>g</strong>, Inc.<br />

All rights reserved.<br />

16


DOE Report – 2012 <strong>Light<strong>in</strong>g</strong> Market Characterization<br />

In all applications sectors:<br />

• 2.4 billion l<strong>in</strong>ear fluorescent lamps <strong>in</strong>stalled<br />

• Nearly 1 billion of those are still T12!<br />

In the Commercial Sector alone:<br />

• 1.65 billion l<strong>in</strong>ear fluorescent lamps <strong>in</strong>stalled<br />

• Over ½ billion of those are still T12!<br />

Dec. 11, 2012<br />

<strong>EEB</strong> HUB Presentation ©2012 Acuity Br<strong>and</strong>s <strong>Light<strong>in</strong>g</strong>,<br />

Inc. All rights reserved.<br />

17


Renovat<strong>in</strong>g the <strong>in</strong>stalled base<br />

• Relamp <strong>and</strong> Reballast<br />

• Install ES lamps <strong>and</strong> ballasts<br />

• No change <strong>in</strong> appearance of the space<br />

• Retrofit with new reflector<br />

• <strong>Light<strong>in</strong>g</strong> quality can be dim<strong>in</strong>ished<br />

• Potentially negative change <strong>in</strong> appearance<br />

• Replace – 1 for 1 with new fixture<br />

• Labor <strong>and</strong> extra material waste<br />

• Redesign – new layout <strong>and</strong> wir<strong>in</strong>g<br />

• Permits required – major undertak<strong>in</strong>g<br />

Dec. 11, 2012<br />

<strong>EEB</strong> HUB Presentation ©2012 Acuity Br<strong>and</strong>s <strong>Light<strong>in</strong>g</strong>, Inc.<br />

All rights reserved.<br />

18


Fluorescent <strong>and</strong> <strong>LED</strong> Retrofit Kits<br />

• Fastest <strong>and</strong> simplest <strong>in</strong>stallation = Lower <strong>in</strong>stalled cost<br />

• Higher efficiencies = Best “bang for the buck”<br />

• Better price po<strong>in</strong>ts = Faster paybacks!<br />

> 80% efficiencies 93 lumens / watt<br />

Dec. 11, 2012<br />

<strong>EEB</strong> HUB Presentation ©2012 Acuity Br<strong>and</strong>s <strong>Light<strong>in</strong>g</strong>, Inc.<br />

All rights reserved.<br />

L80 = 50,000 hrs.<br />

5 Year Warranty<br />

19


<strong>LED</strong> Retrofit Kit<br />

Simple lower brackets slide <strong>in</strong>to<br />

place to support doorframe <strong>and</strong><br />

provide h<strong>in</strong>g<strong>in</strong>g <strong>and</strong> latch<strong>in</strong>g po<strong>in</strong>ts<br />

Unitized light eng<strong>in</strong>e h<strong>in</strong>ges to<br />

brackets for poke-home wir<strong>in</strong>g<br />

<strong>and</strong> sw<strong>in</strong>gs <strong>in</strong>to place<br />

Post-pa<strong>in</strong>ted steel doorframe<br />

assembly h<strong>in</strong>ges <strong>and</strong> latches <strong>in</strong><br />

place<br />

Dec. 11, 2012<br />

<strong>EEB</strong> HUB Presentation ©2012 Acuity Br<strong>and</strong>s <strong>Light<strong>in</strong>g</strong>, Inc.<br />

All rights reserved.<br />

20


“Extreme Makeover” – Small Conference Room<br />

(Before)<br />

Dec. 11, 2012<br />

<strong>EEB</strong> HUB Presentation ©2012 Acuity Br<strong>and</strong>s <strong>Light<strong>in</strong>g</strong>, Inc.<br />

All rights reserved.<br />

21


“Extreme Makeover” – Small Conference Room<br />

(After)<br />

52 watts<br />

saved =<br />

49%<br />

Dec. 11, 2012<br />

<strong>EEB</strong> HUB Presentation ©2012 Acuity Br<strong>and</strong>s <strong>Light<strong>in</strong>g</strong>, Inc.<br />

All rights reserved.<br />

22


Lobbies <strong>and</strong> Large Public Spaces<br />

Dec. 11, 2012<br />

<strong>EEB</strong> HUB Presentation ©2012 Acuity Br<strong>and</strong>s <strong>Light<strong>in</strong>g</strong>, Inc.<br />

