IRIS - Boiler Tubes Inspection Report - Innospection
IRIS - Boiler Tubes Inspection Report - Innospection
IRIS - Boiler Tubes Inspection Report - Innospection
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
CLIENT: CLIENT DATE 02-08 FEB 2009<br />
LOCATION: REFINERY REPORT No J0001-09ME<br />
UNIT: BOILER No1 #<br />
5 5 4 4 4 4 4 4 4 4 4 4 3 3 3 3 3 3 3 3 3 3 2 2 2 2 2 2 2 2 2 2 1 1 1 1 1 1 1 1 1 1<br />
1 0 9 8 7 6 5 4 3 2 1 0 9 8 7 6 5 4 3 2 1 0 9 8 7 6 5 4 3 2 1 0 9 8 7 6 5 4 3 2 1 0 9 8 7 6 5 4 3 2 1<br />
2.0 M 2.0 M<br />
3 M 3 M<br />
4 M 4 M<br />
5 M 5 M<br />
6 M 6 M<br />
7 M 7 M<br />
8 M 8 M<br />
9 M 9 M<br />
10 M 10 M<br />
11 M 11 M<br />
12 M 12 M<br />
13.5M 13.5M<br />
NOMINAL WALL<br />
4.50 - 5.60 mm<br />
3.80 - 4.50mm<br />
CROSS SECTION VIEW BY ROW<br />
ROW 02<br />
EROSION DAMAGE<br />
3.8 - 4.5 mm<br />
3.5 - 3.8 mm<br />
3.24 - 3.5 mm<br />
2.4 to 3.24mm<br />
0.1 - 2.4 mm<br />
No Result