All rights reserved.<br />

23


<strong>LED</strong> Downlights Revolution<br />

Round or Square<br />

Recessed, Surface, Pendant<br />

Downlight, Wallwash or Adjustable<br />

10 Beam Distributions<br />

4 Color Temperatures<br />

Less Than 1% Dimm<strong>in</strong>g St<strong>and</strong>ard<br />

6” Aperture – 2000 – 6500 Lumens<br />

Dec. 11, 2012<br />

<strong>EEB</strong> HUB Presentation ©2012 Acuity Br<strong>and</strong>s <strong>Light<strong>in</strong>g</strong>, Inc.<br />

All rights reserved.<br />

Simplify design process,<br />

lamp stock<strong>in</strong>g <strong>and</strong><br />

ma<strong>in</strong>tenance!<br />

24


Public Concourse<br />

Public Lobby Metal Halide vs. <strong>LED</strong> Downlights<br />

200,000<br />

180,000<br />

160,000<br />

140,000<br />

120,000<br />

100,000<br />

80,000<br />

60,000<br />

40,000<br />

20,000<br />

-<br />

100 watt Metal<br />

Halide<br />

8800 lm (6600<br />

mean at 6400 hrs.<br />

LCCA<br />

Basel<strong>in</strong>e System 2<br />

Initial<br />

5500 Lumen <strong>LED</strong><br />

4400 lm at L80,<br />

50,000 hrs.<br />

Operational<br />

ROI<br />

28%<br />

Dec. 11, 2012<br />

<strong>EEB</strong> HUB Presentation ©2012 Acuity Br<strong>and</strong>s <strong>Light<strong>in</strong>g</strong>,<br />

Inc. All rights reserved.<br />

25


Tailored Distribution <strong>and</strong> Intensity<br />

21’<br />

40’<br />

62’<br />

12’<br />

20 - 70<br />

Dec. 11, 2012<br />

<strong>EEB</strong> HUB Presentation ©2012 Acuity Br<strong>and</strong>s <strong>Light<strong>in</strong>g</strong>, Inc.<br />

All rights reserved.<br />

26


Application Specificity<br />

<strong>LED</strong>s are <strong>in</strong>herently directional sources<br />

Dec. 11, 2012<br />

<strong>EEB</strong> HUB Presentation ©2012 Acuity Br<strong>and</strong>s <strong>Light<strong>in</strong>g</strong>, Inc.<br />

All rights reserved.<br />

27


Performance Leverage<br />

1 2 3<br />

Lum<strong>in</strong>aire<br />

+<br />

<strong>LED</strong>s<br />

Optimized<br />

<strong>LED</strong><br />

Lum<strong>in</strong>aire<br />

Optimized<br />

Digital<br />

Lum<strong>in</strong>aire<br />

Light Output<br />

Operat<strong>in</strong>g hours<br />

Environment<br />

Controls?<br />

Dec. 11, 2012<br />

<strong>EEB</strong> HUB Presentation ©2012 Acuity Br<strong>and</strong>s<br />

<strong>Light<strong>in</strong>g</strong>, Inc. All rights reserved.<br />

29


Top Ten <strong>LED</strong> Specification Questions<br />

1. Can you supply an IES LM-79 test report?<br />

2. Can you supply IES files?<br />

3. Who is your <strong>LED</strong> supplier?<br />

4. Did they provide an IESNA LM-80 test report or report summary for the<br />

<strong>LED</strong>’s?<br />

5. Is the chromaticity <strong>in</strong> the ANSI C78.377A color space <strong>and</strong> is it stable<br />

over time?<br />

6. How much variation <strong>in</strong> color can I expect from lum<strong>in</strong>aire to lum<strong>in</strong>aire?<br />

7. Are your <strong>LED</strong> lifetime claims supported?<br />

8. What is the Power Factor for your lum<strong>in</strong>aire?<br />

9. Is your lum<strong>in</strong>aire UL 8750 (<strong>LED</strong> safety st<strong>and</strong>ard or equivalent) listed?<br />

10. What is your warranty?<br />

Dec. 11, 2012<br />

<strong>EEB</strong> HUB Presentation ©2012 Acuity Br<strong>and</strong>s <strong>Light<strong>in</strong>g</strong>,<br />

Inc. All rights reserved. 30


Questions?<br />

Thank you<br />

S<strong>and</strong>ra Stashik, PE, FIES, LEED AP<br />

S<strong>and</strong>ra.stashik@acuitybr<strong>and</strong>s.com<br />

Specification Market<strong>in</strong>g Manager<br />

Acuity Br<strong>and</strong>s <strong>Light<strong>in</strong>g</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!